[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982325":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},982325,712,1,"单选题","项目人力资源管理的工作过程不包括()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","制订人力资源计划",false,{"key":16,"text":17,"correct":14},"B","组建项目团队",{"key":19,"text":20,"correct":14},"C","管理项目团队",{"key":22,"text":23,"correct":24},"D","人员社会保障计划",true,"项目人力资源管理主要包括以下工作过程：①制订人力资源计划，识别和记录项目角色、职责、所需技能以及汇报关系，编制人员配备管理计划；②组建项目团队，确认可用的人力资源并组建项目所需团队；③建设项目团队，提高工作能力，促进团队互动和改善团队氛围，提高项目绩效；④管理项目团队，跟踪团队成员的表现，提供反馈，解决问题并管理变更，优化项目绩效。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购项目管理","建筑工程",0]