[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-981603":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},981603,710,1,"单选题","里程碑计划以()为基础和前提。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","初步合同规划",false,{"key":16,"text":17,"correct":18},"B","合同分解",true,{"key":20,"text":21,"correct":14},"C","确定最小合同单元",{"key":23,"text":24,"correct":14},"D","确定招标合同单元","里程碑计划是以工程建设项目或政府采购活动中某些重要事件的开始或完成作为节点所编制的计划，以中间可实现的成果为依据。里程碑计划显示了项目为达到最终目标而必须经过的条件或状态序列，描述了项目每一阶段应达到的状态。里程碑计划可以用于表达项目合同订立顺序的计划安排，里程碑计划以合同分解为基础相前提，同时也可以作为表达合同结构分解的方法。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购合同管理-(原案例分析)","建筑工程",0]