[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-709-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":614},{"id":5,"name":6,"category":7,"favorite":8},709,"岩土专业知识","建筑工程",0,5,50,1370,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,189,201,213,223,235,247,259,271,283,295,307,319,331,343,355,367,379,391,403,415,425,437,448,460,472,484,495,506,518,530,542,554,566,578,590,602],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},980366,1,"单选题","根据港口工程特点，对不计波浪力的建筑物在验算地基竖向承载力时，其水位采用（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","极端低水位",true,{"key":24,"text":25,"correct":26},"B","极端高水位",false,{"key":28,"text":29,"correct":26},"C","平均低水位",{"key":31,"text":32,"correct":26},"D","平均高水位","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},980367,"十字板剪切试验点的布置，对均质土竖向间距可为（ ）m，对非均质或夹薄层粉细砂的软黏性土，宜先作静力触探，结合土层变化，选择软黏土进行试验。",[38,40,42,44],{"key":20,"text":39,"correct":22},"1",{"key":24,"text":41,"correct":26},"2",{"key":28,"text":43,"correct":26},"3",{"key":31,"text":45,"correct":26},"4",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},980368,"下列选项中哪种取土器最适用于在软塑黏性土中采取I级土试样？（ ）",[50,52,54,56],{"key":20,"text":51,"correct":22},"固定活塞薄壁取土器",{"key":24,"text":53,"correct":26},"自由活塞薄壁取土器",{"key":28,"text":55,"correct":26},"单动三重管回转取土器",{"key":31,"text":57,"correct":26},"双动三重管回转取土器",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},980369,"根据下列描述判断，哪一选项的土体属于残积土？（ ）",[62,64,66,68],{"key":20,"text":63,"correct":26},"原始沉积的未经搬运的土体",{"key":24,"text":65,"correct":22},"岩石风化成土状留在原地的土体",{"key":28,"text":67,"correct":26},"经搬运沉积后保留原基本特征，且夹砂、砾、黏土的土体",{"key":31,"text":69,"correct":26},"岩石风化成土状经冲刷或崩塌在坡底沉积的土体",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},980370,"某工程进行初步勘察时，在地表露头测得岩体压缩波速度为2. 6km\u002Fs，岩块压缩速度为3.8km\u002Fs，岩石点荷载强度指数为2. 4，该岩体的基本质量级别为（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"I 级",{"key":24,"text":77,"correct":26},"II级",{"key":28,"text":79,"correct":26},"III级",{"key":31,"text":81,"correct":22},"IV级",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},980371,"在下列关于泥石流扇与洪积扇的区别的表述中，哪个选项是不正确的？（ ）",[86,88,90,92],{"key":20,"text":87,"correct":26},"泥石流扇堆积物无分选，而洪积扇堆积物有一定的分选",{"key":24,"text":89,"correct":22},"泥石流扇堆积物有层次，而洪积扇堆积物无层次",{"key":28,"text":91,"correct":26},"泥石流扇堆积物的石块具有棱角，而洪积扇堆积物碎屑有一定的磨圆度",{"key":31,"text":93,"correct":26},"泥石流扇堆积物的工程性质差异大，而洪积扇堆积物的工程性质相对差异较小",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},980372,"某场地地表水体水深3.0m，其下粉质黏土层厚度7.0m，粉质黏土层下为砂卵石层，承压水头12. 0m。则粉质黏土层单位渗透力大小最接近下列哪个选项？（ ）",[98,100,102,104],{"key":20,"text":99,"correct":22},"12. 86kN\u002Fm3",{"key":24,"text":101,"correct":26},"4. 29kN\u002Fm3",{"key":28,"text":103,"correct":26},"7. 14kN\u002Fm3",{"key":31,"text":105,"correct":26},"10.00kN\u002Fm3",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},980373,"十字板剪切试验测得的抗剪强度相当于实验室采用（ ）试验方法测得的抗剪强度。",[110,112,114,116],{"key":20,"text":111,"correct":22},"不固结不排水试验",{"key":24,"text":113,"correct":26},"固结不排水试验",{"key":28,"text":115,"correct":26},"固结排水试验",{"key":31,"text":117,"correct":26},"直剪试验",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},980374,"某厂房（单层、无行车、柱下条形基础）地基经勘察：浅表“硬壳层”厚约l.0~2.0m；其下为淤泥质土，层厚有变化。