[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-981700":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},981700,710,1,"单选题","关于计量的具体程序和具体内容，下列说法错误的是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","计量约定的周期，应当考虑报送日期与截至日期的间距，否则无法实施",false,{"key":16,"text":17,"correct":14},"B","支付条款是施工合同中最为重要的条款之一，施工合同中的支付包括预付款、进度款和竣工结算价款的支付",{"key":19,"text":20,"correct":21},"C","总价合同采用支付分解表计量支付的，必须按照合同约定进行计量",true,{"key":23,"text":24,"correct":14},"D","监理人对工程量有异议的，有权要求承包人进行共同复核或抽样复测","C项，总价合同采用支付分解表计量支付的，可以按照合同约定进行计量，也可以不计量，但是支付按约定执行即可。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购合同管理-(原案例分析)","建筑工程",0]