[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-981680":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},981680,710,1,"单选题","发包人在与承包人签订建设工程施工合同前应确保完成的事项不包括()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工程项目的全部设计已经批准",true,{"key":16,"text":17,"correct":18},"B","工程项目已经列入年度建设计划",false,{"key":20,"text":21,"correct":18},"C","标发包工程，已经完成招投标程序且已经确定中标人",{"key":23,"text":24,"correct":18},"D","建设资金和主要建筑材料设备来源已经落实","通常而言，发包人在与承包人签订建设工程施工合同前应确保完成以下事项：①工程项目的初步设计已经批准；②工程项目已经列入年度建设计划；③有能够满足施工需要的设计文件和有关技术资料；④建设资金和主要建筑材料设备来源已经落实；⑤招标发包工程，已经完成招投标程序且已经确定中标人。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购合同管理-(原案例分析)","建筑工程",0]