[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982182":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},982182,710,2,"多选题","备货的主要内容包括()。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","检查出口货物质量、数量",true,{"key":16,"text":17,"correct":14},"B","检查出口货物包装",{"key":19,"text":20,"correct":21},"C","取得合格检验证书",false,{"key":23,"text":24,"correct":14},"D","生产或组织收购货源",{"key":26,"text":27,"correct":14},"E","在外包装上刷制运输标志和其他标志","ABDE","备货是指卖方按照出口合同的规定按时、保质保量准备好应交付的货物。主要工作内容包括安排生产或组织收购货源，检查出口货物质量、数量及包装等状况，在外包装上刷制运输标志和其他标志等。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购合同管理-(原案例分析)","建筑工程",0]