[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982604":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},982604,712,1,"单选题","在项目设计阶段，图纸的可施工性差的原因，不包括()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","设计单位业务众多",true,{"key":16,"text":17,"correct":18},"B","设计人员专一于设计任务本身",false,{"key":20,"text":21,"correct":18},"C","不熟悉施工环节的工作要求",{"key":23,"text":24,"correct":18},"D","“闭门造车”，脱离施工实际","图纸的可施工性差，产生的原因主要在于：①设计单位业务单一；②设计人员专一于设计任务本身；③不熟悉施工环节的工作要求；④“闭门造车”，脱离施工实际。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购项目管理","建筑工程",0]