平均厚约15.0m;淤泥质土层下分布可塑粉质黏土，工程性质较好。采用水泥搅拌桩处理后，墙体因地基不均匀沉降产生裂缝，且有不断发展趋势。现拟比选地基再加固处理措施，下述哪个选项最为有效？（ ）",[122,124,126,128],{"key":20,"text":123,"correct":26},"压密注浆法",{"key":24,"text":125,"correct":26},"CFG桩法",{"key":28,"text":127,"correct":22},"树根桩法",{"key":31,"text":129,"correct":26},"锚杆静压粧法",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},980375,"某堆场，浅表“硬壳层”黏土厚度1.0 ~2.0m，其下分布厚约15.0m淤泥，淤泥层下为可塑~硬塑粉质黏土和中密~密实粉细砂层。采用大面积堆载预压法处理，设置塑料排水带，间距0.8m左右，其上直接堆填黏性土夹块石、碎石，堆填高度约4. 50m，堆载近两年。卸载后进行检验，发现预压效果很不明显。造成其预压效果不好最主要的原因是下列哪个选项？（ ）",[134,136,138,140],{"key":20,"text":135,"correct":26},"预压荷载小，预压时间短",{"key":24,"text":137,"correct":26},"塑料排小带间距偏大",{"key":28,"text":139,"correct":26},"直接堆填，未铺设砂垫层，导致排水不畅",{"key":31,"text":141,"correct":22},"该场地不适用堆载预压法",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},980376,"关于砂石桩施工顺序，下列哪一选项是错误的？（ ）",[146,148,150,152],{"key":20,"text":147,"correct":26},"黏性土地基，从一侧向另一侧隔排进行",{"key":24,"text":149,"correct":22},"砂土地基，从中间向外围进行",{"key":28,"text":151,"correct":26},"黏性土地基，从中间向外围进行",{"key":31,"text":153,"correct":26},"临近既有建筑物，应自既有建筑物一侧向外进行",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},980377,"作为换填垫层法的土垫层的压实标准，压实系数λc的定义为下列哪一选项？（ ）",[158,160,162,164],{"key":20,"text":159,"correct":26},"土的最大干密度与天然干密度之比",{"key":24,"text":161,"correct":22},"土的控制干密度与最大干密度之比",{"key":28,"text":163,"correct":26},"土的天然干密度与最小干密度之比",{"key":31,"text":165,"correct":26},"土的最小干密度与控制干密度之比",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},980378,"采用真空预压加固软土地基时，在真空管路中设置止回阀的主要作用是以下哪个选项? ( )",[170,172,174,176],{"key":20,"text":171,"correct":22},"防止地表水从管路中渗入软土地基中",{"key":24,"text":173,"correct":26},"减小真空泵运行时间，以节省电费",{"key":28,"text":175,"correct":26},"避免真空泵停泵后膜内真空度过快降低",{"key":31,"text":177,"correct":26},"维持膜下真空度的稳定，提高预压效果",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},980379,"在地基处理方案比选时，对揽拌桩复合地基，初步设计采用的桩土应力比取以下哪个数值较合适？（ ）",[182,183,185,187],{"key":20,"text":43,"correct":22},{"key":24,"text":184,"correct":26},"10",{"key":28,"text":186,"correct":26},"30",{"key":31,"text":188,"correct":26},"50",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":31,"analysis":33},980380,"CFG桩施工采用长螺旋成孔、管内泵压混合料成桩时，坍落度宜控制在下列哪一选项的范围内？（ ）",[193,195,197,199],{"key":20,"text":194,"correct":26},"50 ~ 80mm",{"key":24,"text":196,"correct":26},"80~120mm",{"key":28,"text":198,"correct":26},"120 ~ 160mm",{"key":31,"text":200,"correct":22},"160 ~200mm",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":28,"analysis":33},980381,"预压法加固地基设计时，在其他条件不变的情况下，以下哪个选项的参数对地基固结速度影响最小？