[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982555":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},982555,712,1,"单选题","工程建设项目采用EPC承包模式时，业主方应负责的工作是()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","工程设计",false,{"key":16,"text":17,"correct":14},"B","工程协调与施工管理",{"key":19,"text":20,"correct":14},"C","设备采购",{"key":22,"text":23,"correct":24},"D","提供方案设计",true,"在工程总承包(EPC\u002FP&D+B)方式下，施工方首先是要根据业主提供招标用的工艺设计与方案设计图，在投标阶段先作出扩大初步设计图纸并据此填制工程数量清单进行投标报价。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购项目管理","建筑工程",0]