[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-710-10":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":736},{"id":5,"name":6,"category":7,"favorite":8},710,"招标采购合同管理-(原案例分析)","建筑工程",0,10,50,768,[13,38,53,68,83,98,113,126,141,155,169,183,198,212,226,240,254,269,283,297,312,326,339,353,365,379,394,409,424,438,452,466,480,494,508,522,536,550,564,579,594,608,622,637,651,665,679,693,707,722],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},981998,2,"多选题","关于工作单元与合同单元的关系，下列理解正确的有()。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","具备独立交易条件和可以独立作为合同内容的最小工作单元，即为最小合同单元",true,{"key":24,"text":25,"correct":22},"B","不能独立交易、不能独立作为合同内容的最小工作单元，应与其他最小工作单元一起构成最小合同单元",{"key":27,"text":28,"correct":22},"C","确定最小工作单元和最小合同单元是确定招标合同单元的前提",{"key":30,"text":31,"correct":32},"D","合理确定最小工作单元和最小合同单元是招标采购合同规划的根本目的",false,{"key":34,"text":35,"correct":22},"E","合理确定招标合同单元是招标采购合同规划的根本目的","ABCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},981999,"招标采购合同跟踪的内容包括()。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"项目计划和目标的实现情况",{"key":24,"text":45,"correct":22},"政治、经济因素",{"key":27,"text":47,"correct":22},"项目投入、资金使用情况",{"key":30,"text":49,"correct":22},"资源到位程度",{"key":34,"text":51,"correct":32},"承包人经营情况","ABCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},982000,"合同要素的计划和配置成果文件应以()的形式体现。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"合同要素提纲",{"key":24,"text":60,"correct":32},"合同配置书",{"key":27,"text":62,"correct":32},"合同要素计划提纲",{"key":30,"text":64,"correct":22},"合同要素计划配置书",{"key":34,"text":66,"correct":32},"合同要素计划分配书","AD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},982001,"合同交底的程序为逐级进行交底，逐级分解合同任务，主要包括()。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"编制合同交底方案",{"key":24,"text":75,"correct":32},"合同履行计划",{"key":27,"text":77,"correct":22},"事项答疑",{"key":30,"text":79,"correct":22},"意见反馈",{"key":34,"text":81,"correct":22},"合同完善","ACDE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},982002,"招标采购合同规划对整个项目的实施和管理的具体作用主要体现在()。",[87,89,91,93,95],{"key":20,"text":88,"correct":32},"有助于落实招标合同管理体系",{"key":24,"text":90,"correct":22},"有助于明晰招标采购各参与主体的权利义务界限，分清责任，发挥主观能动作用",{"key":27,"text":92,"correct":22},"有助于减少工程建设项目全过程中各参与主体之间的纷争",{"key":30,"text":94,"correct":22},"有助于减少政府采购活动全过程中各参与主体之间的纷争",{"key":34,"text":96,"correct":22},"有助于节约成本、提高效率","BCDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},982003,"建构项目合同体系的核心原则包括()。",[102,104,106,108,110],{"key":20,"text":103,"correct":32},"合理性",{"key":24,"text":105,"correct":22},"合法性",{"key":27,"text":107,"correct":32},"严密性",{"key":30,"text":109,"correct":22},"经济性",{"key":34,"text":111,"correct":22},"系统性","BDE",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":82,"analysis":37},982004,"招标采购合同规划的最终成果文件应包括的内容有()。",[117,119,121,122,124],{"key":20,"text":118,"correct":22},"项目概况",{"key":24,"text":120,"correct":32},"后期合同规划",{"key":27,"text":66,"correct":22},{"key":30,"text":123,"correct":22},"合同订立顺序及条件建议书",{"key":34,"text":125,"correct":22},"成果文件的使用条件及使用提示",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},982005,"合同目标管理可以分为()。",[130,132,134,136,138],{"key":20,"text":131,"correct":32},"合同交底管理",{"key":24,"text":133,"correct":22},"投资总额控制管理",{"key":27,"text":135,"correct":22},"质量安全目标管理",{"key":30,"text":137,"correct":32},"重点要素管理",{"key":34,"text":139,"correct":22},"时间管理","BCE",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":97,"analysis":37},982006,"招标采购合同规划的内容包括()。",[145,147,149,151,153],{"key":20,"text":146,"correct":32},"合同资料整理",{"key":24,"text":148,"correct":22},"合同数量及种类规划",{"key":27,"text":150,"correct":22},"合同体系确立",{"key":30,"text":152,"correct":22},"合同要素确定",{"key":34,"text":154,"correct":22},"合同动态跟踪评估规划",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":140,"analysis":37},982007,"下列关于合同收尾的表述中，正确的有()。",[159,161,163,165,167],{"key":20,"text":160,"correct":32},"合同收尾与项目收尾没有区别",{"key":24,"text":162,"correct":22},"合同收尾与项目收尾有区别",{"key":27,"text":164,"correct":22},"合同收尾与项目收尾都涉及相关工作和可交付成果的验证",{"key":30,"text":166,"correct":32},"项目收尾还需考虑项目或项目阶段适用的每项合同的收尾工作",{"key":34,"text":168,"correct":22},"在合同收尾后，未解决的争议可能需进入诉讼程序",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":52,"analysis":37},982008,"招标师在指导招投标双方签订合同过程中应注意的事项有()。",[173,175,177,179,181],{"key":20,"text":174,"correct":22},"确认合同主体适格",{"key":24,"text":176,"correct":22},"重视合同内容审核",{"key":27,"text":178,"correct":22},"保证签约程序合法",{"key":30,"text":180,"correct":22},"明确签约代表权限",{"key":34,"text":182,"correct":32},"保证交易安全性",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":197,"analysis":37},982009,"招标师进行初步合同规划工作需依赖于招标人提供全面详实的()。",[187,189,191,193,195],{"key":20,"text":188,"correct":22},"项目信息",{"key":24,"text":190,"correct":32},"内部需求信息",{"key":27,"text":192,"correct":32},"外部需求信息",{"key":30,"text":194,"correct":22},"功能需求信息",{"key":34,"text":196,"correct":22},"技术指标信息","ADE",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":52,"analysis":37},982010,"招标采购跟踪过程中可以应用的管理方法和手段比较多，在选择采用的方法时，应注意()。",[202,204,206,208,210],{"key":20,"text":203,"correct":22},"合同跟踪和信息管理的总体规划相协调",{"key":24,"text":205,"correct":22},"合同跟踪的及时性",{"key":27,"text":207,"correct":22},"信息的标准化和报表的规范化",{"key":30,"text":209,"correct":22},"应用先进的IT技术",{"key":34,"text":211,"correct":32},"阶段性目标的匹配程度",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":112,"analysis":37},982011,"下列属于特殊的合同要素的有()。",[216,218,220,222,224],{"key":20,"text":217,"correct":32},"当事人的名称或姓名及住所",{"key":24,"text":219