[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982150":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},982150,710,2,"多选题","新版UCP600的改动主要体现在()。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","整体结构的改动",true,{"key":16,"text":17,"correct":14},"B","条文按照业务环节的先后顺序作归纳和编排",{"key":19,"text":20,"correct":14},"C","对14个概念作了定义",{"key":22,"text":23,"correct":24},"D","修改了第2条和第3条中关于“定义”和“解释”的条款",false,{"key":26,"text":27,"correct":14},"E","在审核单据的标准和时间、单据不符的处理等方面作了修改","ABCE","新版UCP600在诸多方面对UCP500进行了修改，主要体现在：①整体结构作了改动，条文基本按业务环节的先后顺序作归纳和编排。UCP600将UCP500全部四十九条增删合并为三十九条，且不再分类。②UCP600在第2条和第3条新增“定义”和“解释”条款，分别就“通知行”、“申请人”、“银行工作日”、“受益人”、“相符交”“议付”等14个概念作出定义，并对信用证业务中的有关术语作出解释，确保《跟单信用证统一惯例》语言的清晰和准确。③UCP600还在审核单据的标准和时间、单据不符的处理、“议付”的概念、可转让信用证以及单据传递过程中的遗失责任等方面作了修改。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购合同管理-(原案例分析)","建筑工程",0]