[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-710-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":737},{"id":5,"name":6,"category":7,"favorite":8},710,"招标采购合同管理-(原案例分析)","建筑工程",0,11,50,768,[13,38,53,68,82,96,111,126,141,156,170,185,200,214,229,243,258,273,288,303,317,331,345,359,373,387,401,416,430,444,458,472,486,500,514,529,543,557,571,586,600,614,626,640,653,667,681,695,709,723],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},982048,2,"多选题","计量是确定施工合同价格和支付合同价款的基础和依据，规范计量活动主要从()等方面予以明确。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","明确工程量计量规则",true,{"key":24,"text":25,"correct":26},"B","工程进度",false,{"key":28,"text":29,"correct":22},"C","计量周期",{"key":31,"text":32,"correct":26},"D","工程质量",{"key":34,"text":35,"correct":22},"E","计量的具体程序和具体内容","ACE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},982049,"《建设工程勘察设计管理条例》中列出的最基本的设计依据包括()。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"项目批准文件",{"key":24,"text":45,"correct":22},"城乡规划",{"key":28,"text":47,"correct":26},"工程建设推荐性标准",{"key":31,"text":49,"correct":22},"国家规定的建设工程设计深度要求",{"key":34,"text":51,"correct":22},"建设单位设计任务书要求","ABDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},982050,"下列关于竣工验收的说法中，正确的有()。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"监理人审查后认为尚不具备竣工验收条件的，应在收到竣工验收申请报告后的28天内通知承包人，指出在颁发接收证书前承包人还需进行的工作内容",{"key":24,"text":60,"correct":22},"发包人经过验收后同意接受工程的，应在监理人收到竣工验收申请报告后的56天内，由监理人向承包人出具经发包人签认的工程接收证书",{"key":28,"text":62,"correct":22},"除专用合同条款另有约定外，经验收合格工程的实际竣工日期，以提交竣工验收申请报告的日期为准，并在工程接收证书中写明",{"key":31,"text":64,"correct":26},"监理人同意承包人提交的竣工验收申请报告的，应在收到该竣工验收申请报告后的30天内提请发包人进行工程验收",{"key":34,"text":66,"correct":26},"发包人在收到承包人竣工验收申请报告60天后未进行验收的，视为验收合格，实际竣工日期以提交竣工验收申请报告的日期为准，但发包人由于不可抗力不能进行验收的除外","ABC",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":36,"analysis":37},982051,"工程设计文件审查类型有()。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"发包人对设计文件的审查",{"key":24,"text":75,"correct":26},"勘察人对工程设计文件进行审查",{"key":28,"text":77,"correct":22},"政府有关部门对设计文件的审查",{"key":31,"text":79,"correct":26},"施工单位对工程设计文件进行审查",{"key":34,"text":81,"correct":22},"组织审查会议对工程设计文件进行审查",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":67,"analysis":37},982052,"合同中的索赔条款一般包括()。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"索赔情形",{"key":24,"text":89,"correct":22},"索赔期限",{"key":28,"text":91,"correct":22},"索赔方式",{"key":31,"text":93,"correct":26},"索赔限制",{"key":34,"text":95,"correct":26},"索赔条件",{"id":97,"libraryId":5,"type":15,"typeLabel":16,"stem":98,"options":99,"answer":110,"analysis":37},982053,"下列属于进度付款申请单的内容的有()。",[100,102,104,106,108],{"key":20,"text":101,"correct":22},"当期应支付金额总额",{"key":24,"text":103,"correct":22},"当期根据支付分解表应支付金额，以及截至当期期末累计应支付金额",{"key":28,"text":105,"correct":26},"技术服务培训费",{"key":31,"text":107,"correct":26},"材料和工程设备费",{"key":34,"text":109,"correct":22},"当期根据合同应增加和扣减的其他金额，以及截至当期期末累计增加和扣减的金额","ABE",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":125,"analysis":37},982054,"工程总承包的模式有()。",[115,117,119,121,123],{"key":20,"text":116,"correct":22},"DB",{"key":24,"text