[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-981747":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},981747,710,1,"单选题","采用()术语时，卖方在合同中约定的时间和地点，将合同中规定的货物交给卖方自己指定的承运人或第一承运人，完成交货。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","CIP",true,{"key":16,"text":17,"correct":18},"B","DDP",false,{"key":20,"text":21,"correct":18},"C","CIF",{"key":23,"text":24,"correct":18},"D","FOB","采用CIP术语时，卖方在合同中约定的时间和地点，将合同中规定的货物交给卖方自己指定的承运人或第一承运人，完成交货。B项，采用DDP术语时，卖方在合同规定的时间在进口国（地区）境内的指定地点将货物交给买方处置时，完成交货；C项，采用CIF术语时，卖方在双方约定的时间和装运港，将合同规定的货物交到卖方自己所派船只的船上，完成交货；D项，采用FOB术语时，卖方在合同中约定的时间和装运港，将合同规定的货物交到买方指派的船上，完成交货，并及时通知买方。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购合同管理-(原案例分析)","建筑工程",0]