[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-981784":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},981784,710,1,"单选题","关于装运时间的规定方式，下列说法错误的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","明确规定装运时间",false,{"key":16,"text":17,"correct":18},"B","规定收到信用证后一定时间内装运，这种规定方式应用较广",true,{"key":20,"text":21,"correct":14},"C","笼统规定近期装运",{"key":23,"text":24,"correct":14},"D","装运时间是买卖合同的主要交易条件，条款应具体明确，并注意船货衔接问题，以免造成有货无船或有船无货的情况发生","装运时间是买卖合同的主要交易条件，条款应具体明确，并注意船货衔接问题，以免造成有货无船或有船无货的情况发生。装运时间通常有以下几种规定方式：①明确规定装运时间；②规定收到信用证后一定时间内装运；③笼统规定近期装运。其中明确规定装运时间这种方式应用较广。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购合同管理-(原案例分析)","建筑工程",0]