[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-709-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":616},{"id":5,"name":6,"category":7,"favorite":8},709,"岩土专业知识","建筑工程",0,3,50,1370,[13,34,46,58,70,82,94,106,117,129,141,153,165,177,189,201,213,225,237,248,260,272,284,296,308,320,332,344,356,368,380,392,404,416,428,440,452,464,476,488,499,511,523,535,547,559,571,580,592,604],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},980264,1,"单选题","湿陷性黄土详细勘察时，取样勘探点不得少于总勘探点的（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","2\u002F3",true,{"key":24,"text":25,"correct":26},"B","1\u002F2",false,{"key":28,"text":29,"correct":26},"C","1\u002F3",{"key":31,"text":32,"correct":26},"D","1\u002F4","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},980265,"根据《岩土工程勘察规范》（GB 50021—2001) (2009年版），符合标准贯入试验设备及技术要求的一项是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"贯入器管靴长度不超过76mm",{"key":24,"text":41,"correct":26},"钻孔孔底残土厚度不应大于15cm",{"key":28,"text":43,"correct":26},"标准贯入试验孔在地下水位以上，应干钻，避免地下水对土浸泡",{"key":31,"text":45,"correct":26},"贯入器放入孔底开始贯入后，应及时地记录每打10cm的锤击数，累计打入30cm的锤击数为标准贯入试验锤击数N",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":28,"analysis":33},980266,"根据《岩土工程勘察规范》(GB50021-2001)（2009年版），不符合静力触探试验技术要求的是（）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"传感器（探头）应连同仪器等定期标定，现场试验归零误差不大于3%",{"key":24,"text":53,"correct":26},"深度记录误差不大于触探深度的1%",{"key":28,"text":55,"correct":22},"贯入深度不应超过30m，以防断杆",{"key":31,"text":57,"correct":26},"进行孔压消散试验时，不得松动探杆",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},980267,"当碎石土中粒径小于0.075mm的细粒土质量超过总质量的25%时，应定名为粗粒混合土；当粉土或黏性土中粒径大于（ ）mm的粗粒土质量超过总质量的25%时，应定名为细粒混合土。",[62,64,66,68],{"key":20,"text":63,"correct":26},"1.175",{"key":24,"text":65,"correct":22},"2",{"key":28,"text":67,"correct":26},"2.275",{"key":31,"text":69,"correct":26},"3",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},980268,"采取原状土样的钻孔，其孔径不应小于（ ）mm。",[74,76,78,80],{"key":20,"text":75,"correct":26},"151",{"key":24,"text":77,"correct":26},"130",{"key":28,"text":79,"correct":22},"91",{"key":31,"text":81,"correct":26},"75",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},980269,"岩芯钻探的岩芯采取率时，完整和较完整岩体的岩芯采取率不应低于（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"70%",{"key":24,"text":89,"correct":22},"80%",{"key":28,"text":91,"correct":26},"85%",{"key":31,"text":93,"correct":26},"95%",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},980270,"砂砾石层宜采用（ ）方式钻进。",[98,100,102,104],{"key":20,"text":99,"correct":26},"回转钻进",{"key":24,"text":101,"correct":22},"冲击钻进",{"key":28,"text":103,"correct":26},"冲洗钻进",{"key":31,"text":105,"correct":26},"金刚石双管双动钻进",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},980271,"用直径为75mm双管金刚石钻进岩石，1m进尺的岩芯长度分别为25cm、7cm、11cm、 3cm, 25cm, 19cm , 4cm、6cm,此段岩体的RQD是（ ）。",[110,112,114,115],{"key":20,"text":111,"correct":26},"25%",{"key":24,"text":113,"correct":26},"50%",{"key":28,"text":89,"correct":22},{"key":31,"text":116,"correct":26},"100%",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":31,"analysis":33},980272,"对于原状土II级试样，可进行的试验是（ ）。",[121,123,125,127],{"key":20,"text":122,"correct":26},"土类定名",{"key":24,"text":124,"correct":26},"土类定名和含水量试验",{"key":28,"text":126,"correct":26},"土类定名、含水量、密度、强度和固结试验",{"key":31,"text":128,"correct":22},"土类定名、含水量、密度试验",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":24,"analysis":33},980273,"边坡勘察，勘探孔深度应穿过潜在滑动面并深人隐定层（ ）m以内。",[133,135,137,139],{"key":20,"text":134,"correct":26},"1",{"key":24,"text":136,"correct":22},"2~5",{"key":28,"text":138,"correct":26},"6",{"key":31,"text":140,"correct":26},"7",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":20,"analysis":33},980274,"岩土工程初步勘察，当预定深度内有厚度较大、且分布均匀的坚实土层（如碎石土、 密实砂、老沉积土等）时，勘察孔深度应做的调整是（ ）。",[145,147,149,151],{"key":20,"text":146,"correct":22},"除控制性孔达到规定深度外，一般性孔的深度可适当减少",{"key":24,"text":148,"correct":26},"所有钻孔均可酌情减少",{"key":28,"text":150,"correct":26},"为维护勘察合同的权威性，勘察资料的完整性，所有计划的孔深均不变",{"key":31,"text":152,"correct":26},"可酌情减少控制性钻孔的孔深和数量",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":31,"analysis":33},980275,"岩石质量指标（RQ D）是采用（ ）得到的。",[157,159,161,163],{"key":20,"text":158,"correct":26},"三重管合金钻头",{"key":24,"text":160,"correct":26},"双重管金钢石钻头",{"key":28,"text":162,"correct":26},"双重管合金钻头",{"key":31,"text":164,"correct":22},"N型二重管金刚石钻头",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":24,"analysis":33},980276,"根据《岩土工程勘察规范》（GB 50021—2001) (2009年版），对同一土层中相间呈韵律沉积，当薄层与厚层的厚度比大于1\u002F3时，宜定名为（ ）。",[169,171,173,175],{"key":20,"text":170,"correct":26},"夹层",{"key":24,"text":172,"correct":22},"互层",{"key":28,"text":174,"correct":26},"千层",{"key":31,"text":176,"correct":26},"夹薄层",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":31,"analysis":33},980277,"根据《岩土X程勘察规范》（GB 50021一2001），水试样采取后应及时试验，下列做法不正确的是（ ）。",[181,183,185,187],{"key":20,"text":182,"correct":26},"清洁水放置时间不宜超过72小时",{"key":24,"text":184,"correct":26},"稍受污染的水不宜超过48小时",{"key":28,"text":186,"correct":26},"受污染的水不宜超过12小时",{"key":31,"text":188,"correct":22},"污染严重的水不宜超过6小时",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":20,"analysis":33},980278,"根据《岩土工程勘察规范》（GB 50021—2001 )(2009年版），下列关于风化岩与残积土的勘探测试原则的描述不正确的是（ ）。",[193,195,197,199],{"key":20,"text":194,"correct":22},"勘探点间距应取本规范第四章规定值的平均值",{"key":24,"text":196,"correct":26},"宜在探井中或采用二（三）重回转取土器采取试样",{"key":28,"text":198,"correct":26},"原位测试可采用圆锥动力触探、标准贯入、波速测试、载荷试验等方法",{"key":31,"text":200,"correct":26},"对残积土必要时进行湿陷性和湿化试验",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":28,"analysis":33},980279,"在使用套管的钻孔中，采取I级土试样时，取样位置应（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":26},"位于套管底",{"key":24,"text":208,"correct":26},"低于套管底一倍孔径的距离",{"key":28,"text":210,"correct":22},"低于套管底三倍孔径以上的距离",{"key":31,"text":212,"correct":26},"低于套管底五倍孔径以上的距离",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":31,"analysis":33},980280,"在土的动力性质试验中，较常用的方法不包括（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":26},"动三轴",{"key":24,"text":220,"correct":26},"动单剪",{"key":28,"text":222,"correct":26},"共振柱",{"key":31,"text":224,"correct":22},"跨孔法",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":20,"analysis":33},980281,"土的抗剪强度不受（ ）的影响。",[229,231,233,235],{"key":20,"text":230,"correct":22},"自重应力",{"key":24,"text":232,"correct":26},"附加应力",{"key":28,"text":234,"correct":26},"土的内聚力",{"key":31,"text":236,"correct":26},"土的内摩擦角",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":31,"analysis":33},980282,"使用固结试验确定土的压缩模量，以进行沉降计算。