[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982327":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},982327,712,1,"单选题","项目管理第三层面的管理任务是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","整合管理",true,{"key":16,"text":17,"correct":18},"B","范围管理",false,{"key":20,"text":21,"correct":18},"C","风险管理",{"key":23,"text":24,"correct":18},"D","采购管理","",{"id":6,"name":27,"category":28,"favorite":29},"招标采购项目管理","建筑工程",0]