[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-710-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":614},{"id":5,"name":6,"category":7,"favorite":8},710,"招标采购合同管理-(原案例分析)","建筑工程",0,2,50,768,[13,34,46,58,70,82,94,106,118,130,141,153,165,177,189,201,213,225,237,248,260,272,284,296,308,320,332,344,356,367,377,389,401,413,425,437,449,461,473,485,497,509,520,532,544,556,568,580,590,602],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},981597,1,"单选题","招标采购合同规划内容的关键是()。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","目标分析",false,{"key":24,"text":25,"correct":22},"B","合同数量及种类规划",{"key":27,"text":28,"correct":22},"C","合同体系确立",{"key":30,"text":31,"correct":32},"D","合同要素规划",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},981598,"下列关于项目管理方案与招标采购合同规划的表述不正确的是()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"项目管理方案应建立在对项目进行工作分解的基础上",{"key":24,"text":41,"correct":22},"招标采购合同规划应建立在对项目进行工作分解的基础上",{"key":27,"text":43,"correct":32},"招标采购合同规划是项目管理方案内容的基础条件",{"key":30,"text":45,"correct":22},"招标采购合同规划直接影响项目管理方案目标的实现",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},981599,"以工程建设合同为例，下列不属于与合同相关的风险的是()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"技术风险",{"key":24,"text":53,"correct":32},"经营风险",{"key":27,"text":55,"correct":22},"自然环境风险",{"key":30,"text":57,"correct":22},"承包人资信风险",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},981600,"()是招标师进行招标采购合同规划的首要步骤，也是开展其后各项工作的中心点。",[62,64,66,68],{"key":20,"text":63,"correct":32},"总体目标的确定",{"key":24,"text":65,"correct":22},"基本信息的采集",{"key":27,"text":67,"correct":22},"项目总体需求分析",{"key":30,"text":69,"correct":22},"合同总体需求分析",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},981601,"招标采购合同跟踪的主要内容不包括()。",[74,76,78,80],{"key":20,"text":75,"correct":22},"项目计划和目标的实现情况",{"key":24,"text":77,"correct":32},"项目的信息和报表",{"key":27,"text":79,"correct":22},"项目的外部因素",{"key":30,"text":81,"correct":22},"项目的内部因素",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":27,"analysis":33},981602,"下列不属于合同目标管理的内容的是()。",[86,88,90,92],{"key":20,"text":87,"correct":22},"投资总额控制管理",{"key":24,"text":89,"correct":22},"质量安全目标管理",{"key":27,"text":91,"correct":32},"价值管理",{"key":30,"text":93,"correct":22},"时间管理",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},981603,"里程碑计划以()为基础和前提。",[98,100,102,104],{"key":20,"text":99,"correct":22},"初步合同规划",{"key":24,"text":101,"correct":32},"合同分解",{"key":27,"text":103,"correct":22},"确定最小合同单元",{"key":30,"text":105,"correct":22},"确定招标合同单元",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},981604,"合理划分项目()是招标采购合同规划的关键所在。",[110,112,114,116],{"key":20,"text":111,"correct":32},"招标合同单元",{"key":24,"text":113,"correct":22},"最小合同单元",{"key":27,"text":115,"correct":22},"最小工作单元",{"key":30,"text":117,"correct":22},"最小工作单元和最小合同单元",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":30,"analysis":33},981605,"招标采购合同履行与控制的主要内容不包括()。",[122,124,126,128],{"key":20,"text":123,"correct":22},"合同目标管理与激励",{"key":24,"text":125,"correct":22},"合同交底管理",{"key":27