[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-981627":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},981627,710,1,"单选题","除在专用合同条款另有约定外，总承包人应在签发进度款支付证书或临时进度款支付证书后()天内完成支付。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","5",false,{"key":16,"text":17,"correct":18},"B","7",true,{"key":20,"text":21,"correct":14},"C","10",{"key":23,"text":24,"correct":14},"D","15","除在专用合同条款另有约定外，总承包人应在签发进度款支付证书或临时进度款支付证书后7天内完成支付，总承包人逾期支付进度款的，应按照中国人民银行发布的同期同类贷款基准利率支付违约金。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购合同管理-(原案例分析)","建筑工程",0]