[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982076":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},982076,710,2,"多选题","1999年9月，FIDIC出版了一套标准合同条件，其内容包括()。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","《施工合同条件》（新红皮书）",true,{"key":16,"text":17,"correct":14},"B","《设备与设计一建造合同》（新黄皮书）",{"key":19,"text":20,"correct":14},"C","《EPC\u002F交钥匙项目合同条件》（银皮书）",{"key":22,"text":23,"correct":24},"D","《1999版施工合同》（白皮书）",false,{"key":26,"text":27,"correct":14},"E","《简明合同格式》（绿皮书）","ABCE","1999年9月，FIDIC出版了一套4本标准合同条件，包括：①《施工合同条件》（新红皮书）；②《设备与设计一建造合同》（新黄皮书）；③《EPC\u002F交钥匙项目合同条件》（银皮书）；④《简明合同格式》（绿皮书）。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购合同管理-(原案例分析)","建筑工程",0]