[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982600":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},982600,712,1,"单选题","关于制订完善的技术保证措施，下列说法有误的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","要求项目各参与方参加图纸会审和各级设计交底工作，让所有参与人员都领会设计意图和技术要求",false,{"key":16,"text":17,"correct":18},"B","根据实际，对事先确定的施工工序进行灵活处理",true,{"key":20,"text":21,"correct":14},"C","协调不同专业之间的工作关系，比如土建施工应理顺与水电安装之间的关系，配合水电女装工程的预留、预埋工作",{"key":23,"text":24,"correct":14},"D","合理安排工序的穿插施工，加强成品保护。所有隐蔽工程必须经有关单位验收、签字盖章，并如实做好隐蔽记录后，方可组织下道工序的施工","制订完善的技术保证措施主要包括：①要求项目各参与方参加图纸会审和各级设计交底工作，让所有参与人员都领会设计意图和技术要求；②严格按事先确定的合理施工工序进行操作施工，发现问题及时上报；③协调不同专业之间的工作关系，比如土建施工应理顺与水电安装之间的关系，配合水电安装工程的预留、预埋工作；④合理安排工序的穿插施工，加强成品保护。所有隐蔽工程必须经有关单位验收、签字盖章，并如实做好隐蔽记录后，方可组织下道工序的施工。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购项目管理","建筑工程",0]