[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982084":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},982084,710,2,"多选题","设计人向发包人提交设计人项目管理机构及人员安排的报告，其内容应包括()。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","工艺专业负责人名单",true,{"key":16,"text":17,"correct":14},"B","设备专业负责人名单",{"key":19,"text":20,"correct":14},"C","负责人注册执业资格或职称",{"key":22,"text":23,"correct":24},"D","项目负责人职业资格等级",false,{"key":26,"text":27,"correct":24},"E","项目负责人授权范围","ABC","设计人应在接到开始设计通知后7天内，向发包人提交设计人项目管理机构及人员安排的报告，其内容应包括工艺、土建、设备等专业负责人名单及其岗位、注册执业资格或职称等。DE两项属于任命项目负责人时在专用合同条款中明确的内容。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购合同管理-(原案例分析)","建筑工程",0]