,"correct":22},"施工合同中的变更、暂停施工、价格调整、索赔等要素",{"key":27,"text":221,"correct":32},"违约责任和争议解决方法",{"key":30,"text":223,"correct":22},"国际货物买卖合同中的贸易术语、保险等要素",{"key":34,"text":225,"correct":22},"监理合同中监理人工作范围、工作要求等要素",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":52,"analysis":37},982012,"合同结构体系说明的内容包括()。",[230,232,234,236,238],{"key":20,"text":231,"correct":22},"合同描述",{"key":24,"text":233,"correct":22},"进度安排",{"key":27,"text":235,"correct":22},"质量标准",{"key":30,"text":237,"correct":22},"合同主体",{"key":34,"text":239,"correct":32},"合同客体",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":52,"analysis":37},982013,"合同交底在招标采购合同管理中的作用主要体现在()。",[244,246,248,250,252],{"key":20,"text":245,"correct":22},"有助于规范合同各方管理行为，促进工程项目目标的实现",{"key":24,"text":247,"correct":22},"合同交底是项目管理人员理解工作职责的需要",{"key":27,"text":249,"correct":22},"有利于及时发现合同隐藏的问题，事先控制合同风险",{"key":30,"text":251,"correct":22},"有助于落实招标采购合同管理体系",{"key":34,"text":253,"correct":32},"有利于优化资源配置，节约项目总体投资成本",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":268,"analysis":37},982014,"下列各项中，属于经过总体合同结构分解应达到的效果的有()。",[258,260,262,264,266],{"key":20,"text":259,"correct":22},"明确项目相关所有合同的种类、数量，并确定合同主体",{"key":24,"text":261,"correct":32},"合同结构分解应分解至最小合同单元",{"key":27,"text":263,"correct":22},"合同结构分解应分解至最小工作单元",{"key":30,"text":265,"correct":22},"合同分解的成果应以书面形式固定",{"key":34,"text":267,"correct":32},"合同分解的成果必须采用树状结构形式表达","ACD",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":52,"analysis":37},982015,"合同拟定的工作人员应当具备的条件包括()。",[273,275,277,279,281],{"key":20,"text":274,"correct":22},"了解相关市场环境",{"key":24,"text":276,"correct":22},"文字能力强、沟通能力良好",{"key":27,"text":278,"correct":22},"熟悉招标人内部管理现状、管理水平及职责分工",{"key":30,"text":280,"correct":22},"精通具体交易活动，了解具体交易活动的特征，并具有相关经历经验",{"key":34,"text":282,"correct":32},"了解相关法律法规",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":52,"analysis":37},982016,"合同规划为招标方案的编制提供了相关条件，主要体现在()。",[287,289,291,293,295],{"key":20,"text":288,"correct":22},"招标采购合同规划的阶段成果文件是招标方案编制的重要依据之一",{"key":24,"text":290,"correct":22},"招标方案工作可以充分借用合同规划工作信息、资料以及成果文件",{"key":27,"text":292,"correct":22},"招标工作是否顺利完成是合同规划的重要目的之一",{"key":30,"text":294,"correct":22},"招标采购合同规划中确定的最小工作单元、最小合同单元、招标合同单元是否分解合理、组合得当，直接影响着招标方案中相应环节或工作的编制安排是否科学合理",{"key":34,"text":296,"correct":32},"招标采购合同规划是招标方案编制的唯一依据",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":311,"analysis":37},982017,"精益思维的原则包括()。",[301,303,305,307,309],{"key":20,"text":302,"correct":22},"减少浪费",{"key":24,"text":304,"correct":22},"确定项目关键节点",{"key":27,"text":306,"correct":32},"注重绩效评价",{"key":30,"text":308,"correct":32},"注重过程标准化",{"key":34,"text":310,"correct":22},"要求项目全流程的顺畅不间断","ABE",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":112,"analysis":37},982018,"下列关于招标采购合同规划与项目管理方案的关系的说法，正确的有()。",[316,318,320,322,324],{"key":20,"text":317,"correct":32},"对项目进行工作分解以招标采购合同规划为基础",{"key":24,"text":319,"correct":22},"项目管理方案应建立在对项目进行工作分解的基础上",{"key":27,"text":321,"correct":32},"招标采购合同规划是项目管理方案内容的基础条件",{"key":30,"text":323,"correct":22},"招标采购合同规划应建立在对项目进行工作分解的基础上",{"key":34,"text":325,"correct":22},"招标采购合同规划直接影响项目管理方案目标的实现",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":82,"analysis":37},982019,"下列各项属于合同重点要素管理的有()。",[330,332,334,336,338],{"key":20,"text":331,"correct":22},"合同主体管理",{"key":24,"text":333,"correct":32},"合同客体管理",{"key":27,"text":335,"correct":22},"投资管理",{"key":30,"text":337,"correct":22},"质量管理",{"key":34,"text":139,"correct":22},{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":352,"analysis":37},982020,"工作分解结构的作用有()。",[343,345,347,348,350],{"key":20,"text":344,"correct":22},"清晰梳理工程建设项目或政府采购活动的全貌",{"key":24,"text":346,"correct":22},"清晰地表示各项目工作之间的相互关系",{"key":27,"text":251,"correct":32},{"key":30,"text":349,"correct":22},"有助于准确界定项目工作的内容和范围",{"key":34,"text":351,"correct":22},"有助于招标人确定项目管理人员和有效地管理项目","ABDE",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":36,"analysis":37},982021,"合同交底的内容包括()。",[357,359,361,363,364],{"key":20,"text":358,"correct":22},"合同目标",{"key":24,"text":360,"correct":22},"合同要素",{"key":27,"text":362,"correct":22},"合同履行程序",{"key":30,"text":77,"correct":32},{"key":34,"text":146,"correct":22},{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":36,"analysis":37},982022,"《建设工程勘察合同示范文本（二）》针对岩土工程设计、治理、监测等勘察成果验收的复杂性进行的专门约定，主要包括()。",[369,371,373,375,377],{"key":20,"text":370,"correct":22},"由发包人负责组织对勘察人交付的报告、成果、文件进行检查验收",{"key":24,"text":372,"correct":22},"发包人逾期未检查验收的，视为接受勘察人的报告、成果、文件",{"key":27,"text":374,"correct":22},"隐蔽工程工序质量检查，由勘察人自检合格后，书面通知发包人检查",{"key":30,"text":376,"correct":32},"工程未经验收，发包人提前使用，由此发生的质量、安全问题，由勘察人承担责任",{"key":34,"text":378,"correct":22},"完工工程经验收合格并移交完毕，如发包人不能按时接管，致使已验收工程发生损失，应由发包人承担",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":393,"analysis":37},982023,"《标准设计施工总承包招标文件》的专用合同条款是合同双方当事人通过谈判和协商，对通用合同条款进行的()的条款。",[383,385,387,389,391],{"key":20,"text":384,"correct":22},"补充",{"key":24,"text":386,"correct":32},"特化",{"key":27,"text":388,"correct":22},"修改",{"key":30,"text":390,"correct":32},"备注",{"key":34,"text":392,"correct":22},"完善","ACE",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":408,"analysis":37},982024,"工程总承包的()等，由发包人与工程总承包企业在合同中约定。",[398,400,402,404,406],{"key":20,"text":399,"correct":22},"具体方式",{"key":24,"text":401,"correct":22},"工作内容",{"key":27,"text":403,"correct":22},"责任",{"key":30,"text":405,"correct":32},"费用",{"key":34,"text":407,"correct":32},"其它具体事项","ABC",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