[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982581":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},982581,712,1,"单选题","财务风险中，关于工程价款结算方面的风险因素，下列说法不正确的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","政策调整变化",true,{"key":16,"text":17,"correct":18},"B","多算工程量",false,{"key":20,"text":21,"correct":18},"C","提高结算价",{"key":23,"text":24,"correct":18},"D","重复结算","A项属于国家财务政策风险因素。财务风险贯穿于工程项目建设的全过程，财务风险管理也极为复杂。具体的财务风险应对措施如表所示。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购项目管理","建筑工程",0]