":118,"correct":26},"CTRA",{"key":28,"text":120,"correct":26},"CPS",{"key":31,"text":122,"correct":26},"DPB",{"key":34,"text":124,"correct":22},"EPC","AE",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},982055,"下列关于任命发包人代表的说法中，正确的有()。",[130,132,134,136,138],{"key":20,"text":131,"correct":26},"发包人应在通用合同条款中明确其负责工程设计的发包人代表",{"key":24,"text":133,"correct":26},"发包人代表在授权范围内的行为与发包人承担连带责任",{"key":28,"text":135,"correct":26},"发包人代表在授权范围外的行为由发包人承担法律责任",{"key":31,"text":137,"correct":22},"发包人更换发包人代表的，应在专用合同条款约定的期限内提前书面通知设计人",{"key":34,"text":139,"correct":22},"发包人代表不能按照合同约定履行义务，设计人可以要求发包人撤换发包人代表","DE",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":155,"analysis":37},982056,"根据承包内容的不同，建设工程施工合同可以分为()。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"施工总承包合同",{"key":24,"text":148,"correct":22},"施工专业分包合同",{"key":28,"text":150,"correct":26},"施工专业转包合同",{"key":31,"text":152,"correct":22},"施工劳务分包合同",{"key":34,"text":154,"correct":26},"施工劳务转包合同","ABD",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":110,"analysis":37},982057,"建设工程施工专业分包合同是建设工程合同中的重要合同类型，是双务、有偿合同。其主要特点包括()。",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"合同形式的特殊性",{"key":24,"text":163,"correct":22},"合同主体的特殊性",{"key":28,"text":165,"correct":26},"合同订立程序的特殊性",{"key":31,"text":167,"correct":26},"合同争议处理的特殊性",{"key":34,"text":169,"correct":22},"合同内容的特殊性",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":184,"analysis":37},982058,"AIA系列合同条件中，与设计一施工模式(D B)相对应的标准协议书有()。",[174,176,178,180,182],{"key":20,"text":175,"correct":26},"A201",{"key":24,"text":177,"correct":22},"A191",{"key":28,"text":179,"correct":22},"A491",{"key":31,"text":181,"correct":22},"B901",{"key":34,"text":183,"correct":26},"B409","BCD",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":199,"analysis":37},982059,"工程勘察设计合同的特征包括()。",[189,191,193,195,197],{"key":20,"text":190,"correct":22},"需符合法定质量标准",{"key":24,"text":192,"correct":22},"工程勘察与工程设计紧密联系",{"key":28,"text":194,"correct":22},"交付成果多样化",{"key":31,"text":196,"correct":26},"一次性支付报酬",{"key":34,"text":198,"correct":22},"知识产权保护","ABCE",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":52,"analysis":37},982060,"作为建设工程施工合同的主体，发包人和承包人在订立建设工程施工合同时，应注意的问题有()。",[204,206,208,210,212],{"key":20,"text":205,"correct":22},"依法采用书面形式",{"key":24,"text":207,"correct":22},"审查承包人主体资格",{"key":28,"text":209,"correct":26},"审查发包人主体资格",{"key":31,"text":211,"correct":22},"审查合同条款",{"key":34,"text":213,"correct":22},"避免签订黑白合同",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":228,"analysis":37},982061,"下列属于方案设计阶段的工作内容的有()。",[218,220,222,224,226],{"key":20,"text":219,"correct":22},"对建设项目进行总体部署和安排",{"key":24,"text":221,"correct":26},"对批准的可行性研究报告的深化",{"key":28,"text":223,"correct":22},"细化功能分区",{"key":31,"text":225,"correct":22},"细化总平面布局",{"key":34,"text":227,"correct":22},"细化各项技术经济指标","ACDE",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":228,"analysis":37},982062,"关于合同价格与支付，下列说法正确的有()。",[233,235,237,239,241],{"key":20,"text":234,"correct":22},"除专用合同条款另有约定外，合同价格包括签约合同价以及按照合同约定进行的调整",{"key":