[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-710-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":621},{"id":5,"name":6,"category":7,"favorite":8},710,"招标采购合同管理-(原案例分析)","建筑工程",0,3,50,768,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,393,405,417,429,441,453,465,477,489,501,513,525,537,549,561,573,585,597,609],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},981648,1,"单选题","承包人应提前_____天将可以开始进行竣工试验的日期通知监理人，监理人应在该日期后_____天内，确定竣工试验具体时间。()",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","14;21",false,{"key":24,"text":25,"correct":22},"B","7;14",{"key":27,"text":28,"correct":29},"C","21;14",true,{"key":31,"text":32,"correct":22},"D","21;","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},981649,"关于建设工程施工合同，下列说法不正确的是()。",[38,40,42,44],{"key":20,"text":39,"correct":29},"法律并未对发包人主体资格作特定要求，未取得房地产开发资质等级证书的发包人也可以从事房地产开发经营活动",{"key":24,"text":41,"correct":22},"《合同法》第270条明确规定建设工程合同应当采用书面形式，这体现了建设工程施工合同的要式性",{"key":27,"text":43,"correct":22},"如发包项目属于《招标投标法》规定的依法必须招标的项目，则发包人应按照法律规定的招标程序组织招标，以确定中标人",{"key":31,"text":45,"correct":22},"建设工程施工合同属于《合同法》规定的有名合同，其订立和履行必然应当同时符合《合同法》所确立的原则及规则",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},981650,"美国建筑师学会(AI A)编制的各种合同条件中，AIA系列合同文件的核心是()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"A101",{"key":24,"text":53,"correct":29},"A201",{"key":27,"text":55,"correct":22},"B101",{"key":31,"text":57,"correct":22},"B141",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},981651,"下列各项不属于建设工程合同特征的是()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"建设工程合同的标的具有特殊性",{"key":24,"text":65,"correct":22},"建设工程合同的当事人具有特定性",{"key":27,"text":67,"correct":22},"建设工程合同是诺成合同",{"key":31,"text":69,"correct":29},"建设工程合同是非要式合同",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},981652,"()模式是设计一采购一施工总承包业务和责任的延伸。",[74,76,78,80],{"key":20,"text":75,"correct":22},"设计一施工",{"key":24,"text":77,"correct":29},"交钥匙总承包",{"key":27,"text":79,"correct":22},"设计一采购一施工一运行",{"key":31,"text":81,"correct":22},"设计一采购一施工一维护",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},981653,"一般情况下，在下列解释合同文件中：①合同协议书；②通用合同条款；③发包人要求；④技术标准；⑤中标通知书；⑥专用合同条款及其附件。其优先顺序是()。",[86,88,90,92],{"key":20,"text":87,"correct":22},"①②⑥③④⑤",{"key":24,"text":89,"correct":29},"①⑥②⑤③④",{"key":27,"text":91,"correct":22},"④③⑤①⑥②",{"key":31,"text":93,"correct":22},"①②⑥⑤④③",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},981654,"下列关于承包人的设计范围的说法中，错误的是()。",[98,100,102,104],{"key":20,"text":99,"correct":22},"根据我国工程建设基本程序，工程设计依据工作进程和深度不同，一般按初步设计、施工图设计两个阶段进行",{"key":24,"text":101,"correct":29},"初步设计的内容主要是根据批准的初步设计，绘制出正确、完整和尽可能详细的建筑、安装图纸，包括建设项目分部工程的详图、零部件结构明细表、验收标准、方法、施工图预算等",{"key":27,"text":103,"correct":22},"在工程总承包合同中应明确定义设计工作的范围，确定参与设计的主体及参与的程度",{"key":31,"text":105,"correct":22},"除专用合同条款另有约定外，未经发包人同意，承包人也不得将非主体、非关键性工作分包给第三人",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},981655,