,"text":127,"correct":22},"合同重点要素管理",{"key":30,"text":129,"correct":32},"合同风险梳理",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},981606,"合同目标管理中的()是在保证实现项目目的的前提下对项目投资总额进行控制。",[134,135,137,139],{"key":20,"text":89,"correct":22},{"key":24,"text":136,"correct":22},"合同重点要素目标管理",{"key":27,"text":138,"correct":32},"投资总额目标管理",{"key":30,"text":140,"correct":22},"时间目标管理",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":27,"analysis":33},981607,"关于采购合同规划中的合同结构分解的方法，下列说法错误的是()。",[145,147,149,151],{"key":20,"text":146,"correct":22},"按照工程项目的实施过程进行分解的方法是项目进度分解法",{"key":24,"text":148,"correct":22},"进行合同结构分解时，可以交叉使用项目进度分解法和项目主体分解法",{"key":27,"text":150,"correct":32},"在建立项目合同结构体系时，一般将项目进度分解法作为主要方法，项目主体分解法作为辅助方法",{"key":30,"text":152,"correct":22},"按照工程建设项目或政府采购活动的不同履行主体进行分解的方法是项目主体分解法",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":27,"analysis":33},981609,"下列不属于一般的合同要素的是()。",[157,159,161,163],{"key":20,"text":158,"correct":22},"违约责任",{"key":24,"text":160,"correct":22},"争议解决方法",{"key":27,"text":162,"correct":32},"施工合同中的索赔",{"key":30,"text":164,"correct":22},"标的",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":20,"analysis":33},981610,"在合同重点要素中，()不涉及价款管理。",[169,171,173,175],{"key":20,"text":170,"correct":32},"合同借贷条款",{"key":24,"text":172,"correct":22},"合同支付条款",{"key":27,"text":174,"correct":22},"合同变更条款",{"key":30,"text":176,"correct":22},"合同结算条款",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":20,"analysis":33},981611,"关于树状图和责任分配矩阵的优缺点，下列表述正确的是()。",[181,183,185,187],{"key":20,"text":182,"correct":32},"树状图便于招标人全面了解招标采购合同的种类、数量以及相互关系",{"key":24,"text":184,"correct":22},"责任分配矩阵有助于体现工程建设项目或政府采购活动所涉及合同的相互逻辑关系",{"key":27,"text":186,"correct":22},"责任分配矩阵无法反映合同签订的先后顺序以及合同管理的责任主体，不利于招标人对招标采购合同进行进度管理和绩效管理",{"key":30,"text":188,"correct":22},"树状图无法直观地体现各个合同之间的逻辑体系",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":20,"analysis":33},981612,"常用的总体合同结构分解的表达方式是()。",[193,195,197,199],{"key":20,"text":194,"correct":32},"层次结构图",{"key":24,"text":196,"correct":22},"树状图",{"key":27,"text":198,"correct":22},"矩阵图",{"key":30,"text":200,"correct":22},"条形图",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":24,"analysis":33},981613,"从规划的流程看，下列不属于招标采购合同规划的内容的是()。",[205,207,209,211],{"key":20,"text":206,"correct":22},"项目前期调研",{"key":24,"text":208,"correct":32},"合同解除",{"key":27,"text":210,"correct":22},"合同体系设计",{"key":30,"text":212,"correct":22},"合同签订",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":24,"analysis":33},981614,"工作分解结构可以从多种角度进行，其中不包括()。",[217,219,221,223],{"key":20,"text":218,"correct":22},"按产品的物理结构分解",{"key":24,"text":220,"correct":32},"按最小合同单元分解",{"key":27,"text":222,"correct":22},"按照项目的实施过程分解",{"key":30,"text":224,"correct":22},"按照项目的地域分布分解",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":20,"analysis":33},981615,"下列属于交易目的分析的是()。",[229,231,233,235],{"key":20,"text":230,"correct":32},"知识产权要求分析",{"key":24,"text":232,"correct":22},"项目目标分析",{"key":27,"text":234,"correct":22},"投资收益测算分析",{"key":30,"text