24,"text":236,"correct":26},"工程进度付款只能按月支付",{"key":28,"text":238,"correct":22},"监理人应从发包人的每笔进度付款中，按专用合同条款的约定扣留质量保证金，直至扣留的质量保证金总额达到专用合同条款约定的金额或比例为止",{"key":31,"text":240,"correct":22},"预付款用于承包人为合同工程的设计和工程实施购置材料、工程设备、施工设备、修建临时设施以及组织施工队伍进场等",{"key":34,"text":242,"correct":22},"最终结清条款包括最终结清申请单、最终结清证书和支付时间",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":257,"analysis":37},982063,"关于缺陷责任和保修条款，下列说法正确的有()。",[247,249,251,253,255],{"key":20,"text":248,"correct":22},"承包人完成工程施工、经竣工验收合格并将工程移交发包人后，承包人还必须承担工程的质量缺陷修复义务和保修义务",{"key":24,"text":250,"correct":26},"缺陷责任期是指承包人按照合同约定承担缺陷修补义务，且发包人扣留质量保证金的期限，自工程实际开工日期起计算",{"key":28,"text":252,"correct":22},"建设工程实行质量保修制度。建设工程承包单位在向建设单位提交工程竣工验收报告时，应当向建设单位出具质量保修书",{"key":31,"text":254,"correct":26},"在正常使用条件下，建设工程的最低保修期限为，屋面防水工程、有防水要求的卫生间、房间和外墙面的防渗漏，为4年",{"key":34,"text":256,"correct":26},"合同中应当约定质量保证金，质量保证金的比例一般为签约合同价的8%","AC",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":272,"analysis":37},982064,"建设工程施工合同纠纷处理的方式包括()。",[262,264,266,268,270],{"key":20,"text":263,"correct":26},"协商",{"key":24,"text":265,"correct":22},"调解",{"key":28,"text":267,"correct":22},"和解",{"key":31,"text":269,"correct":22},"仲裁",{"key":34,"text":271,"correct":22},"诉讼","BCDE",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":287,"analysis":37},982065,"下列各项中，不属于设计变更范围的有()。",[277,279,281,283,285],{"key":20,"text":278,"correct":26},"对配套工程系统的工艺调整、使用功能调整",{"key":24,"text":280,"correct":22},"发包人要求改变检查、检验、检测、试验的地点和增加的附加试验",{"key":28,"text":282,"correct":26},"其他超出合同约定的设计事项",{"key":31,"text":284,"correct":22},"新增加的施工障碍处理",{"key":34,"text":286,"correct":26},"对设备、材料、部件的性能、规格和数量的调整","BD",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":302,"analysis":37},982066,"下列有关工程设计变更与索赔的说法，正确的是()。",[292,294,296,298,300],{"key":20,"text":293,"correct":26},"基准日期后，与工程设计服务有关的技术标准的强制性规定的颁布及修改，由此增加的设计费用和（或）延长的设计周期由发包人与设计人共同承担",{"key":24,"text":295,"correct":22},"如果发生设计人认为有理由提出增加合同价款或延长设计周期的要求事项，设计人应于该事项发生后5天内书面通知发包人",{"key":28,"text":297,"correct":26},"如果发生设计人认为有理由提出增加合同价款或延长设计周期的要求事项，在该事项发生后5天内，设计人应向发包人提供证明设计人要求的书面声明",{"key":31,"text":299,"correct":22},"发包人应在接到设计人书面声明后的10天内，予以书面答复",{"key":34,"text":301,"correct":22},"逾期未答复的，视为发包人同意设计人关于增加合同价款或延长设计周期的要求。","BDE",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":272,"analysis":37},982067,"勘察设计过程中的合同管理主要包括()等方面。",[307,309,311,313,315],{"key":20,"text":308,"correct":26},"项目审批",{"key":24,"text":310,"correct":22},"合同资料文档管理",{"key":28,"text":312,"correct":22},"设计进度管理",{"key":31,"text":314,"correct":22},"合同实施的跟踪与监督",{"key":34,"text":316,"correct":22},"合同变更管理",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":52,"analysis":37},982068,"下列各项属于通用工程勘察的有()。",[321,323,325,327,329],{"key":20,"text":322,"correct":22},"岩土工程勘察",{"key":24,"text":324,"correct":22},"水文地质勘察",{"key":28,"text":326,"correct":26},"水利水电工程勘察",{"key":31,"text":328,"correct":22},"工程物探",{"key":34,"text":330,"correct":22},"室内试验",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":155,"analysis":37},982069,"()是建设工程施工合同最为核心的内容。",[335,337,339,341,343],{"key":20,"text":336,"correct