"在施工专业分包合同订立时，应当注意的内容不包括()。",[110,112,114,116],{"key":20,"text":111,"correct":22},"施工专业分包合同的内容应有利于总体工程目标的实现",{"key":24,"text":113,"correct":22},"施工专业分包合同的内容应服从于总承包合同",{"key":27,"text":115,"correct":22},"各专业分包人之间的协调",{"key":31,"text":117,"correct":29},"监理人对专业分包工程的管理",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},981656,"下列发包人向勘察人（设计人）提出索赔要求不合理的是()。",[122,124,126,128],{"key":20,"text":123,"correct":22},"勘察人（设计人）提交的勘察设计成果遗漏，发包人可提出减少支付设计费",{"key":24,"text":125,"correct":22},"勘察人（设计人）提交的勘察设计成果错误，发包人可提出赔偿索赔",{"key":27,"text":127,"correct":22},"因勘察人（设计人）的其他原因造成发包人损失的，发包人可向勘察人（设计人）提出索赔",{"key":31,"text":129,"correct":29},"勘察人（设计人）未能按合同规定工期提交勘察设计文件，拖延了项目建设工期，发包人可向勘察人（设计人）提出工期索赔",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},981657,"下列不属于工程设计责任保险应承担责任的是()。",[134,136,138,140],{"key":20,"text":135,"correct":29},"建设工程周边的物质损失",{"key":24,"text":137,"correct":22},"第三者人身伤亡",{"key":27,"text":139,"correct":22},"财产损失",{"key":31,"text":141,"correct":22},"费用的赔偿责任",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},981658,"关于工程设计合同中设计人的违约责任，下列说法错误的是()。",[146,148,150,152],{"key":20,"text":147,"correct":29},"合同生效后，设计人因自身原因要求终止或解除合同，设计人应将发包人已支付的定金返还给发包人或设计人按照专用合同条款的约定向发包人支付违约金",{"key":24,"text":149,"correct":22},"由于设计人原因，未按专用合同条款约定的时间交付工程设计文件的，应按专用合同条款的约定向发包人支付违约金，前述违约金经双方确认后可在发包人应付设计费中扣减",{"key":27,"text":151,"correct":22},"由于设计人原因产生的设计问题造成工程质量事故或其他事故时，设计人除负责采取补救措施外，应当通过所投建设工程设计责任保险向发包人承担赔偿责任或者根据直接经济损失程度按专用合同条款约定向发包人支付赔偿金",{"key":31,"text":153,"correct":22},"设计人未经发包人同意擅自对工程设计进行分包的，发包人有权要求设计人解除未经发包人同意的设计分包合同，设计人应当按照专用合同条款的约定承担违约责任",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},981659,"()是建设工程施工合同的核心要素。",[158,160,162,164],{"key":20,"text":159,"correct":29},"工期",{"key":24,"text":161,"correct":22},"质量",{"key":27,"text":163,"correct":22},"索赔",{"key":31,"text":165,"correct":22},"变更",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},981660,"下列各项不属于工程总承包合同的特殊性的是()。",[170,172,174,176],{"key":20,"text":171,"correct":22},"价值工程应用",{"key":24,"text":173,"correct":22},"知识产权保护",{"key":27,"text":175,"correct":22},"投标报价复杂",{"key":31,"text":177,"correct":29},"承包模式多样",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":27,"analysis":33},981661,"关于工程质量条款，下列说法错误的是()。",[182,184,186,188],{"key":20,"text":183,"correct":22},"工程质量不合格的承包人无权主张工程价款",{"key":24,"text":185,"correct":22},"工程质量决定社会公众不特定人群的人身和财产安危，因此，工程质量应首先确保符合国家法律及质量标准的要求",{"key":27,"text":187,"correct":29},"因承包人原因造成工程质量达不到合同约定的验收标准的，发包人应承担因承包人返工造成的费用增加和（或）工期延误，并支付承包人合理利润",{"key":31,"text":189,"correct":22},"承包人在投标报价时就应当考虑发包人提高质量标准从而对工期、造价产生的影响，并将增加的费用考虑到投标报价中",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},981662,"在工程勘察设计合同的重点条款中，有关付费方式的说法错误的是()。",[194,196,198,200],{"key":20,"text":195,"correct":29},"《建设工程勘察合同示范文本（一）》约定，在合同生效后3天内，发包人应向勘察人支付勘察费的10%作为定金",{"key":24,"text":197,"correct":22},"《建设工程勘察合同示范文本（一）》约定，在提交勘察成果资料后10天内，发包人应一次付清剩余的全部勘察费",{"key":