[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982492":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},982492,712,1,"单选题","项目发起人与其任命并授权的项目经理和管理团队依据双方达成的协议来实施的、双方互动检查实现项目目标的过程是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","项目管理流程的编制",false,{"key":16,"text":17,"correct":14},"B","项目的执行管理",{"key":19,"text":20,"correct":21},"C","项目绩效管理",true,{"key":23,"text":24,"correct":14},"D","项目的验收管理","项目绩效管理是项目发起人与其任命并授权的项目经理和管理团队依据双方达成的协议实施的、双方互动检查实现项目目标的过程，协议中应对项目经理及管理团队的工作职责、管理目标、管理绩效考核、原则性的工作方式与方法等做出明确的规定。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购项目管理","建筑工程",0]