":22},"工期",{"key":24,"text":338,"correct":22},"质量安全",{"key":28,"text":340,"correct":26},"索赔条款",{"key":31,"text":342,"correct":22},"价款",{"key":34,"text":344,"correct":26},"争议解决",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":272,"analysis":37},982070,"关于建设工程施工合同时间管理，下列说法正确的有()。",[349,351,353,355,357],{"key":20,"text":350,"correct":26},"范围是建设工程施工合同的核心要素",{"key":24,"text":352,"correct":22},"监理人在发出开工通知时，应当征得发包人的同意，并且同样需要满足法律规定和合同约定的开工条件",{"key":28,"text":354,"correct":22},"无论是何种原因导致工期延误，作为合同主体的任何一方，均应当遵循合同法的诚信原则，不得扩大损失，不得因一方的违约而获得违法利益",{"key":31,"text":356,"correct":22},"发包人应参与工程质量验收活动",{"key":34,"text":358,"correct":22},"无论对于发包人还是承包人，工期都是至关重要的",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":199,"analysis":37},982071,"下列各项中，属于设计协调程序内容的有()。",[363,365,367,369,371],{"key":20,"text":364,"correct":22},"设计管理联络方式和双方对口负责人",{"key":24,"text":366,"correct":22},"发包人提供设计所需的项目基础资料和项目设计数据的内容，并明确提供的时间和",{"key":28,"text":368,"correct":22},"推荐备品备件的内容和数量",{"key":31,"text":370,"correct":26},"设计人员资格的管理",{"key":34,"text":372,"correct":22},"设计中采用非常规做法的内容",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":228,"analysis":37},982072,"下列属于《2007版标准文件》的特点的有()。",[377,379,381,383,385],{"key":20,"text":378,"correct":22},"合同条款设定的合理性和全面性",{"key":24,"text":380,"correct":26},"采用固定条款模式",{"key":28,"text":382,"correct":22},"采用监理人为合同文件的传递中心的机制",{"key":31,"text":384,"correct":22},"引入缺陷责任期制度，解决质量保证金返还的争议",{"key":34,"text":386,"correct":22},"增加商定或确定制度，减少合同分歧",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":110,"analysis":37},982073,"下列属于《2007版标准文件》合同条款组成的有（）。",[391,393,395,397,399],{"key":20,"text":392,"correct":22},"通用合同条款",{"key":24,"text":394,"correct":22},"专用合同条款",{"key":28,"text":396,"correct":26},"普通合同条款",{"key":31,"text":398,"correct":26},"特殊合同条款",{"key":34,"text":400,"correct":22},"合同附件",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":415,"analysis":37},982074,"工程总承包合同中的索赔包括()。",[405,407,409,411,413],{"key":20,"text":406,"correct":22},"承包人索赔的提出",{"key":24,"text":408,"correct":22},"承包人索赔处理程序",{"key":28,"text":410,"correct":22},"承包人提出索赔的期限",{"key":31,"text":412,"correct":22},"发包人的索赔和处理等",{"key":34,"text":414,"correct":26},"发包人提出诉讼","ABCD",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":52,"analysis":37},982075,"实践中常见的违法招标行为有()。",[420,422,424,426,428],{"key":20,"text":421,"correct":22},"“不具备招标条件的招标”的情形",{"key":24,"text":423,"correct":22},"“两次招标”的情形",{"key":28,"text":425,"correct":26},"“冒充招标”的情形",{"key":31,"text":427,"correct":22},"“补办招标手续”的情形",{"key":34,"text":429,"correct":22},"“不具备自行招标条件的发包人自行组织招标”的情形",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":199,"analysis":37},982076,"1999年9月，FIDIC出版了一套标准合同条件，其内容包括()。",[434,436,438,440,442],{"key":20,"text":435,"correct":22},"《施工合同条件》（新红皮书）",{"key":24,"text":437,"correct":22},"《设备与设计一建造合同》（新黄皮书）",{"key":28,"text":439,"correct":22},"《EPC\u002F交钥匙项目合同条件》（银皮书）",{"key":31,"text":441,"correct":26},"《1999版施工合同》（白皮书）",{"key":34,"text":443,"correct":22},"《简明合同格式》（绿皮书）",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":199,"analysis