":236,"correct":22},"质量标准要求分析",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":27,"analysis":33},981616,"下列不属于合同总体需求分析的工作要点的是()。",[241,242,244,246],{"key":20,"text":63,"correct":22},{"key":24,"text":243,"correct":22},"相关市场信息的调研",{"key":27,"text":245,"correct":32},"资金投放的决策",{"key":30,"text":247,"correct":22},"相关法律政策的调研",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":27,"analysis":33},981617,"()是合同信息管理各环节中关键的第一步，是后续各环节得以开展的基础。",[252,254,256,258],{"key":20,"text":253,"correct":22},"编制合同信息管理计划",{"key":24,"text":255,"correct":22},"建立合同信息管理系统",{"key":27,"text":257,"correct":32},"合同信息收集",{"key":30,"text":259,"correct":22},"合同信息传递",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":20,"analysis":33},981618,"完成合同要素的计划与配置后，形成的成果文件可以称为()。",[264,266,268,270],{"key":20,"text":265,"correct":32},"合同要素计划分配书",{"key":24,"text":267,"correct":22},"合同要素计划书",{"key":27,"text":269,"correct":22},"合同要素提纲",{"key":30,"text":271,"correct":22},"合同订立顺序与条件建议书",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":30,"analysis":33},981619,"招标采购合同规划是针对整个项目进行的，一般都需要经过项目功能定位、资金安排、专业技术和招标规范等方面的论证和初步规划，再依次经过()，完成合同结构体系安排，从而推进项目实施。",[276,278,280,282],{"key":20,"text":277,"correct":22},"确定招标合同单元、确定最小工作单元、确定最小合同单元",{"key":24,"text":279,"correct":22},"确定招标合同单元、确定最小合同单元、确定最小工作单元",{"key":27,"text":281,"correct":22},"确定最小工作单元、确定招标合同单元、确定最小合同单元",{"key":30,"text":283,"correct":32},"确定最小工作单元、确定最小合同单元、确定招标合同单元",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":30,"analysis":33},981620,"下列各项不属于合同目标管理的具体做法的是()。",[288,290,292,294],{"key":20,"text":289,"correct":22},"合同目标的设置",{"key":24,"text":291,"correct":22},"安排合理和全面的权利义务",{"key":27,"text":293,"correct":22},"权利义务的实现过程",{"key":30,"text":295,"correct":32},"合同目标的改进",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":24,"analysis":33},981621,"关于设计施工一体化，下列说法不正确的是()。",[300,302,304,306],{"key":20,"text":301,"correct":22},"如果工程出现质量缺陷，承包人将承担全部责任",{"key":24,"text":303,"correct":32},"如果工程出现质量缺陷，承包人只承担部分责任",{"key":27,"text":305,"correct":22},"有利于缩短建设周期",{"key":30,"text":307,"correct":22},"有利于降低工程造价",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":20,"analysis":33},981622,"下列关于承包人的合理化建议的说法中，错误的是()。",[312,314,316,318],{"key":20,"text":313,"correct":32},"在履行合同过程中，承包人对发包人要求的合理化建议，不一定均以书面形式提交监理人",{"key":24,"text":315,"correct":22},"合理化建议书的内容应包括建议工作的详细说明、进度计划和效益以及与其他工作的协调等",{"key":27,"text":317,"correct":22},"监理人应与发包人协商是否采纳建议",{"key":30,"text":319,"correct":22},"建议被采纳并构成变更的，应按照变更程序约定向承包人发出变更指示",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":30,"analysis":33},981623,"FIDIC的三个合同条件均适用()合同类型。",[324,326,328,330],{"key":20,"text":325,"correct":22},"交钥匙",{"key":24,"text":327,"correct":22},"设计一施工",{"key":27,"text":329,"correct":22},"设计一采购一施工交钥匙",{"key":30,"text":331,"correct":32},"总价",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":30,"analysis":33},981624,"国际上比较有影响力的施工合同范本不包括()。",[336,338,340,342],{"key":20,"text":337,"correct":22},"FIDIC标准合同范本",{"key":24,"text":339,"correct":22},"ICE范本",{"key":27