":423,"analysis":37},982025,"关于工程总承包合同，下列说法正确的有()。",[413,415,417,419,421],{"key":20,"text":414,"correct":22},"工程总承包合同具有明确发包人与承包人之间权利义务关系的作用",{"key":24,"text":416,"correct":22},"工程总承包合同的发包人一般是建设单位",{"key":27,"text":418,"correct":32},"对从事工程总承包业务的企业专门设立有工程总承包资质",{"key":30,"text":420,"correct":32},"工程勘察、设计、施工企业必须单独承包工程的某一部分，不可以组成联合体进行联合总承包",{"key":34,"text":422,"correct":32},"工程总承包单位和分包单位按照总承包合同的约定对建设单位负责","AB",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":36,"analysis":37},982026,"承发包双方在工程承包合同履行过程中发生纠纷，可以选择解决争议的方式有()。",[428,430,432,434,436],{"key":20,"text":429,"correct":22},"诉讼",{"key":24,"text":431,"correct":22},"劳动仲裁",{"key":27,"text":433,"correct":22},"和解",{"key":30,"text":435,"correct":32},"争议评审",{"key":34,"text":437,"correct":22},"调解",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":36,"analysis":37},982027,"关于工程总承包合同主体与客体的法律地位，下列说法正确的有()。",[442,444,446,448,450],{"key":20,"text":443,"correct":22},"工程总承包合同的发包人是指具有工程发包主体资格和支付工程价款能力的当事人以及取得该当事人资格的合法继承人",{"key":24,"text":445,"correct":22},"工程总承包合同的承包人是被发包人接受的具有工程总承包主体资格的当事人或取得该当事人资格的合法继承人",{"key":27,"text":447,"correct":22},"作为建设工程的发包人应具有合法性，才能成为法律意义上的发包人",{"key":30,"text":449,"correct":32},"承揽工程总承包业务的企业必须依法设立，不一定需要持有国家认可的相应资质证书",{"key":34,"text":451,"correct":22},"工程总承包合同法律关系的客体是指发包人委托工程总承包的建设项目，工程总承包可以是建设项目的设计、采购、施工（含竣工试验）、试运行等全过程或若干阶段的工程承包",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":36,"analysis":37},982028,"下列各项中，属于“发包人要求”中工程范围内容的有()。",[456,458,460,462,464],{"key":20,"text":457,"correct":22},"工作界区",{"key":24,"text":459,"correct":22},"包括的工作",{"key":27,"text":461,"correct":22},"发包人提供的现场条件",{"key":30,"text":463,"correct":32},"设计标准和规范",{"key":34,"text":465,"correct":22},"发包人提供的技术文件",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":352,"analysis":37},982029,"下列属于建设工程施工合同管理的基本原则的主要内容的有()。",[470,472,474,476,478],{"key":20,"text":471,"correct":22},"计划为先原则",{"key":24,"text":473,"correct":22},"目标管理原则",{"key":27,"text":475,"correct":32},"财务预算原则",{"key":30,"text":477,"correct":22},"信息通畅原则",{"key":34,"text":479,"correct":22},"全过程管理原则",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":408,"analysis":37},982030,"下列关于提交资料和提交的勘察成果的说法中，正确的有()。",[484,486,488,490,492],{"key":20,"text":485,"correct":22},"发包人应及时向勘察人提供相关的文件资料，并对其准确性、可靠性负责",{"key":24,"text":487,"correct":22},"发包人应向勘察人提供工程批准文件和勘察许可等批件（复印件）",{"key":27,"text":489,"correct":22},"勘察人应按时向发包人提交勘察成果资料并对其质量负责",{"key":30,"text":491,"correct":32},"适用《建设工程勘察合同示范文本（一）》的勘察活动需要分批提供成果资料文件",{"key":34,"text":493,"correct":32},"适用《建设工程勘察合同示范文本（一）》的勘察活动需要提交四份勘察成果资料",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":82,"analysis":37},982031,"关于申请竣工验收申请报告的条件，下列说法正确的有()。",[498,500,502,504,506],{"key":