":37},982077,"关于简明标准施工招标文件（2012年版）合同条款，下列说法正确的有()。",[448,450,452,454,456],{"key":20,"text":449,"correct":22},"《简明标准施工招标文件》适用于技术相对简单且设计和施工不是由同一承包人承担的小型项目施工招标",{"key":24,"text":451,"correct":22},"专用合同条款是预留给合同当事人对通用合同条款的开放性条款进行细化或补充的条款",{"key":28,"text":453,"correct":22},"《简明标准施工招标文件》合同条款比《2007版标准文件》合同条款的内容要少",{"key":31,"text":455,"correct":26},"即使“专用合同条款”补充和细化的内容与“通用合同条款”相冲突，国务院有关行业管部门也可根据本行业招标特点和管理需要，通过“专用合同条款”对“通用合同条款”进行补充、细化，冲突的内容仍然有效",{"key":34,"text":457,"correct":22},"《简明标准施工招标文件》约定的履约程序较为精炼、便捷，符合小型工程的施工需要",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":199,"analysis":37},982078,"下列关于工程总承包的说法中，正确的有()。",[462,464,466,468,470],{"key":20,"text":463,"correct":22},"提倡对建筑工程实行总承包",{"key":24,"text":465,"correct":22},"发包单位可以将建筑工程的所有工作发包给一个工程总承包单位",{"key":28,"text":467,"correct":22},"发包单位可以将建筑工程中的一项或者多项发包给一个工程总承包单位",{"key":31,"text":469,"correct":26},"发包单位可以将建筑工程肢解成若干部分发包给几个承包单位",{"key":34,"text":471,"correct":22},"发包单位不可以将应当由一个承包单位完成的建筑工程肢解成若干部分发包给几个承包单位",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":67,"analysis":37},982079,"关于工程总承包合同的分包管理，下列说法正确的有()。",[476,478,480,482,484],{"key":20,"text":477,"correct":22},"承包人可以按照法律规定和专用条款约定，将总承包范围的有关工作事项进行分包",{"key":24,"text":479,"correct":22},"承包人不得将其承包的全部工程转包给第三人，也不得将其承包的全部工程肢解后以分包的名义分别转包给第三人",{"key":28,"text":481,"correct":22},"分包人应符合国家法律规定的企业资质等级，否则不能作为分包人，承包人有义务对分包人的资质进行审查，分包人的资格能力应与其分包工作的标准和规模相适应",{"key":31,"text":483,"correct":26},"承包人应按分包合同约定，按时向分包人支付合同价款。发包人可以向分包人支付款项",{"key":34,"text":485,"correct":26},"分包人应符合国家法律规定的企业资质等级，否则不能作为分包人，承包人无义务对分包人的资质进行审查，分包人的资格能力应与其分包工作的标准和规模相适应",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":415,"analysis":37},982080,"目前，在建设工程领域可以适用的调解机构有()。",[490,492,494,496,498],{"key":20,"text":491,"correct":22},"行政机关下属的具有调解职能的机构",{"key":24,"text":493,"correct":22},"行业协会调解机构",{"key":28,"text":495,"correct":22},"仲裁机构的调解中心",{"key":31,"text":497,"correct":22},"有专业声望的调解员",{"key":34,"text":499,"correct":26},"劳动争议仲裁调解委员会",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":110,"analysis":37},982081,"下列关于设计文件与协调的说法中，正确的有()。",[504,506,508,510,512],{"key":20,"text":505,"correct":22},"民用建筑工程设计一般分为方案设计、初步设计和施工图设计三个阶段",{"key":24,"text":507,"correct":22},"初步设计文件应当满足编制施工招标文件、主要设备材料订货和编制施工图设计文件的需要，是下一阶段施工图设计的基础",{"key":28,"text":509,"correct":26},"除合同另有约定外，自监理人收到承包人的设计文件以及承包人的通知之日起，发包人对承包人的设计文件审查期不超过20天",{"key":31,"text":511,"correct":26},"承包人的设计文件不需要报发包人审查同意",{"key":34,"text":513,"correct":22},"承包人应按照发包人要求，在合同进度计划中专门列出设计进度计划，报发包人批准后执行。承包人需按照经批准后的计划开展设计工作",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":528,"analysis":37},982082,"工程建设项目施工招标投标中，关于中标合同当事人的权利义务，下列说法正确的有()。",[518,520,522,524,526],{"key":20,"text":519,"correct":26},"中标人不能对施工总承包合同进行概括转让",{"key":24,"text":521,"correct":22},"中标无效的，原中标人与招标人所签订的施工总承包合同当然无效",{"key":28,"text":523,"correct":22},"施工总承包人在合同中享有的权利可以转让，并只需通知发包人即可",{"key":31,"text":525,"correct":26},"招标人在招标文件和施工总承包合同中不得指定分包",{"key":34,"text":527,"correct":22},"招标人和中标人不得就订立合同进行谈判","BCE",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":228,"analysis":37},982083,"下列属于建设工程施工合同特点的有()