,"text":341,"correct":22},"NEC合同条件",{"key":30,"text":343,"correct":32},"2013版施工合同",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":27,"analysis":33},981625,"专业分包人认为有权得到追加付款和（或）延长工期的，应在知道或应当知道索赔事件发生后()天内，向总承包人递交索赔意向通知书，并说明发生索赔事件的事由。",[348,350,352,354],{"key":20,"text":349,"correct":22},"5",{"key":24,"text":351,"correct":22},"7",{"key":27,"text":353,"correct":32},"14",{"key":30,"text":355,"correct":22},"28",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":24,"analysis":33},981626,"专业分包人按照计量程序约定的时间向总承包人提交进度付款申请单后，总承包人应在收到专业分包人进度付款申请单后()天内完成审核。",[360,362,364,366],{"key":20,"text":361,"correct":22},"20",{"key":24,"text":363,"correct":32},"21",{"key":27,"text":365,"correct":22},"25",{"key":30,"text":355,"correct":22},{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":24,"analysis":33},981627,"除在专用合同条款另有约定外，总承包人应在签发进度款支付证书或临时进度款支付证书后()天内完成支付。",[371,372,373,375],{"key":20,"text":349,"correct":22},{"key":24,"text":351,"correct":32},{"key":27,"text":374,"correct":22},"10",{"key":30,"text":376,"correct":22},"15",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":30,"analysis":33},981628,"工程总承包合同中的索赔不包括()。",[381,383,385,387],{"key":20,"text":382,"correct":22},"承包人索赔的提出",{"key":24,"text":384,"correct":22},"承包人索赔处理程序",{"key":27,"text":386,"correct":22},"承包人提出索赔的期限",{"key":30,"text":388,"correct":32},"承包人提出索赔的数额",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":24,"analysis":33},981629,"关于建设工程施工合同及其种类，下列说法错误的是()。",[393,395,397,399],{"key":20,"text":394,"correct":22},"根据承包内容的不同，建设工程施工合同可以分为施工总承包合同、施工专业分包合同以及施工劳务分包合同",{"key":24,"text":396,"correct":32},"按照合同价格形式的不同，建设工程施工合同可以分为单价合同和总价合同",{"key":27,"text":398,"correct":22},"建设工程施工总承包人应具备相应的资质，建设工程施工总承包企业资质包括房屋建筑、公路工程、铁路工程等12个类别",{"key":30,"text":400,"correct":22},"建设工程施工劳务承包企业资质不再进行类别和等级划分，统一为劳务企业资质",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":27,"analysis":33},981630,"关于工程勘察与设计，下列说法错误的是()。",[405,407,409,411],{"key":20,"text":406,"correct":22},"勘察设计工作是工程建设实施阶段的首要和主导性环节",{"key":24,"text":408,"correct":22},"建设工程勘察按照工程勘察的阶段可以分为可研勘察、初步设计勘察和详细勘察",{"key":27,"text":410,"correct":32},"专业建设工程设计一般分为方案设计、初步设计和施工图设计三个阶段",{"key":30,"text":412,"correct":22},"房屋建筑工程设计服务包括工程设计基本服务、工程设计其他服务",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":30,"analysis":33},981631,"关于引起工程索赔的原因，下列说法不正确的是()。",[417,419,421,423],{"key":20,"text":418,"correct":22},"工程合同方面",{"key":24,"text":420,"correct":22},"意外风险",{"key":27,"text":422,"correct":22},"当事人不依法履行施工合同导致的违约",{"key":30,"text":424,"correct":32},"可预见性因素",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":24,"analysis":33},981632,"关于《2007版标准文件》，下列说法不正确的是()。",[429,431,433,435],{"key":20,"text":430,"correct":22},"标准文本的适用范围扩大到了依法必须招标的项目",{"key":24,"text":432,"correct":32},"《2007版标准文件》适用于一定规模以上，且设计和施工由同一承包人承担的工程施工招标文件",{"key":27,"text":434,"correct":22},"招标人可以根据招标项目的具体特点和实际需要，对《2007版标准文件》中的“通用合同条款”进行补充、细化和修改",{"key":30,"text":436,"correct":22},"行业标准施工招标文件中的“专用合同条款”对《2007版标准文件》中“通用合同条款”进行补充和细化的内容不得与“通用合同条款”强制性规定相抵触，否则抵触内容无效",