20,"text":499,"correct":22},"已按合同约定的内容和份数备齐了符合要求的竣工文件",{"key":24,"text":501,"correct":32},"除监理人同意列入缺陷责任期内完成的尾工（甩项）工程和缺陷修补工作外，合同范围内的全部区段工程以及有关工作，包括合同要求的试验和竣工试验大部分已完成，并符合合同要求",{"key":27,"text":503,"correct":22},"监理人要求在竣工验收前应完成的其他工作",{"key":30,"text":505,"correct":22},"已按监理人的要求编制了在缺陷责任期内完成的尾工（甩项）工程和缺陷修补工作清单以及相应施工计划",{"key":34,"text":507,"correct":22},"监理人要求提交的竣工验收资料清单",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":352,"analysis":37},982032,"关于工期条款，下列说法正确的有()。",[512,514,516,518,520],{"key":20,"text":513,"correct":22},"合同当事人在签订工期条款时，首先，应当明确约定开工日期和竣工日期，而且要载明具体的工期总日历天数",{"key":24,"text":515,"correct":22},"为了充分保障合同当事人的工期利益，标准文件同时规定合同当事人可以在专用合同条款中增列因发包人原因导致工期延误的情形",{"key":27,"text":517,"correct":32},"工程实践中，实际开工日期和实际竣工日期往往与计划开竣工日期往往是一致的",{"key":30,"text":519,"correct":22},"因发包人原因导致工期延误的，工期可以顺延，发包人还可能需要向承包人支付因工期延误给其增加的费用，且发包人应支付承包人合理的利润",{"key":34,"text":521,"correct":22},"为避免出现合同履行中工期延误产生的不利局面，发包人应在施工合同中明确约定逾期竣工的违约金计算方法",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":352,"analysis":37},982033,"根据索赔发生的原因不同，可将其分为()。",[526,528,530,532,534],{"key":20,"text":527,"correct":22},"合同一方违约引发的索赔",{"key":24,"text":529,"correct":22},"合同文件错误",{"key":27,"text":531,"correct":32},"政策规定",{"key":30,"text":533,"correct":22},"施工外部环境变化",{"key":34,"text":535,"correct":22},"其他原因引起的索赔",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":97,"analysis":37},982034,"通常而言，发包人在与承包人签订建设工程施工合同前应确保完成的事项包括()。",[540,542,544,546,548],{"key":20,"text":541,"correct":32},"工程项目的整体设计已经批准",{"key":24,"text":543,"correct":22},"工程项目已经列入年度建设计划",{"key":27,"text":545,"correct":22},"有能够满足施工需要的设计文件和有关技术资料",{"key":30,"text":547,"correct":22},"建设资金和主要建筑材料设备来源已经落实",{"key":34,"text":549,"correct":22},"招标发包工程，已经完成招投标程序且已经确定中标人。",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":82,"analysis":37},982035,"设计施工一体化的优点有()。",[554,556,558,560,562],{"key":20,"text":555,"correct":22},"不会导致设计、施工等多方之间相互推卸责任的情况",{"key":24,"text":557,"correct":32},"有利于降低后期施工的失误率",{"key":27,"text":559,"correct":22},"有利于缩短建设周期",{"key":30,"text":561,"correct":22},"有利于提高设计的可施工性",{"key":34,"text":563,"correct":22},"有利于降低工程造价",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":578,"analysis":37},982036,"下列各项中，主要应用于土木工程的合同条件有()。",[568,570,572,574,576],{"key":20,"text":569,"correct":22},"FIDIC",{"key":24,"text":571,"correct":32},"AIA",{"key":27,"text":573,"correct":22},"ICE",{"key":30,"text":575,"correct":32},"AGC",{"key":34,"text":577,"correct":32},"JCT","AC",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":593,"analysis":37},982037,"下列关于工程设计进度延误或暂停的说法中，正确的有()。",[583,585,587,589,591],{"key":20,"text":584,"correct":32},"因发包人原因造成工程设计进度延误情形导致增加了设计工作量的，发包人应承担由此增加的设计费用和（或）延长的设计周期",{"key":24,"text":586,"correct