[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-981644":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},981644,710,1,"单选题","关于基准日的确定，下列说法错误的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","对于招标发包的工程，通常规定基准日期为投标截止日期前第28天",false,{"key":16,"text":17,"correct":18},"B","对于招标发包的工程，通常规定基准日期为合同签订前第28天",true,{"key":20,"text":21,"correct":14},"C","直接发包的工程.基准日期为合同签订前第28天",{"key":23,"text":24,"correct":14},"D","基准日的确定综合考虑了招标投标的具体活动或订约前谈判协商的时间","对于招标发包的工程，通常规定基准日期为投标截止日期前第28天，直接发包的工程，基准日期为合同签订前第28天。该日期的确定综合考虑了招标投标的具体活动或订约前谈判协商的时间。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购合同管理-(原案例分析)","建筑工程",0]