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":20,"analysis":33},981633,"()适用于房屋建筑工程、土木工程、线路管道和设备安装工程、装修工程等建设工程的施工承发包活动。",[441,443,445,447],{"key":20,"text":442,"correct":32},"《2013版施工合同》",{"key":24,"text":444,"correct":22},"简明标准施工招标文件（2012年版）",{"key":27,"text":446,"correct":22},"《2007版标准文件》",{"key":30,"text":448,"correct":22},"《建设工程清单计价规范》",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":27,"analysis":33},981634,"下列关于建设工程施工合同的说法中，错误的是()。",[453,455,457,459],{"key":20,"text":454,"correct":22},"建设工程施工合同是工程建设投资控制、质量控制、进度控制的主要依据",{"key":24,"text":456,"correct":22},"建设工程施工合同应当采用书面形式",{"key":27,"text":458,"correct":32},"招标人必须是法人",{"key":30,"text":460,"correct":22},"作为建设工程施工合同的承包人应具备相应的资质等级，并在其资质等级许可的范围内从事建筑活动",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":27,"analysis":33},981635,"下列不属于索赔报告的基本要求的是()。",[465,467,469,471],{"key":20,"text":466,"correct":22},"必须说明索赔事件应当符合法律规定和合同约定，并列出证明资料",{"key":24,"text":468,"correct":22},"必须说明工期延误以及损失金额的具体明细以及依据",{"key":27,"text":470,"correct":32},"必须说明违约方的责任",{"key":30,"text":472,"correct":22},"说明事件与损失之间的因果关系、关联性，并附明依据资料",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":24,"analysis":33},981636,"《2013版施工合同》明确规定了逾期支付工程款，按照中国人民银行发布的同期同类贷款基准利率的()倍支付违约金。",[477,479,481,483],{"key":20,"text":478,"correct":22},"1",{"key":24,"text":480,"correct":32},"2",{"key":27,"text":482,"correct":22},"3",{"key":30,"text":484,"correct":22},"4",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":30,"analysis":33},981637,"()不属于安全文明施工与环境保护条款。",[489,491,493,495],{"key":20,"text":490,"correct":22},"安全施工",{"key":24,"text":492,"correct":22},"文明施工",{"key":27,"text":494,"correct":22},"环境保护",{"key":30,"text":496,"correct":32},"效率施工",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":24,"analysis":33},981638,"下列情形中，不属于承包人违约的是()。",[501,503,505,507],{"key":20,"text":502,"correct":22},"承包人的设计、承包人文件、实施和竣工的工程不符合法律以及合同约定",{"key":24,"text":504,"correct":32},"监理人无正当理由没有在约定期限内发出复工指示，导致承包人无法复工",{"key":27,"text":506,"correct":22},"承包人无法继续履行或明确表示不履行或实质上已停止履行合同",{"key":30,"text":508,"correct":22},"由于承包人原因未能通过竣工试验或竣工后试验的",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":24,"analysis":33},981639,"在国际常用的标准合同文件中，JCT和AIA合同条件主要应用于()。",[513,515,516,518],{"key":20,"text":514,"correct":22},"土木工程",{"key":24,"text":7,"correct":32},{"key":27,"text":517,"correct":22},"能源工程",{"key":30,"text":519,"correct":22},"道路建设",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":30,"analysis":33},981640,"关于价格调整条款，下列说法错误的是()。",[524,526,528,530],{"key":20,"text":525,"correct":22},"除合同另有约定的价格调整外，《2007版标准文件》和《2013版施工合同》均规定了市场价格波动和法律变化引起调整的两种情形",{"key":24,"text":527,"correct":22},"关于市场价格波动引起的调整，《2007版标准文件》和《2013版施工合同》均采用了可调条款的形式",{"key":27,"text":529,"correct":22},"《2013版施工合同》对照《建设工程工程量清单计价规范》(GB50500—2013)予以规定，即考虑采用价格指数法、造价信息调整法和其他约定的方式进行调整",{"key":30,"text":531,"correct":32},"对于法律变化引起的调整，价格调整条款采用可调条款的形式，即原则上允许合同当事人在专用合同条款另行约定，且方式相对简单",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":20,"analysis":33},981641,"工程总承包是从事工程总承包