。",[533,535,537,539,541],{"key":20,"text":534,"correct":22},"建设工程施工合同应当采用书面形式",{"key":24,"text":536,"correct":26},"建设工程施工合同是建设工程合同中的主要合同类型",{"key":28,"text":538,"correct":22},"建设工程施工合同主体资格的特殊要求",{"key":31,"text":540,"correct":22},"建设工程施工合同订立和履行受到监管",{"key":34,"text":542,"correct":22},"建设工程施工合同的履行具有长期性及复杂性",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":67,"analysis":37},982084,"设计人向发包人提交设计人项目管理机构及人员安排的报告，其内容应包括()。",[547,549,551,553,555],{"key":20,"text":548,"correct":22},"工艺专业负责人名单",{"key":24,"text":550,"correct":22},"设备专业负责人名单",{"key":28,"text":552,"correct":22},"负责人注册执业资格或职称",{"key":31,"text":554,"correct":26},"项目负责人职业资格等级",{"key":34,"text":556,"correct":26},"项目负责人授权范围",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":184,"analysis":37},982085,"设计合同价款的组成部分包括()。",[561,563,565,567,569],{"key":20,"text":562,"correct":26},"定金",{"key":24,"text":564,"correct":22},"工程设计基本服务费用",{"key":28,"text":566,"correct":22},"工程设计其他服务费用",{"key":31,"text":568,"correct":22},"未签订合同前发包人已经同意或接受或已经使用的设计人为发包人所做的各项工作的相应费用",{"key":34,"text":570,"correct":26},"预付款",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":585,"analysis":37},982086,"《工程总承包合同示范文本》由()组成。",[575,577,579,581,583],{"key":20,"text":576,"correct":22},"合同协议书",{"key":24,"text":578,"correct":26},"安全责任书",{"key":28,"text":580,"correct":22},"通用条款",{"key":31,"text":582,"correct":22},"专用条款",{"key":34,"text":584,"correct":26},"附件","ACD",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":415,"analysis":37},982087,"在勘察设计合同变更管理中需要注意()。",[590,592,594,596,598],{"key":20,"text":591,"correct":22},"应尽快提出变更要求或指令",{"key":24,"text":593,"correct":22},"应尽快下达变更要求或指令",{"key":28,"text":595,"correct":22},"应迅速而全面地落实和执行变更指令",{"key":31,"text":597,"correct":22},"应严格遵守变更程序",{"key":34,"text":599,"correct":26},"为尽快下达变更指令，当事人双方可以不签署变更协议",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":52,"analysis":37},982088,"《2013版施工合同》适用于()等建设工程的施工承发包活动。",[604,606,608,610,612],{"key":20,"text":605,"correct":22},"房屋建筑工程",{"key":24,"text":607,"correct":22},"土木工程",{"key":28,"text":609,"correct":26},"水利工程",{"key":31,"text":611,"correct":22},"设备安装工程",{"key":34,"text":613,"correct":22},"装修工程",{"id":615,"libraryId":5,"type":15,"typeLabel":16,"stem":616,"options":617,"answer":184,"analysis":37},982089,"按照合同价格形式的不同，建设工程施工合同可以分为()。",[618,619,621,623,625],{"key":20,"text":146,"correct":26},{"key":24,"text":620,"correct":22},"单价合同",{"key":28,"text":622,"correct":22},"总价合同",{"key":31,"text":624,"correct":22},"其他价格形式的合同",{"key":34,"text":152,"correct":26},{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":272,"analysis":37},982090,"《2013版施工合同》强调了()等合同管理制度。",[630,632,634,636,638],{"key":20,"text":631,"correct":26},"强调工期、进度、工程质量制度",{"key":24,"text":633,"correct":22},"细化合理调价制度",{"key":28,"text":635,"correct":22},"强调双向担保制度",{"key":31,"text":637,"correct":22},"完善逾期索赔失权制度",{"key":34,"text":639,"correct":22},"新增双倍赔偿制度",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":199,"analysis":37},982091,"在勘察合同中，通常首先要对所委托勘察的工程基本情况和勘察任务进行说明，其主要内容包括()。",[644,646,648,650,651],{"key