27,"text":199,"correct":22},"《建设工程勘察合同示范文本（二）》约定，可按具体的时间或实际工程进度，以合同规定的比例（以合同总额为基数）分多次支付工程进度款",{"key":31,"text":201,"correct":22},"因发包人对工程内容与技术要求提出变更时，除延误的工期需要顺延外，因变更导致勘察人的经济支出和损失应由发包人承担",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},981663,"《工程总承包合同示范文本》适用于建设项目工程总承包的()。",[206,208,210,212],{"key":20,"text":207,"correct":29},"承发包方式",{"key":24,"text":209,"correct":22},"DB方式",{"key":27,"text":211,"correct":22},"设计一施工方式",{"key":31,"text":213,"correct":22},"设计一采购一施工方式",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},981664,"下列不属于勘察设计合同的变更表现的是()。",[218,220,222,224],{"key":20,"text":219,"correct":29},"勘察设计错误的修改",{"key":24,"text":221,"correct":22},"勘察设计进度计划的变动",{"key":27,"text":223,"correct":22},"勘察设计规范的改变",{"key":31,"text":225,"correct":22},"增加合同中约定的勘察设计工作量",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":27,"analysis":33},981665,"关于勘察设计合同双方当事人的合同责任，下列说法错误的是()。",[230,232,234,236],{"key":20,"text":231,"correct":22},"勘察过程中的任何变更，经办理正式变更手续后，发包人应按实际发生的工作量支付勘察费",{"key":24,"text":233,"correct":22},"勘察人提供的勘察成果资料出现遗漏、错误或其他质量不合格问题，勘察人应无偿给予补充完善使其达到质量合格",{"key":27,"text":235,"correct":29},"在合同履行期间，由于工程停建而终止合同时，勘察人未开始工作的，应退还发包人已付的定金",{"key":31,"text":237,"correct":22},"由于勘察人原因而延误工期或未按规定时间交付报告、成果、文件，每延误一天，勘察人应偿付以勘察费为基数计算的1‰的违约金",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":27,"analysis":33},981666,"承包人应在知道或应当知道索赔事件发生后()天内，向监理人递交索赔意向通知书，并说明发生索赔事件的事由。",[242,244,246,248],{"key":20,"text":243,"correct":22},"20",{"key":24,"text":245,"correct":22},"25",{"key":27,"text":247,"correct":29},"28",{"key":31,"text":249,"correct":22},"30",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":31,"analysis":33},981667,"下列关于“发包人要求”的说法中，不正确的是()。",[254,256,258,260],{"key":20,"text":255,"correct":22},"“发包人要求”应当是完备的",{"key":24,"text":257,"correct":22},"“发包人要求”必须明确定义发包人要求的内容",{"key":27,"text":259,"correct":22},"“发包人要求”应该让业主选择最合适的投标人",{"key":31,"text":261,"correct":29},"“发包人要求”不需要足够详细，否则会限制承包人的创造力",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},981668,"工程总承包合同的发包人一般是()。",[266,268,270,272],{"key":20,"text":267,"correct":29},"项目业主",{"key":24,"text":269,"correct":22},"开发商",{"key":27,"text":271,"correct":22},"政府机构",{"key":31,"text":273,"correct":22},"工程总承包企业",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":24,"analysis":33},981669,"下列关于工程设计合同发包人违约责任的说法错误的是()。",[278,280,282,284],{"key":20,"text":279,"correct":22},"合同生效后，发包人因非设计人原因要求终止或解除合同，设计人未开始设计工作的，不退还发包人已付的定金或发包人按照专用合同条款的约定向设计人支付违",{"key":24,"text":281,"correct":29},"合同生效后，发包人因非设计人原因要求终止或解除合同，设计人已开始设计工作的，发包人应按照设计人已完成的实际工作量计算设计费并全部支付",{"key":27,"text":283,"correct":22},"发包人未按专用合同条款约定的金额和期限向设计人支付设计费的，应按专用合同条款约定向设计人支付违约金",{"key":31,"text":285,"correct":22},"发包人的上级或设计审批部门对设计文件不进行审批或本合同工程停建、缓建，发包人应在事件发生之日起15天内按通用合同条款【合同解除】的约定向设计人结算并支付设计费",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":20,"analysis":33},981670,"下列关于设计合同价款与支付的说法错误的是()。",[290,292,294