":22},"设计人在收到发包人复工指示后15天内仍未复工的，视为设计人无法继续履行合同的情形",{"key":27,"text":588,"correct":22},"因发包人原因引起的暂停设计，发包人应承担由此增加的设计费用",{"key":30,"text":590,"correct":22},"因设计人原因导致工程设计进度延误的，设计人应当按照合同条款约定承担违约责任",{"key":34,"text":592,"correct":32},"设计人支付逾期完成工程设计违约金后，可免除设计人继续完成工程设计的义务","BCD",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":82,"analysis":37},982038,"关于变更程序，下列说法正确的有()。",[598,600,602,604,606],{"key":20,"text":599,"correct":22},"变更程序按照提出变更、变更估价、变更指示执行",{"key":24,"text":601,"correct":32},"变更指示并非只能由监理人发出",{"key":27,"text":603,"correct":22},"监理人应按照合同约定和合同当事人商定或确定变更价格",{"key":30,"text":605,"correct":22},"承包人收到监理人按合同约定发出的文件，经检查认为其中存在对发包人要求变更情形的，可向监理人提出书面变更建议",{"key":34,"text":607,"correct":22},"承包人收到监理人的变更意向书后认为难以实施此项变更的，应立即通知监理人，说明原因并附详细依据",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":97,"analysis":37},982039,"勘察设计过程中合同跟踪与监督管理的对象包括()。",[612,614,616,618,620],{"key":20,"text":613,"correct":32},"勘察设计任务书",{"key":24,"text":615,"correct":22},"勘察设计工作的质量",{"key":27,"text":617,"correct":22},"勘察设计工作量",{"key":30,"text":619,"correct":22},"勘察设计进度",{"key":34,"text":621,"correct":22},"项目的设计概算",{"id":623,"libraryId":5,"type":15,"typeLabel":16,"stem":624,"options":625,"answer":636,"analysis":37},982040,"下列关于建设工程勘察设计合同文本的说法，正确的有()。",[626,628,630,632,634],{"key":20,"text":627,"correct":32},"《建设工程勘察合同示范文本（一）》适用于岩土工程设计",{"key":24,"text":629,"correct":32},"《建设工程勘察合同示范文本（二）》适用于岩土工程勘察",{"key":27,"text":631,"correct":22},"专用合同条款的编号应与相应的通用合同条款的编号一致",{"key":30,"text":633,"correct":22},"合同协议书集中约定了合同当事人基本的合同权利义务",{"key":34,"text":635,"correct":22},"建设工程设计合同示范文本包括合同协议书、通用合同条款和专用合同条款三部分","CDE",{"id":638,"libraryId":5,"type":15,"typeLabel":16,"stem":639,"options":640,"answer":52,"analysis":37},982041,"下列关于设计计划编制的说法中，正确的有()。",[641,643,645,647,649],{"key":20,"text":642,"correct":22},"设计计划应在项目初始阶段由设计经理负责组织编制，经承包人有关职能部门评审后，由项目经理批准实施",{"key":24,"text":644,"correct":22},"设计进度计划应符合项目总进度计划的要求",{"key":27,"text":646,"correct":22},"设计计划应满足合同约定的质量目标与要求以及相关的质量规定和标准",{"key":30,"text":648,"correct":22},"承包人需按照经批准后的计划开展设计工作",{"key":34,"text":650,"correct":32},"承包人应按照监理人要求，在合同进度计划中专门列出设计进度计划，报发包人批准后执行",{"id":652,"libraryId":5,"type":15,"typeLabel":16,"stem":653,"options":654,"answer":36,"analysis":37},982042,"下列关于发包人和勘察人的合同责任的说法中，正确的有()。",[655,657,659,661,663],{"key":20,"text":656,"correct":22},"发包人提供有关资料、文件超过规定期限15天以内，勘察人按合同规定交付报告、成果、文件的时间顺延",{"key":24,"text":658,"correct":22},"发包人提供有关资料、文件超过规定期限15天以上时，勘察人有权重新确定交付报告、成果、文件的时间",{"key":27,"text":660,"correct":22},"勘察过程中的任何变更，经办理正式变更手续后，发包人应按实际发生的工作量支付勘察费",{"key":30,"text":662,"correct":32},"发包人不按时支付勘察费或进度款，勘察人在约定支付时间15天后，向发包人发出书面催款的通知",{"key":34,"text":664,"correct":22},"由于工程停建而终止合同，勘察人完成的工作量超过50%时，发包人应支付勘察人勘察费用的100%",{"id":666,"libraryId":5,"type":15,"typeLabel":16,"stem":667,"options":668,"answer":352,"analysis":37},982043,"关于施工专业分包合同的变更管理和索赔管理，下列说法正确的有()。",[669,671,673,675,677],{"key":20,"text":670,"correct":22},"专业分包人收到总承包人发出的变更指令或经总承包人确认的发包人变更指令后，方可实施变更。