":20,"text":645,"correct":22},"建设工程项目的名称",{"key":24,"text":647,"correct":22},"工程地点",{"key":28,"text":649,"correct":22},"工程规模、特征",{"key":31,"text":336,"correct":26},{"key":34,"text":652,"correct":22},"勘察任务与技术要求",{"id":654,"libraryId":5,"type":15,"typeLabel":16,"stem":655,"options":656,"answer":52,"analysis":37},982092,"下列属于设计进度主要控制点的有()。",[657,659,661,663,665],{"key":20,"text":658,"correct":22},"设计各专业间的条件关系及其进度",{"key":24,"text":660,"correct":22},"初步设计完成和提交时间",{"key":28,"text":662,"correct":26},"设计技术方案的评审",{"key":31,"text":664,"correct":22},"关键设备和材料请购文件的提交时间",{"key":34,"text":666,"correct":22},"进度关键线路上的设计文件提交时间",{"id":668,"libraryId":5,"type":15,"typeLabel":16,"stem":669,"options":670,"answer":67,"analysis":37},982093,"下列工程建设项目中，必须进行招标的有()。",[671,673,675,677,679],{"key":20,"text":672,"correct":22},"大型公共基础设施建设项目",{"key":24,"text":674,"correct":22},"部分使用国有资金投资的项目",{"key":28,"text":676,"correct":22},"使用外国政府贷款的项目",{"key":31,"text":678,"correct":26},"需要改建的公用事业项目",{"key":34,"text":680,"correct":26},"抢险救灾建设项目",{"id":682,"libraryId":5,"type":15,"typeLabel":16,"stem":683,"options":684,"answer":155,"analysis":37},982094,"在施工专业分包合同的履行管理中，涉及的内容有()。",[685,687,689,691,693],{"key":20,"text":686,"correct":22},"发包人对总承包合同的管理",{"key":24,"text":688,"correct":22},"监理人对专业分包工程的管理",{"key":28,"text":690,"correct":26},"专业分包工程的相关管理",{"key":31,"text":692,"correct":22},"总承包人对施工专业分包合同的管理",{"key":34,"text":694,"correct":26},"施工专业分包合同的支付管理",{"id":696,"libraryId":5,"type":15,"typeLabel":16,"stem":697,"options":698,"answer":415,"analysis":37},982095,"工程总承包是对工程项目的()等实行全过程或若干阶段的承包。",[699,701,703,705,707],{"key":20,"text":700,"correct":22},"勘察",{"key":24,"text":702,"correct":22},"设计",{"key":28,"text":704,"correct":22},"采购",{"key":31,"text":706,"correct":22},"施工",{"key":34,"text":708,"correct":26},"运行与维护",{"id":710,"libraryId":5,"type":15,"typeLabel":16,"stem":711,"options":712,"answer":287,"analysis":37},982096,"在国际工程总承包合同文本中，()是英国以及英联邦国家的主流合同条件。",[713,715,717,719,721],{"key":20,"text":714,"correct":26},"AIA",{"key":24,"text":716,"correct":22},"ICE",{"key":28,"text":718,"correct":26},"AGC",{"key":31,"text":720,"correct":22},"JCT",{"key":34,"text":722,"correct":26},"FIDIC",{"id":724,"libraryId":5,"type":15,"typeLabel":16,"stem":725,"options":726,"answer":228,"analysis":37},982097,"依法必须进行勘察设计招标的工程建设项目，在招标时应当具备的条件包括()。",[727,729,731,733,735],{"key":20,"text":728,"correct":22},"按照国家有关规定需要履行项目审批手续的，已履行审批手续，取得批准",{"key":24,"text":730,"correct":26},"在项目所在地行政主管部门备案",{"key":28,"text":732,"correct":22},"勘察设计所需资金已经落实",{"key":31,"text":734,"correct":22},"所必需的勘察设计基础资料已经收集完成",{"key":34,"text":736,"correct":22},"法律法规规定的其他条件",[738,742,745,748,751,754],{"id":739,"name":740,"category":7,"favorite":741},1,"领导干部任职前廉政法规知识测试题",92,{"id":743,"name":744,"category":7,"favorite":739},595,"建筑结构与设备",{"id":746,"name":747,"category":7,"favorite":739},715,"招标采购专业知识与法律法规",{"id":749,"name":750,"category":7,"favorite":739},848,"市政方向-通用基础",{"id":752,"name":753,"category":7,"favorite":8},534,"BIM工程师",{"id":755,"name":753,"category":7,"favorite":8},535]