[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982501":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},982501,712,1,"单选题","下列关于工程建设项目的说法错误的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","单项工程的施工条件往往具有相对的独立性",false,{"key":16,"text":17,"correct":18},"B","分项工程是对单项工程的再分解",true,{"key":20,"text":21,"correct":14},"C","分部工程是单位工程的组成部分，按单位工程的各个部分划分",{"key":23,"text":24,"correct":14},"D","建设项目可以由一个或多个单项工程组成","B项，分项工程是对分部工程的再分解，也是建筑施工生产活动的基本元素及形成建筑产品的基本施工过程，例如主体结构工程中的钢筋工程、模板工程、混凝土工程、砌砖工程、木门窗制作等。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购项目管理","建筑工程",0]