[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982003":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},982003,710,2,"多选题","建构项目合同体系的核心原则包括()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","合理性",false,{"key":16,"text":17,"correct":18},"B","合法性",true,{"key":20,"text":21,"correct":14},"C","严密性",{"key":23,"text":24,"correct":18},"D","经济性",{"key":26,"text":27,"correct":18},"E","系统性","BDE","建构合同结构体系的过程是对招标项目所涉及合同的种类、阶段工作目标等进行分析，并综合考虑有效管理、成本节约等因素，对全部合同开展梳理的过程。建构项目合同体系的目的是便于后期的合同管理，其核心原则是合法性、经济性以及系统性。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购合同管理-(原案例分析)","建筑工程",0]