（ ）",[205,207,209,211],{"key":20,"text":206,"correct":26},"砂井直径的大小",{"key":24,"text":208,"correct":26},"排水板的间距",{"key":28,"text":210,"correct":22},"排水砂垫层的厚度",{"key":31,"text":212,"correct":26},"拟加固土体的渗透系数",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":24,"analysis":33},980382,"灰土换填垫层在灰土夯压密实后应保证多长时间内不得受水浸泡( ）天。",[217,218,219,221],{"key":20,"text":39,"correct":26},{"key":24,"text":43,"correct":22},{"key":28,"text":220,"correct":26},"7",{"key":31,"text":222,"correct":26},"28",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":20,"analysis":33},980383,"经处理后的地基当按地基承载力确定基础底面积及埋深而需对地基承载力特征值进行修正时，下列（ ）不符合《建筑地基处理技术规范》(JGJ 79—2002)的规定。",[227,229,231,233],{"key":20,"text":228,"correct":22},"对水泥土桩复合地基应根据修正前的复合地基承载力特征值进行桩身强度验算",{"key":24,"text":230,"correct":26},"基础宽度的地基承载力修正系数应取0",{"key":28,"text":232,"correct":26},"基础深度的地基承载力修正系数应取1",{"key":31,"text":234,"correct":26},"经处理后的地基当在受力层范围内仍存在软弱下卧层时，尚应验算下卧层的地基承载力",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":24,"analysis":33},980384,"按《建筑地基处理技术规范》（JGJ 79—2002）下列关于单桩或多桩复合地基载荷试验承压板面积的说法中，下列（ ）选项是正确的。",[239,241,243,245],{"key":20,"text":240,"correct":26},"载荷板面积必须大于单桩或实际桩数所承担的处理面积",{"key":24,"text":242,"correct":22},"载荷板面积应等于单桩或实际桩数所承担的处理面积",{"key":28,"text":244,"correct":26},"载荷板面积应小于单桩或实际桩数所承担的处理面积",{"key":31,"text":246,"correct":26},"以上均不正确",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":28,"analysis":33},980385,"采用单液硅化法加固湿陷性黄土地基时，其压力灌注的施工工艺不适宜下列（ ）选 项中的场地地基。",[251,253,255,257],{"key":20,"text":252,"correct":26},"非自重湿陷性黄土场地的设备基础和构筑物基础",{"key":24,"text":254,"correct":26},"非自重湿陷性黄土场地中即有建筑物和设备基础的地基",{"key":28,"text":256,"correct":22},"自重湿陷性黄土场地中即有建筑物地基和设备基础地基",{"key":31,"text":258,"correct":26},"自重湿陷性黄土场地中拟建的设备基础和构筑物地基",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":20,"analysis":33},980386,"某场地为黏性土地基，采用砂石桩进行处理，砂石桩直径d为0.5m，面积置换率m为 0. 25，则一根砂石桩承担的处理面积为（ ）m2。",[263,265,267,269],{"key":20,"text":264,"correct":22},"0.785",{"key":24,"text":266,"correct":26},"0. 795",{"key":28,"text":268,"correct":26},"0.805",{"key":31,"text":270,"correct":26},"0.815",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":28,"analysis":33},980387,"甲、乙两软黏土地基土层分布如图5-1所示，甲地基软黏土厚度h1为8.0m，乙地基软黏土层厚度h2为6. 0m,两地基土层物理力学指标相同当甲地基预压240天时地基固结度达0.8，问乙地基需要预压（ ）天地基固结度也可达到0. 8。",[275,277,279,281],{"key":20,"text":276,"correct":26},"175",{"key":24,"text":278,"correct":26},"155",{"key":28,"text":280,"correct":22},"135",{"key":31,"text":282,"correct":26},"115",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":28,"analysis":33},980388,"采用堆载预压法加固软土地基时，排水竖井宜穿透受压软土层，对软土层深厚竖井很深的情况应考虑井阻影响，问井阻影响程度与下列（ ）选项无关。",[287,289,291,293],{"key":20,"text":288,"correct":26},"竖井纵向通水量",{"key":24,"text":290,"correct":26},"竖井深度",{"key":28,"text":292,"correct":22},"竖井顶面排水砂垫层厚度",{"key":31,"text":294,"correct":26},"受压软土层水平向渗透系数",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":20,"analysis":33},980389,"某中砂换填垫层的性质参数为天然孔隙比e0=0.7，最大干密度ρdmax=1.8g\u002Fcm3，现场检测的控制干密度ρd= 1.7g\u002Fcm3，试问该换填垫层的压实系数λc约等于下列（ ）选项的值。",[299,301,303,305],{"key":20,"text":300,"correct":22},"0.94",{"key":24,"text":302,"correct":26},"0.89",{"key":28,"text":304,"correct":26},"0.85",{"key":31,"text":306,"correct":26},"0. 