[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-981772":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},981772,710,1,"单选题","在成本加保险费、运费CIF中，卖方需要承担的费用不包括()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","办理出口手续时所应交纳的关税",false,{"key":16,"text":17,"correct":18},"B","办理进口手续时所应交纳的关税",true,{"key":20,"text":21,"correct":14},"C","从装运港到目的港的运费",{"key":23,"text":24,"correct":14},"D","办理水上运输保险的费用","B项，采用CIF术语时，买方承担交货后所涉及的各项费用，包括办理进口手续时所应交纳的关税和其他费用。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购合同管理-(原案例分析)","建筑工程",0]