未经许可，专业分包人不得擅自对工程的任何部分进行变更",{"key":24,"text":672,"correct":22},"施工专业分包合同的变更管理主要围绕变更的及时性、变更引起的费用和工期展开",{"key":27,"text":674,"correct":32},"专业分包人认为有权得到追加付款和（或）延长工期的，应在知道或应当知道索赔事件发生后15天内，向总承包人递交索赔意向通知书，并说明发生索赔事件的事由",{"key":30,"text":676,"correct":22},"总承包人认为专业分包人索赔请求合理的，且应由发包人承担赔付责任的，总承包人应及时履行施工总承包合同中的索赔义务",{"key":34,"text":678,"correct":22},"专业分包的索赔流程设置应当与总承包人向专业发包人的索赔流程予以匹配，否则总承包合同和施工专业分包合同的履行均受到影响，并导致合同履行的困难",{"id":680,"libraryId":5,"type":15,"typeLabel":16,"stem":681,"options":682,"answer":352,"analysis":37},982044,"下列属于国际咨询工程师联合会(FIDI C)发行的标准文本的组成部分的有()。",[683,685,687,689,691],{"key":20,"text":684,"correct":22},"协议书",{"key":24,"text":686,"correct":22},"通用条款",{"key":27,"text":688,"correct":32},"专用条款",{"key":30,"text":690,"correct":22},"特殊条款",{"key":34,"text":692,"correct":22},"附加条款",{"id":694,"libraryId":5,"type":15,"typeLabel":16,"stem":695,"options":696,"answer":112,"analysis":37},982045,"下列关于勘察设计收费的说法中，正确的有()。",[697,699,701,703,705],{"key":20,"text":698,"correct":32},"在合同生效后3天内，发包人应向勘察人支付勘察费的10%作为定金",{"key":24,"text":700,"correct":22},"在合同履行后，定金可抵作勘察费",{"key":27,"text":702,"correct":32},"在提交勘察成果资料后20天内，发包人应一次付清剩余的全部勘察费",{"key":30,"text":704,"correct":22},"对于后续勘察费的支付，可按实际工程进度，分多次支付工程进度款",{"key":34,"text":706,"correct":22},"勘察规模大、工期长的大型勘察工程，可按约定比例支付工程进度款",{"id":708,"libraryId":5,"type":15,"typeLabel":16,"stem":709,"options":710,"answer":721,"analysis":37},982046,"施工合同条款对竣工结算的约定应包含()等内容。",[711,713,715,717,719],{"key":20,"text":712,"correct":22},"竣工结算审核",{"key":24,"text":714,"correct":22},"竣工结算申请",{"key":27,"text":716,"correct":32},"索赔条款",{"key":30,"text":718,"correct":22},"最终结清",{"key":34,"text":720,"correct":32},"工期条款","ABD",{"id":723,"libraryId":5,"type":15,"typeLabel":16,"stem":724,"options":725,"answer":393,"analysis":37},982047,"建设工程施工合同管理的难度较大，主要体现在()等方面。",[726,728,730,732,734],{"key":20,"text":727,"correct":22},"合同管理周期较长",{"key":24,"text":729,"correct":32},"合同管理的数据多",{"key":27,"text":731,"correct":22},"涉及主体较多",{"key":30,"text":733,"correct":32},"涉及的地区多",{"key":34,"text":735,"correct":22},"不确定因素复杂多变",[737,741,744,747,750,753],{"id":738,"name":739,"category":7,"favorite":740},1,"领导干部任职前廉政法规知识测试题",92,{"id":742,"name":743,"category":7,"favorite":738},595,"建筑结构与设备",{"id":745,"name":746,"category":7,"favorite":738},715,"招标采购专业知识与法律法规",{"id":748,"name":749,"category":7,"favorite":738},848,"市政方向-通用基础",{"id":751,"name":752,"category":7,"favorite":8},534,"BIM工程师",{"id":754,"name":752,"category":7,"favorite":8},535]