80",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":31,"analysis":33},980390,"某场地软弱土层厚20m，采用水泥土粧进行地基加固，初步方案为面积置换率m= 0.2，桩径d=0.5m，桩长l= 10m，水泥掺合量取18%，经计算后沉降约20cm，为将工后沉降控制在15cm以内，需对初步方案进行修改，问下列（ ）选项最有效。",[311,313,315,317],{"key":20,"text":312,"correct":26},"提高面积置换率m",{"key":24,"text":314,"correct":26},"提高水泥掺合量",{"key":28,"text":316,"correct":26},"增加桩径d",{"key":31,"text":318,"correct":22},"增加桩长l",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":28,"analysis":33},980391,"地基为松散砂土，采用砂石桩挤密法处理，天然孔隙比e0=0.78,要求挤密后孔隙比达到0.68，砂石桩直径d=0.5m，不考虑振动下沉密实作用，按等边三角形布桩，桩间距宜为（）。",[323,325,327,329],{"key":20,"text":324,"correct":26},"1. 0",{"key":24,"text":326,"correct":26},"1.5",{"key":28,"text":328,"correct":22},"2.0",{"key":31,"text":330,"correct":26},"2. 5",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":20,"analysis":33},980392,"下列地基中（ ）不是复合地基。",[335,337,339,341],{"key":20,"text":336,"correct":22},"由桩端位于不可压缩层的刚性桩体与桩间土共同组成的地基",{"key":24,"text":338,"correct":26},"由桩端位于可压缩层的刚性桩体与桩间土共同组成的地基",{"key":28,"text":340,"correct":26},"由桩端位于不可压缩层的柔性桩与桩间土共同组成的地基",{"key":31,"text":342,"correct":26},"由桩端位于可压缩层t的柔性粧与桩间土共同组成的地基",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":28,"analysis":33},980393,"下列关于预压法处理软土地基的说法中，（ ）是不正确的。",[347,349,351,353],{"key":20,"text":348,"correct":26},"控制加载速率的主要目的是防止地基失隐",{"key":24,"text":350,"correct":26},"采用超载预压法的主要目的是减少地基使用期间的沉降",{"key":28,"text":352,"correct":22},"当夹有较充足水源补给的透水层时，宜采用真空预压法",{"key":31,"text":354,"correct":26},"在某些条件下也可用构筑物的自重进行堆载预压",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":28,"analysis":33},980394,"关于强夯法的设计与施工的说法中，不正确的是（ ）。",[359,361,363,365],{"key":20,"text":360,"correct":26},"处理范围应大于建筑物或构筑物基础的范围",{"key":24,"text":362,"correct":26},"夯击遍数除与地基条件和工程使用要求有关外，也与每一遍的夯击击数有关",{"key":28,"text":364,"correct":22},"两遍夯击间的时间间隔主要取决于夯击点的间距",{"key":31,"text":366,"correct":26},"有效加固深度不仅与锤重落距夯击次数有关，还与地基土质地下水位及夯锤底面积有关",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":28,"analysis":33},980395,"进行岩石铺杆抗拔试验时，出现下列情况（ ）时虽可终止上拔试验，但不能把前一级荷载作为极限抗拔承载力。",[371,373,375,377],{"key":20,"text":372,"correct":26},"锚杆拔升量持续增加且1小时内来出现稳定迹象",{"key":24,"text":374,"correct":26},"新增加的上拔力无法施加或施加后无法保持稳定",{"key":28,"text":376,"correct":22},"上拔力已达到试验设备的最大加载量",{"key":31,"text":378,"correct":26},"锚杆钢筋已被拉断或已被拔出",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":24,"analysis":33},980396,"重力式挡土墙上应设置泄水孔及反滤层，下列（ ）不是设置的目的。",[383,385,387,389],{"key":20,"text":384,"correct":26},"使泄水孔不被堵塞",{"key":24,"text":386,"correct":22},"墙后土的细颗粒不被带走",{"key":28,"text":388,"correct":26},"防止墙后产生静水压力",{"key":31,"text":390,"correct":26},"防止墙后产生动水压力",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":20,"analysis":33},980397,"下列不属于化学加固法的是（ ）。",[395,397,399,401],{"key":20,"text":396,"correct":22},"电掺法",{"key":24,"text":398,"correct":26},"粉喷桩法",{"key":28,"text":400,"correct":26},"深层水泥搅拌桩法",{"key":31,"text":402,"correct":26},"高压喷射注浆法",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":31,"analysis":33},980398,"对于松砂地基不适用的加固法是（ ）。",[407,409,411,413],{"key":20,"text":408,"correct":26},"强夯法",{"key":24,"text":410,"correct":26},"预压法",{"key":28,"text":412,"correct":26},"挤密碎石桩法",{"key":31,"text":414,"correct":22},"真空预压法",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":20,"analysis":33},980399,"在进行地基处理时，淤泥和淤泥质土的浅层处理宜采用（ ）。",[419,421,422,423],{"key":20,"text":420,"correct":22},"换填法",{"key":24,"text":410,"correct":26},{"key":28,"text":408,"correct":26},{"key":31,"text":424,"correct":26},"深层搅拌法",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":28,"analysis":33},980400,"预压法适用于处理（ ）地基。",[429,431,433,435],{"key":20,"text":430,"correct":26},"碎石类土和砂土",{"key":24,"text":432,"correct":26},"湿陷性黄土",{"key":28,"text":434,"correct":22},"淤泥、淤泥质土和冲填土",{"key":31,"text":436,"correct":26},"饱和的粉土",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":28,"analysis":33},980401,"强夯法不适用于（ ）地基土。",[441,443,445,447],{"key":20,"text":442,"correct":26},"松散砂土",{"key":24,"text":444,"correct":26},"杂填土",{"key":28,"text":446,"correct":22},"饱和软黏土",{"key":31,"text":432,"correct":26},{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":20,"analysis":33},980402,"确定砂井深度可不考虑的因素是（ ）。",[452,454,456,458],{"key":20,"text":453,"correct":22},"砂井的间距",{"key":24,"text":455,"correct":26},"地基土最危险滑移面",{"key":28,"text":457,"correct":26},"建筑物对沉降量的要求",{"key":31,"text":459,"correct":26},"压缩土层的厚度",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":20,"analysis":33},980403,"在CFG桩法中褥垫层的作用不是（ ）。",[464,466,468,470],{"key":20,"text":465,"correct":22},"利于排水",{"key":24,"text":467,"correct":26},"调整桩、土竖向和水平荷载分担比",{"key":28,"text":469,"correct":26},"抗震，减震",{"key":31,"text":471,"correct":26},"保证桩、土共同承担荷载",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":24,"analysis":33},980404,"城市中心区拟建一多层住宅楼，地基土为饱和软黏土（淤泥质土不排水抗剪强度指标Cu = 10kPa),其承载力不能满足设计要求，下列（ ）地基处理方案比较适宜。",[476,478,480,482],{"key":20,"text":477,"correct":26},"强夯",{"key":24,"text":479,"correct":22},"深层水泥搅拌桩",{"key":28,"text":481,"correct":26},"降水预压砂井排水固结",{"key":31,"text":483,"correct":26},"砂桩挤密",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":28,"analysis":33},980405,"预压法分为加载预压法和真空预压法两类，适于处理（ ）。",[488,489,491,493],{"key":20,"text":432,"correct":26},{"key":24,"text":490,"correct":26},"非饱和黏性土",{"key":28,"text":492,"correct":22},"淤泥质土",{"key":31,"text":494,"correct":26},"砂土",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":28,"analysis":33},980406,"振冲密实法适用的主要土质是（ ）。",[499,501,503,505],{"key":20,"text":500,"correct":26},"粉土",{"key":24,"text":502,"correct":26},"人工填土",{"key":28,"text":504,"correct":22},"砂类土",{"key":31,"text":432,"correct":26},{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":28,"analysis":33},980407,"下列一系列地基处理方法中处理湿陷性黄土较理想的是（ ）。",[510,512,514,516],{"key":20,"text":511,"correct":26},"换填法、强夯法、砂桩法",{"key":24,"text":513,"correct":26},"灰土桩法、振冲法、换填法",{"key":28,"text":515,"correct":22},"灰土桩法、预浸水法、重锤夯实法",{"key":31,"text":517,"correct":26},"换填法、灰土桩法、粉喷桩法",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":28,"analysis":33},980408,"换土垫层法在处理浅层软弱地基时，垫层厚度应符合的要求为（ ）。",[522,524,526,528],{"key":20,"text":523,"correct":26},"垫层底面处土的自重压力与附加压力之和不大于同一标高处软弱土层经宽度修正后的承载力特征值",{"key":24,"text":525,"correct":26},"垫层底面处土的自重压力不大于同一标高处软弱土层经宽度修正后的承载力特征值",{"key":28,"text":527,"correct":22},"垫层底面处土的自重压力与附加压力之和不大于同一标高处软弱土层经深度修正后的承载力特征值",{"key":31,"text":529,"correct":26},"垫层底面处土的附加应力不大于同一标高处软弱土层经宽度、深度修正后的承载力特征值",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":20,"analysis":33},980409,"在采用水泥土搅拌法加固地基时，下列符合《建筑地基处理技术规范》（JGJ 