的企业受()委托的承包。",[536,538,540,542],{"key":20,"text":537,"correct":32},"发包人",{"key":24,"text":539,"correct":22},"委托人",{"key":27,"text":541,"correct":22},"客户",{"key":30,"text":543,"correct":22},"承包人",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":24,"analysis":33},981642,"关于勘察设计合同主体与客体，下列说法不正确的是()。",[548,550,552,554],{"key":20,"text":549,"correct":22},"勘察设计合同法律关系的客体是指发包人委托勘察设计的建设工程项目",{"key":24,"text":551,"correct":32},"勘察设计合同的勘察人（设计人）应当是法人或者自然人",{"key":27,"text":553,"correct":22},"勘察人（设计人）寻求和承接勘察设计业务时，要审查其勘察设计资质等级与所承接工程所要求的等级是否相符",{"key":30,"text":555,"correct":22},"合同管理第一步是确认合同法律关系主体与客体是否合法",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":30,"analysis":33},981643,"下列关于总承包合同的分包管理的说法中，错误的是()。",[560,562,564,566],{"key":20,"text":561,"correct":22},"承包人可以按照法律规定和专用条款约定，将总承包范围的有关工作事项（含设计、采购、施工、劳务服务、竣工试验等）进行分包",{"key":24,"text":563,"correct":22},"分包人应符合国家法律规定的企业资质等级，否则不能作为分包人，承包人有义务对分包人的资质进行审查，分包人的资格能力应与其分包工作的标准和规模相适应",{"key":27,"text":565,"correct":22},"禁止总承包单位将工程分包给不具备相应资质条件的单位，禁止分包单位将其承包的工程再分包",{"key":30,"text":567,"correct":32},"承包人对分包人的行为向发包人负责，承包人和发包人就分包工作向分包人承担连带责任",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":24,"analysis":33},981644,"关于基准日的确定，下列说法错误的是()。",[572,574,576,578],{"key":20,"text":573,"correct":22},"对于招标发包的工程，通常规定基准日期为投标截止日期前第28天",{"key":24,"text":575,"correct":32},"对于招标发包的工程，通常规定基准日期为合同签订前第28天",{"key":27,"text":577,"correct":22},"直接发包的工程.基准日期为合同签订前第28天",{"key":30,"text":579,"correct":22},"基准日的确定综合考虑了招标投标的具体活动或订约前谈判协商的时间",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":30,"analysis":33},981645,"目前国内通行的建设工程施工合同文本不包括()。",[584,586,588,589],{"key":20,"text":585,"correct":22},"《2007版标准文件》所附的合同条款",{"key":24,"text":587,"correct":22},"简明标准施工招标文件（2012年版）合同条款",{"key":27,"text":442,"correct":22},{"key":30,"text":337,"correct":32},{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":27,"analysis":33},981646,"关于建设工程施工合同质量管理，下列说法不正确的是()。",[594,596,598,600],{"key":20,"text":595,"correct":22},"通常情况下，发包人作为投资人，一般不具备管理工程质量的能力",{"key":24,"text":597,"correct":22},"发包人应高度重视竣工验收，验收不合格的，应要求承包人整改，待整改后重新进行验收，并确保竣工验收合格后方可交付使用",{"key":27,"text":599,"correct":32},"工程质量验收包括进场材料设备的验收、过程验收和竣工验收，其中过程验收是工程合同履行的重要节点",{"key":30,"text":601,"correct":22},"发包人在缺陷责任期和保修期内发现工程质量缺陷和问题的，应及时书面通知承包人，要求承包人予以维修，并对引起的维修费用进行清算",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":20,"analysis":33},981647,"承接勘察任务或签订勘察合同时，工程应当具备()。",[606,608,610,612],{"key":20,"text":607,"correct":32},"立项批准文件",{"key":24,"text":609,"correct":22},"勘察任务书",{"key":27,"text":611,"correct":22},"勘察许可批件",{"key":30,"text":613,"correct":22},"建筑总平面布置图",[615,618,621,624,627,630],{"id":15,"name":616,"category":7,"favorite":617},"领导干部任职前廉政法规知识测试题",92,{"id":619,"name":620,"category":7,"favorite":15},595,"建筑结构与设备",{"id":622,"name":623,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":625,"name":626,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":628,"name":629,"category":7,"favorite":8},534,"BIM工程师",{"id":631,"name":629,"category":7,"favorite":8},535]