[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-981752":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},981752,710,1,"单选题","下列关于国际货物买卖合同的作价方法的描述，错误的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","若采用固定价格，合同价格一经买卖合同双方协商确定，任何一方不得擅自更改",false,{"key":16,"text":17,"correct":18},"B","非固定价格采用最为普遍",true,{"key":20,"text":21,"correct":14},"C","对于长期、分批交货合同，双方可约定近期交货部分采用固定价格，其余采用不固定价格",{"key":23,"text":24,"correct":14},"D","国际货物买卖合同的作价方法主要有固定价格、非固定价格以及部分固定、部分不固定等","国际货物买卖合同的作价方法主要有：①固定价格；②非固定价格；③部分固定、部分不固定价格。其中，固定价格指的是合同价格一经买卖双方协商确定，任何一方不得擅自修改，固定价格采用最为普遍。对于长期、分批交货合同，双方可约定近期交货部分采用固定价格，其余采用不固定价格。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购合同管理-(原案例分析)","建筑工程",0]