79—2002）的规定的是（ ）。",[534,536,538,540],{"key":20,"text":535,"correct":22},"对竖向承载时的水泥土试块抗压强度取90d龄期平均值，对承受水平荷载的水泥土取28d龄期平均值",{"key":24,"text":537,"correct":26},"对竖向承载时的水泥土试块抗压强度取90d龄期平均值，对承受水平荷载的水泥土取45d龄期平均值",{"key":28,"text":539,"correct":26},"对承受竖向荷载时的水泥土试块抗压强度取28d龄期平均值",{"key":31,"text":541,"correct":26},"对承受竖向荷载时的水泥土试块抗压强度取90d龄期平均值，对承受水平荷载的水泥土取60d龄期平均值",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":20,"analysis":33},980410,"下列地基中，可用振冲置换法处理的是（ ）。",[546,548,550,552],{"key":20,"text":547,"correct":22},"不排水抗剪强度较低的饱和黏性土",{"key":24,"text":549,"correct":26},"松散的砂土",{"key":28,"text":551,"correct":26},"中密的砂土",{"key":31,"text":553,"correct":26},"密实砂土",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":24,"analysis":33},980411,"采用强夯处理软土地基时，相邻两次夯击便应保持一定的间歇时间。一般来说，夯击能量越大，间歇时间（ ）。",[558,560,562,564],{"key":20,"text":559,"correct":26},"越短",{"key":24,"text":561,"correct":22},"黏性土较长",{"key":28,"text":563,"correct":26},"砂性土较长",{"key":31,"text":565,"correct":26},"黏性土较短",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":20,"analysis":33},980412,"有下列土层组成的地基： I.人工杂填土和素填土 II.低饱和度的粉土和黏性土 III.湿陷性黄土 IV.淤泥质土 v.膨胀土 比较适合采用强夯处理的地基有（ ）。",[570,572,574,576],{"key":20,"text":571,"correct":22},"I、II、III",{"key":24,"text":573,"correct":26},"II、III、IV",{"key":28,"text":575,"correct":26},"III、IV、V",{"key":31,"text":577,"correct":26},"V、III",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":28,"analysis":33},980413,"关于灰土挤密桩法和土挤密桩法，下列说法错误的是（ ）。",[582,584,586,588],{"key":20,"text":583,"correct":26},"灰土挤密桩和土挤密桩用于消除地下水位以上湿陷性黄土的湿陷性是有效果的",{"key":24,"text":585,"correct":26},"灰土挤密桩和土挤密桩用于提高地下水位以上素填土、杂填土的承载力是有效果的",{"key":28,"text":587,"correct":22},"灰土挤密桩用于消除土的湿陷性和减小渗透性方面比土挤密桩效果好的多",{"key":31,"text":589,"correct":26},"灰土挤密桩和土挤密桩不适用于处理毛细饱和带土层",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":28,"analysis":33},980414,"石灰桩复合地基承载力特征值应通过单桩或多桩复合地基载荷试验确定，初步设计时，也可按fspk =mfpk+(1 -m)fsk式估算，这时石灰桩身强度可取（ ）kPa。",[594,596,598,600],{"key":20,"text":595,"correct":26},"200 ~300",{"key":24,"text":597,"correct":26},"250~400",{"key":28,"text":599,"correct":22},"350~500",{"key":31,"text":601,"correct":26},"400~550",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":31,"analysis":33},980415,"在下列地基处理方法中，不属于复合地基的加固原理的是（ ）。",[606,608,610,612],{"key":20,"text":607,"correct":26},"土工聚合物",{"key":24,"text":609,"correct":26},"钢筋混凝土疏桩法",{"key":28,"text":611,"correct":26},"钢渣桩法",{"key":31,"text":613,"correct":22},"排水固结法",[615,618,621,624,627,630],{"id":15,"name":616,"category":7,"favorite":617},"领导干部任职前廉政法规知识测试题",92,{"id":619,"name":620,"category":7,"favorite":15},595,"建筑结构与设备",{"id":622,"name":623,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":625,"name":626,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":628,"name":629,"category":7,"favorite":8},534,"BIM工程师",{"id":631,"name":629,"category":7,"favorite":8},535]