[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982421":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},982421,712,1,"单选题","从招标采购项目十大管理任务的工作内容分析，编制招标采购项目管理方案属于()的工作内容。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","采购管理",false,{"key":16,"text":17,"correct":14},"B","范围管理",{"key":19,"text":20,"correct":14},"C","质量管理",{"key":22,"text":23,"correct":24},"D","整合管理",true,"整合管理是招标采购项目管理的十大任务之一，其对应的主要工作内容包括：①确定目标和任务；②编制招标采购项目管理方案、工作计划等；③制订管理流程和控制措施；④协调各种资源并实施。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购项目管理","建筑工程",0]