,296],{"key":20,"text":291,"correct":29},"发包人和设计人应在合同协议书中选择单价合同和总价合同这两种合同价格形式中的一种",{"key":24,"text":293,"correct":22},"定金的比例不应超过合同总价款的20%",{"key":27,"text":295,"correct":22},"预付款的比例由发包人与设计人协商确定，一般不低于合同总价款的20%",{"key":31,"text":297,"correct":22},"在对已付进度款进行汇总和复核中发现错误、遗漏或重复的，发包人和设计人均有权提出修正申请",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},981671,"下列关于《建设工程设计合同示范文本》的说法错误的是()。",[302,304,306,308],{"key":20,"text":303,"correct":22},"《建设工程设计合同示范文本》分为两种、一种是《建设工程设计合同示范文本（房屋建筑工程）》，另一种是《建设工程设计合同示范文本（专业建设工程）》",{"key":24,"text":305,"correct":29},"《建设工程设计合同示范文本》由合同协议书和通用合同条款组成",{"key":27,"text":307,"correct":22},"合同协议书集中约定了合同当事人基本的合同权利义务",{"key":31,"text":309,"correct":22},"通用合同条款是合同当事人根据《建筑法》、《合同法》等法律法规的规定，就工程设计的实施及相关事项，对合同当事人的权利义务作出的原则性约定",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":31,"analysis":33},981672,"下列关于建设工程勘察设计合同的说法错误的是()。",[314,316,318,320],{"key":20,"text":315,"correct":22},"建设工程勘察设计合同分为建设工程勘察合同和建设工程设计合同两种",{"key":24,"text":317,"correct":22},"建设工程勘察设计合同的当事人为发包人与勘察设计人",{"key":27,"text":319,"correct":22},"签订勘察设计合同，应当采用书面形式，参照文本的条款，明确约定双方的权利义务",{"key":31,"text":321,"correct":29},"签订勘察设计合同，对文本条款以外的其他事项，可以不采用书面形式，只需双方当事人约定",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":24,"analysis":33},981673,"在国际工程总承包合同文本中，AIA和AGC的标准合同格式是()的主流合同条件。",[326,328,330,332],{"key":20,"text":327,"correct":22},"英国以及英联邦国家",{"key":24,"text":329,"correct":29},"美国以及受美国建筑业影响较大国家",{"key":27,"text":331,"correct":22},"亚洲开发银行",{"key":31,"text":333,"correct":22},"世界通用",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},981674,"FIDIC的全称是()。",[338,340,342,344],{"key":20,"text":339,"correct":22},"英国合同审定联合会",{"key":24,"text":341,"correct":29},"国际咨询工程师联合会",{"key":27,"text":343,"correct":22},"美国建筑师学会",{"key":31,"text":345,"correct":22},"英国土木工程师学会",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":27,"analysis":33},981675,"下列各项中，不属于采购变更范围的是()。",[350,352,354,356],{"key":20,"text":351,"correct":22},"因执行基准日期之后新颁布的法律、标准、规范引起的变更",{"key":24,"text":353,"correct":22},"发包人要求改变检查、检验、检测、试验的地点和增加的附加试验",{"key":27,"text":355,"correct":29},"对设备、材料、部件的性能、规格和数量的调整",{"key":31,"text":357,"correct":22},"发包人要求增减合同中约定的备品备件、专用工具、竣工后试验物资的采购数量",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":24,"analysis":33},981676,"关于索赔条款，下列说法错误的是()。",[362,364,366,368],{"key":20,"text":363,"correct":22},"合同中的索赔条款一般包括索赔情形、索赔期限及索赔方式",{"key":24,"text":365,"correct":29},"承包人未能在知道或应当知道索赔事件发生30天内向对方提出索赔意向通知书的，则丧失要求追加付款和延长工期的权利",{"key":27,"text":367,"correct":22},"为避免争议，《2013版施工合同》明确规定“逾期索赔失权制度”对发包人和承包人均适用",{"key":31,"text":369,"correct":22},"承包人提交的最终结清文件中，只限于提出工程竣工接收证书颁发后发生的任何索赔",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},981677,"关于默示规则，即监理人未在收到承包人提交的工程量报表后的()天内完成审核的，视为认可承包人报送的工程量。",[374,376,378,380],{"key":20,"text":375,"correct":29},"7",{"key":24,"text":377,"correct":22},"6",{"key":27,"text":379,"correct":22},"5",{"key":31,"text":381,"correct":22},"3",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":31,"analysis":33},981678,"AIA系列合同条件的核心是()。",[386,388,390,392],{"key":20,"text":387,"correct":22},"A191",{"key":24,"text":389,"correct":22},"A491",{"key":27,"text":391,"correct":22},"B901",{"key":31,"text":53,"correct":29},{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":27,"analysis":33},981679,"设计合同工作内容，不包括下列()阶段。",[397,399,401,403],{"key":20,"text":398,"correct":22},"方案设计",{"key":24,"text":400,"correct":22},"初步设计",{"key":27,"text":402,"correct":29},"详细设计",{"key":31,"text":404,"correct":22},"施工图设计",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":20,"analysis":33},981680,"发包人在与承包人签订建设工程施工合同前应确保完成的事项不包括()。",[409,411,413,415],{"key":20,"text":410,"correct":29},"工程项目的全部设计已经批准",{"key":24,"text":412,"correct":22},"工程项目已经列入年度建设计划",{"key":27,"text":414,"correct":22},"标发包工程，已经完成招投标程序且已经确定中标人",{"key":31,"text":416,"correct":22},"建设资金和主要建筑材料设备来源已经落实",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":24,"analysis":33},981681,"()是有偿合同的核心条款。",[421,423,425,427],{"key":20,"text":422,"correct":22},"范围条款",{"key":24,"text":424,"correct":29},"价格条款",{"key":27,"text":426,"correct":22},"期限条款",{"key":31,"text":428,"correct":22},"计量与支付条款",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":27,"analysis":33},981682,"与《2007版标准文件》不同，《2013版施工合同》通用条款中增加了发包人的索赔期限为_____，发包人未在索赔事件发生后______内通过监理人向承包人提出索赔意向通知书的，丧失要求赔付金额和（或）延长缺陷责任期的权利。()",[433,435,437,439],{"key":20,"text":434,"correct":22},"28天；30天",{"key":24,"text":436,"correct":22},"30天；30天",{"key":27,"text":438,"correct":29},"28天；28天",{"key":31,"text":440,"correct":22},"25天；25天",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":27,"analysis":33},981683,"关于最终结清条款，下列说法错误的是()。",[445,447,449,451],{"key":20,"text":446,"correct":22},"最终结清条款包括最终结清申请单、最终结清证书和支付时间",{"key":24,"text":448,"correct":22},"缺陷责任期终止证书签发后，承包人可按专用合同条款约定的份数和期限向监理人提交最终结清申请单，并提供相关证明材料",{"key":27,"text":450,"correct":29},"承包人对发包人签认的最终结清证书有异议的，不按争议条款的约定执行",{"key":31,"text":452,"correct":22},"发包人对最终结清申请单内容有异议的，有权要求承包人进行修正和提供补充资料，由承包人向监理人提交修正后的最终结清申请单",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":27,"analysis":33},981684,"下列情形中，不具备招标条件的是()。",[457,459,461,463],{"key":20,"text":458,"correct":22},"发包人在进行工程发包时，先不对外公开进行招标，而是先邀请部分施工企业组织进行内部招标",{"key":24,"text":460,"correct":22},"发包人不委托招标代理机构组织招标而自己组织招标",{"key":27,"text":462,"correct":29},"招标项目的相应资金或者资金来源已经落实，未在招标文件中如实载明",{"key":31,"text":464,"correct":22},"依法必须招标的项目，发包人先确定一家施工单位，且在该施工单位已进场施工之后，发包人再组织补办招标程序",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":20,"analysis":33},981685,"关于工程设计文件审查，下列说法不正确的是()。",[469,471,473,475],{"key":20,"text":470,"correct":29},"除专用合同条款对期限另有约定外，自发包人收到设计人的工程设计文件以及设计人的通知之日起，发包人对设计人的工程设计文件审查期不超过20天",{"key":24,"text":472,"correct":22},"发包人不同意工程设计文件的，应以书面形式通知设计人，并说明不符合合同要求的具体内容",{"key":27,"text":474,"correct":22},"设计人的工程设计文件不需要政府有关部门审查或批准的，设计人应