[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-981756":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},981756,710,1,"单选题","某货物价格为218万欧元，卖方负责将货物从莫斯科运达北京指定地点交货，并负责支付相关进口税费。货物交付买方后风险转移给买方。该国际贸易价格术语应表示为()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","218万欧元FCA莫斯科",false,{"key":16,"text":17,"correct":14},"B","218万欧元CFR北京",{"key":19,"text":20,"correct":14},"C","218万欧元CIP北京",{"key":22,"text":23,"correct":24},"D","218万欧元DDP北京",true,"采用DDP术语时，卖方在合同规定的时间在进口国（地区）境内的指定地点将货物交给买方处置时，完成交货。卖方在进口国内的交货地点完成交货时，风险由卖方转移给买方。卖方承担在进口国内的指定地点完成交货之前的一切费用，包括办理货物出口和进口所涉及的关税和其他费用。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购合同管理-(原案例分析)","建筑工程",0]