[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-981960":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},981960,710,1,"单选题","进行合同变更，签订新的附加协议、备忘录，通过索赔解决费用超支问题，这属于合同偏差处理的()措施。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","组织",false,{"key":16,"text":17,"correct":14},"B","技术",{"key":19,"text":20,"correct":14},"C","经济",{"key":22,"text":23,"correct":24},"D","合同",true,"根据合同实施情况偏差分析的结果，合同当事人应采取相应的调整措施。调整措施可分为：①组织措施，如增加人员投入，重新进行计划或调整计划，派遣得力的管理人员；②技术措施，如变更技术方案，采用新的更高效率的施工方案；③经济措施，如增加资金投入、对工作人员进行经济激励等；④合同措施，如进行合同变更，签订新的附加协议、备忘录，通过索赔解决费用超支问题等。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购合同管理-(原案例分析)","建筑工程",0]