当严格按照经发包人审查同意的工程设计文件进行修改，如果发包人的修改意见超出或更改了发包人要求，发包人应当根据合同【工程设计变更与索赔】条款的约定，向设计人另行支付费用",{"key":31,"text":476,"correct":22},"工程设计文件的审查，不减轻或免除设计人依据法律应当承担的责任",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":31,"analysis":33},981686,"建设工程勘察设计合同及其管理的法律基础()。",[481,483,485,487],{"key":20,"text":482,"correct":22},"仅包括国家层面的法律，如《合同法》",{"key":24,"text":484,"correct":22},"包括国家（不包括地方）颁发的法律、法规，如《合同法》、《建设工程质量管理条例》",{"key":27,"text":486,"correct":22},"不包括各地建设行政主管部门制定的当地相关的条例、规定和办法等",{"key":31,"text":488,"correct":29},"主要是国家或地方颁发的法律、法规",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":20,"analysis":33},981687,"下列关于工程总承包合同主体与客体的法律地位的说法中，错误的是()。",[493,495,497,499],{"key":20,"text":494,"correct":29},"工程总承包合同的承包人是指具有工程发包主体资格和支付工程价款能力的当事人以及取得该当事人资格的合法继承人",{"key":24,"text":496,"correct":22},"作为建设工程的发包人应具有合法性，才能成为法律意义上的发包人",{"key":27,"text":498,"correct":22},"承揽工程总承包业务的企业必须依法设立，并持有国家认可的相应资质证书",{"key":31,"text":500,"correct":22},"工程总承包合同法律关系的客体是指发包人委托工程总承包的建设项目，工程总承包可以是建设项目的设计、采购、施工（含竣工试验）、试运行等全过程或若干阶段的工程承包",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":27,"analysis":33},981688,"DB模式是合同当事人以契约或者合同形式，承担建设项目的()活动的工程承包模式。",[505,507,509,511],{"key":20,"text":506,"correct":22},"设计",{"key":24,"text":508,"correct":22},"施工",{"key":27,"text":510,"correct":29},"设计和施工",{"key":31,"text":512,"correct":22},"设计、采购和施工",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":24,"analysis":33},981689,"关于建设工程施工合同的订立和履行，下列说法错误的是()。",[517,519,521,523],{"key":20,"text":518,"correct":22},"对于依法必须进行招标的项目，招标人必须通过招标方式进行发包，否则将导致合同无效",{"key":24,"text":520,"correct":29},"建设工程施工合同的承包人未取得建筑施工企业资质或超越资质等级从事建筑活动的，已经订立的建设工程施工合同效力待定",{"key":27,"text":522,"correct":22},"违反招标投标相关规定的责任并不限于民事责任，还包括行政责任和刑事责任",{"key":31,"text":524,"correct":22},"建设工程施工合同的履行受到行政规范诸如《城乡规划法》、《土地管理法》、《安全生产法》等的约束",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":27,"analysis":33},981690,"关于合同价格与支付，下列说法错误的是()。",[529,531,533,535],{"key":20,"text":530,"correct":22},"除专用合同条款另有约定外，合同价格包括签约合同价以及按照合同约定进行的调整",{"key":24,"text":532,"correct":22},"工程进度付款条款包括付款时间、支付分解表、进度付款申请单、进度付款证书和支付时间、工程进度付款的修正等方面",{"key":27,"text":534,"correct":29},"工程进度付款用于承包人为合同工程的设计和工程实施购置材料、工程设备、施工设备、修建临时设施以及组织施工队伍进场等",{"key":31,"text":536,"correct":22},"监理人应从发包人的每笔进度付款中，按专用合同条款的约定扣留质量保证金，直至扣留的质量保证金总额达到专用合同条款约定的金额或比例为止",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":20,"analysis":33},981691,"关于发包人提供资料和设计人提交设计文件，下列说法错误的是()。",[541,543,545,547],{"key":20,"text":542,"correct":29},"发包人提交文件和资料超过约定期限20天以外时，设计人有权重新确定提交工程设计文件的时间",{"key":24,"text":544,"correct":22},"建设工程设计文件是设备材料采购、非标准设备制作和工程施工的主要依据",{"key":27,"text":546,"correct":22},"发包人提供必需的工程设计资料是设计人开展设计工作的依据之一",{"key":31,"text":548,"correct":22},"在建设项目确立以后，工程设计就成为工程建设最关键的环节",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":20,"analysis":33},981692,"关于工程设计变更与索赔，下列说法错误的是()。",[553,555,557,559],{"key":20,"text":554,"correct":29},"基准日期后，与工程设计服务有关的法律、技