[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982481":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},982481,712,1,"单选题","根据项目的生命周期理论，在项目的生命周期中资源投入最高的阶段是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","开始阶段",false,{"key":16,"text":17,"correct":14},"B","计划阶段",{"key":19,"text":20,"correct":21},"C","执行与控制阶段",true,{"key":23,"text":24,"correct":14},"D","结束阶段","根据项目生命周期和阶段划分的特点，项目资源投入强度在项目开始时较低，此后逐渐提高，进入项目后期接近结束时又迅速下降。即在项目的执行与控制阶段，资源投入最高。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购项目管理","建筑工程",0]