术标准的强制性规定的颁布及修改，由此增加的设计费用由发包人和设计人共同承担",{"key":24,"text":556,"correct":22},"如果发生设计人认为有理由提出增加合同价款或延长设计周期的要求事项，除专用合同条款对期限另有约定外，设计人应于该事项发生后5天内书面通知发包人",{"key":27,"text":558,"correct":22},"如果发生设计人认为有理由提出增加合同价款或延长设计周期的要求事项，除专用合同条款对期限另有约定外，在该事项发生后10天内，设计人应向发包人提供证明设计人要求的书面声明",{"key":31,"text":560,"correct":22},"如果发生设计人认为有理由提出增加合同价款或延长设计周期的要求事项，除专用合同条款对期限另有约定外，发包人应在接到设计人书面声明后的5天内，予以书面答复",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":24,"analysis":33},981693,"在履行合同过程中，()可按照合同约定的变更程序向承包人作出有关发包人要求改变的变更指示。",[565,567,569,571],{"key":20,"text":566,"correct":22},"发包人",{"key":24,"text":568,"correct":29},"监理人",{"key":27,"text":570,"correct":22},"项目经理",{"key":31,"text":572,"correct":22},"总承包商",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":24,"analysis":33},981694,"勘察合同生效后，应按规定到（）备案。",[577,579,581,583],{"key":20,"text":578,"correct":22},"项目所在地工商行政管理部门",{"key":24,"text":580,"correct":29},"省级建设行政主管部门规定的审查部门",{"key":27,"text":582,"correct":22},"项目审批部门",{"key":31,"text":584,"correct":22},"城市规划行政部门",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":27,"analysis":33},981695,"下列关于勘察设计过程合同管理的说法错误的是()。",[589,591,593,595],{"key":20,"text":590,"correct":22},"工程设计进度计划是控制工程设计进度的依据，发包人有权按照工程设计进度计划中列明的关键性控制节点检查工程设计进度情况",{"key":24,"text":592,"correct":22},"发包人应在收到设计人修订的工程设计进度计划后及时完成审核和批准或提出修改意见，否则视为发包人同意设计人提交的修订的工程设计进度计划",{"key":27,"text":594,"correct":29},"因设计人原因引起的暂停设计，设计人应当尽快向发包人发出书面通知并按合同约定承担责任，且设计人在收到发包人复工指示后10天内仍未复工的，视为设计人无法继续履行合同的情形，设计人应按合同约定解除合同并承担责任",{"key":31,"text":596,"correct":22},"在合同履行过程中，勘察人（设计人）经发包人同意可以将自己承包的部分工作分包给具有相应资质条件的第三人，第三人就其完成的工作成果与勘察人（设计人）向发包人承担连带责任。",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":20,"analysis":33},981696,"关于变更程序，下列说法错误的是()。",[601,603,605,607],{"key":20,"text":602,"correct":29},"变更程序按照提出变更、变更指示、变更估价执行",{"key":24,"text":604,"correct":22},"发包人同意承包人根据变更意向书要求提交变更实施方案的，由监理人按合同约定发出变更指示",{"key":27,"text":606,"correct":22},"监理人应按照合同约定和合同当事人商定或确定变更价格",{"key":31,"text":608,"correct":22},"变更指示只能由监理人发出",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":20,"analysis":33},981697,"关于变更管理，下列说法不正确的是()。",[613,615,617,619],{"key":20,"text":614,"correct":29},"承包人提出变更的，应通过监理人向发包人发出变更指示，该变更指示应指明变更事项的工程范围和变更的内容",{"key":24,"text":616,"correct":22},"监理人提出变更建议的，因尚需获得发包人的批准，该变更建议需要提交书面形式",{"key":27,"text":618,"correct":22},"监理人的变更建议是具体和可操作的，应当具体到图纸、标准、范围、数量、价格等方面，尤其应该测算对合同工期变化的影响",{"key":31,"text":620,"correct":22},"发包人收到承包人不能执行变更指令的理由后，应当审慎考虑，如承包人的理由能够成立的，发包人应通过监理人通知承包人停止执行该变更指令",[622,625,628,631,634,637],{"id":15,"name":623,"category":7,"favorite":624},"领导干部任职前廉政法规知识测试题",92,{"id":626,"name":627,"category":7,"favorite":15},595,"建筑结构与设备",{"id":629,"name":630,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":632,"name":633,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":635,"name":636,"category":7,"favorite":8},534,"BIM工程师",{"id":638,"name":636,"category":7,"favorite":8},535]