地基中土的有效自重压力为 120kPa,附加压力为130kPa，则固结试验最大压力应当大于（ ）kPa。",[241,243,245,246],{"key":20,"text":242,"correct":26},"120",{"key":24,"text":244,"correct":26},"125",{"key":28,"text":77,"correct":26},{"key":31,"text":247,"correct":22},"250",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":28,"analysis":33},980283,"求解条形基础下的地基附加应力，常将地基中产生的应力状态看成是（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":26},"空间应力问题",{"key":24,"text":255,"correct":26},"平面应力问题",{"key":28,"text":257,"correct":22},"平面应变问题",{"key":31,"text":259,"correct":26},"轴对称问题",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":28,"analysis":33},980284,"地基内有高压缩性土层且需预测建筑物的沉降历时关系时，需要确定土的（ ）。",[264,266,268,270],{"key":20,"text":265,"correct":26},"压缩系数α",{"key":24,"text":267,"correct":26},"压缩指数Ce",{"key":28,"text":269,"correct":22},"固结系数Cr",{"key":31,"text":271,"correct":26},"先期固结压力Pe",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":24,"analysis":33},980285,"某岩石进行岩石颗粒密度试验采用比重瓶法，干岩粉质量为31.23g，瓶及试液总质量为137. 10g，瓶、试液及岩粉总质量为156. 96g，同温度下水的密度为0.98g\u002Fcm3，该岩石颗粒的密度为（ ）g\u002Fcm3。",[276,278,280,282],{"key":20,"text":277,"correct":26},"2.68",{"key":24,"text":279,"correct":22},"2.69",{"key":28,"text":281,"correct":26},"2.70",{"key":31,"text":283,"correct":26},"2.71",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":20,"analysis":33},980286,"在三轴仪中进行固结不排水抗剪强度试验，当试样受到的周围固结压力σ3大于它曾经受到的最大固结压力Pc时，该试样为（）。",[288,290,292,294],{"key":20,"text":289,"correct":22},"正常固结土",{"key":24,"text":291,"correct":26},"超固结土",{"key":28,"text":293,"correct":26},"欠固结土",{"key":31,"text":295,"correct":26},"高压固结土",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":31,"analysis":33},980287,"进行载荷试验时，在下列（ ）情况下不能终止试验。",[300,302,304,306],{"key":20,"text":301,"correct":26},"承压板周边土体出现明显侧向挤出或隆起",{"key":24,"text":303,"correct":26},"本级荷载沉降量超过前级荷载沉降量的5倍",{"key":28,"text":305,"correct":26},"在某级荷载下24小时沉降速率不能达到相对稳定标准",{"key":31,"text":307,"correct":22},"总沉降量与承压板宽度或直径之比大于0.01或0. 015",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":31,"analysis":33},980288,"根据《岩土工程勘察规范》（GB50021—2001) (2009年版），膨胀性岩土室内试验除进行常规试验外，还应进行其他指标的测定，下列指标中可不测定的是（ ）。",[312,314,316,318],{"key":20,"text":313,"correct":26},"自由膨胀率",{"key":24,"text":315,"correct":26},"膨胀力",{"key":28,"text":317,"correct":26},"收缩系数",{"key":31,"text":319,"correct":22},"最大膨胀上升量",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":28,"analysis":33},980289,"在无侧限抗压强度试验中，当曲线上峰值不明显时，取轴向应变的（ ）所对应的轴向应力作为无侧限抗压强度。",[324,326,328,330],{"key":20,"text":325,"correct":26},"5%",{"key":24,"text":327,"correct":26},"10%",{"key":28,"text":329,"correct":22},"15%",{"key":31,"text":331,"correct":26},"20%",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":20,"analysis":33},980290,"对抗剪强度的判断，下列说法不正确的是（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":22},"土的c、φ值之间一般是有正相关关系，c值大，φ值就大",{"key":24,"text":339,"correct":26},"在饱和软黏土中，可假定φ=0",{"key":28,"text":341,"correct":26},"纯净的干砂c=0",{"key":31,"text":343,"correct":26},"用抗剪强度计算地基承载力时，公式中三个承载力系数值就取决于φ值的大小而与 c值无关",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":31,"analysis":33},980291,"工程计算中是通过（ ）获取土的变形模量。",[348,350,352,354],{"key":20,"text":349,"correct":26},"直接剪切试验",{"key":24,"text":351,"correct":26},"三轴压缩试验",{"key":28,"text":353,"correct":26},"固结试验",{"key":31,"text":355,"correct":22},"平板载荷试验",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":24,"analysis":33},980292,"固定活塞取土器是（ ）。",[360,362,364,366],{"key":20,"text":361,"correct":26},"由一个活塞和两套管子组成，取土质量较差",{"key":24,"text":363,"correct":22},"由一个活塞和两套管子组成，取土质量较好",{"key":28,"text":365,"correct":26},"由两个活塞和一套管子组成，取土质量较差",{"key":31,"text":367,"correct":26},"由两个活塞和两套管子组成，取土质量较差",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":28,"analysis":33},980293,"压缩模量是指土在（ ）条件下的应力与应变的比値。",[372,374,376,378],{"key":20,"text":373,"correct":26},"侧向自由膨胀条件",{"key":24,"text":375,"correct":26},"侧向有限变形条件",{"key":28,"text":377,"correct":22},"侧向变形为零",{"key":31,"text":379,"correct":26},"平面变形条件",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":24,"analysis":33},980295,"与直剪试验相比，（ ）不是三轴剪切试验所具有的优点。",[384,386,388,390],{"key":20,"text":385,"correct":26},"应力条件明确",{"key":24,"text":387,"correct":22},"剪切面固定",{"key":28,"text":389,"correct":26},"分析原理严密",{"key":31,"text":391,"correct":26},"可模拟各种排水条件和应力条件",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":24,"analysis":33},980296,"土工试验中的四分法是指（ ）。",[396,398,400,402],{"key":20,"text":397,"correct":26},"将扰动土样均勻拌和在一起，分成若干份，取每份总重的1\u002F4",{"key":24,"text":399,"correct":22},"将扰动土样均匀拌和在一起，十字形分成四份，取其中对角的两个扇形部分",{"key":28,"text":401,"correct":26},"将扰动土样均匀拌和在一起，十字形分成四份，顺时针方向在每一份中取固定数量",{"key":31,"text":403,"correct":26},"将扰动土样均匀拌和在一起，十字形分成四份，取其中每一扇形的1\u002F4半径的部分",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":28,"analysis":33},980297,"利用十字板剪切试验测得饱和黏土原状土的不排水抗剪强度为10.6kPa,重塑土的不 排水抗剪强度为2.0kPa，该土的灵敏度S1为（ ）。",[408,410,412,414],{"key":20,"text":409,"correct":26},"2.0",{"key":24,"text":411,"correct":26},"4.0",{"key":28,"text":413,"correct":22},"5.3",{"key":31,"text":415,"correct":26},"10.6",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":24,"analysis":33},980298,"采用回转式取土器取样时，下列说法不正确的是（ ）。",[420,422,424,426],{"key":20,"text":421,"correct":26},"内管管口至少应与外管齐平",{"key":24,"text":423,"correct":22},"内管管口可比外管短50 ~ 150mm",{"key":28,"text":425,"correct":26},"内管管口应比外管超前，对软土超前量可适当增加",{"key":31,"text":427,"correct":26},"对软硬交替的土层，内管的超前量应具有自动调节功能",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":28,"analysis":33},980299,"当地基土为饱和软黏土且荷载施加速率较快时，三轴试验宜采用（ ）。",[432,434,436,438],{"key":20,"text":433,"correct":26},"固结不排水剪切试验",{"key":24,"text":435,"correct":26},"不固结不排水剪切试验",{"key":28,"text":437,"correct":22},"自重压力预固结条件下的不固结不排水剪切试验",{"key":31,"text":439,"correct":26},"固结排水剪切试验",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":31,"analysis":33},980300,"图1 - 7中带箭头曲线为饱和正常固结土的应力路径，其符合的试验应力路径是（ ）。（图中，P、q、Kf表示总应力路径；p′、q′、K′f表示有效应力路径）",[444,446,448,450],{"key":20,"text":445,"correct":26},"无侧限固结试验的有效应力路径",{"key":24,"text":447,"correct":26},"三轴等压试验的总应力路径",{"key":28,"text":449,"correct":26},"常规三轴压缩试验的总应力路径",{"key":31,"text":451,"correct":22},"常规三轴固结不排水试验的有效应力路径",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":20,"analysis":33},980301,"击实试验是为了获得土的（ ）。",[456,458,460,462],{"key":20,"text":457,"correct":22},"最优含水率和最大干密度",{"key":24,"text":459,"correct":26},"最优含水率和最大抗剪强度",{"key":28,"text":461,"correct":26},"最大干密度和最小压缩系数",{"key":31,"text":463,"correct":26},"最大抗剪强度和最小压缩系数",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":24,"analysis":33},980302,"点荷载试验直接测出岩石的（ ）。",[468,470,472,474],{"key":20,"text":469,"correct":26},"抗压强度",{"key":24,"text":471,"correct":22},"抗拉强度",{"key":28,"text":473,"correct":26},"抗弯强度",{"key":31,"text":475,"correct":26},"抗剪强度",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":31,"analysis":33},980303,"常规的压水试验为吕荣试验，其适用地层和成果表达分别为（ ）。",[480,482,484,486],{"key":20,"text":481,"correct":26},"黏性土、含水量",{"key":24,"text":483,"correct":26},"砂砾石、承载力",{"key":28,"text":485,"correct":26},"粉土、密实度",{"key":31,"text":487,"correct":22},"岩层、透水率",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":28,"analysis":33},980304,"在某砂砾石层中进行标准贯入试验，锤击数巳达50击，实际贯入深度仅为13cm，按有关公式进行换算，相当于贯入30cm的锤击数W可取（ ）击。",[492,494,496,498],{"key":20,"text":493,"correct":26},"105",{"key":24,"text":495,"correct":26},"110",{"key":28,"text":497,"correct":22},"115",{"key":31,"text":242,"correct":26},{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":28,"analysis":33},980305,"下列对十字板剪切试验成果应用的提法中，错误的是（ ）。",[503,505,507,509],{"key":20,"text":504,"correct":26},"可较好地反映饱和软黏性土不排水抗剪强度随深度的变化",{"key":24,"text":506,"correct":26},"可分析确定软黏性土不排水抗剪强度峰值和残余值",{"key":28,"text":508,"correct":22},"所测得的不排水抗剪强度峰值一般较长期强度偏低30%~40%",{"key":31,"text":510,"correct":26},"可根据试验结果计算灵敏度",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":31,"analysis":33},980306,"下列原位测试方法中，最适用于软土的是（ ）。",[515,517,519,521],{"key":20,"text":516,"correct":26},"十字板剪切试验",{"key":24,"text":518,"correct":26},"静力载荷试验",{"key":28,"text":520,"correct":26},"静力触探试验",{"key":31,"text":522,"correct":22},"扁铲侧胀试验",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":31,"analysis":33},980307,"污染土的承载力宜采用（ ）和其他原位测试确定，并进行污染土与未污染土的对比试验。",[527,529,531,533],{"key":20,"text":528,"correct":26},"静力试验",{"key":24,"text":530,"correct":26},"剪切试验",{"key":28,"text":532,"correct":26},"旁压试验",{"key":31,"text":534,"correct":22},"载荷试验",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":28,"analysis":33},980308,"地下水流速的测定可采用指示剂法或（ ）。",[539,541,543,545],{"key":20,"text":540,"correct":26},"几何法",{"key":24,"text":542,"correct":26},"图尺法",{"key":28,"text":544,"correct":22},"充电法",{"key":31,"text":546,"correct":26},"记录法",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":31,"analysis":33},980309,"圆锥动力触探试验成果分析的内容不包括（ ）。",[551,553,555,557],{"key":20,"text":552,"correct":26},"单孔连续圆锥动力触探试验应绘制锤击数与贯入深度关系曲线",{"key":24,"text":554,"correct":26},"计算单孔分层贯入指标平均值时，应剔除临界深度以内的数值、超前和滞后影响范 围内的异常值",{"key":28,"text":556,"correct":26},"根据各孔分层的贯入指标平均值，用厚度加权平均法计算场地分层贯入指标平均值 和变异系数",{"key":31,"text":558,"correct":22},"探头应匀速直压入土中，贯入速率为1.2m\u002Fmin",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":31,"analysis":33},980310,"在对地下洞室进行详细勘察时，根据《岩土工程勘察规范》（GB 50021—2001 )(2009年 版），下列说法错误的是（ ）。",[563,565,567,569],{"key":20,"text":564,"correct":26},"山区勘探点间距不应大于50m",{"key":24,"text":566,"correct":26},"勘探点宜在洞室中线外侧6 ~8m交叉布置",{"key":28,"text":568,"correct":26},"第四系中的一般性勘探孔可钻至基底设计标高下6 ~ 10m",{"key":31,"text":570,"correct":22},"采集试样及原位测试勘探孔数量不应少于勘探孔总数的2\u002F3",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":31,"analysis":33},980311,"在对地下洞室进行详细勘察时，根据《岩土工程勘察规范》（GB50021—2001 )(2009年版），下列说法错误的是（ ）。",[575,576,578,579],{"key":20,"text":564,"correct":26},{"key":24,"text":577,"correct":26},"勘探点宜在洞室中线外侧6~8m交叉布置",{"key":28,"text":568,"correct":26},{"key":31,"text":570,"correct":22},{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":28,"analysis":33},980312,"对于房屋建筑及构筑物的岩土工程勘察应分阶段进行，根据《岩土工程勘察规范》(GB 50021 —2001 ) (2009年版）的有关要求，符合施工图设计要求的勘察应定名为（ ）。",[584,586,588,590],{"key":20,"text":585,"correct":26},"可行性研究勘察",{"key":24,"text":587,"correct":26},"初步勘察",{"key":28,"text":589,"correct":22},"详细勘察",{"key":31,"text":591,"correct":26},"施工勘察",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":31,"analysis":33},980313,"路堤填土分层压实达到要求的密实度，为此应对填土材料进行击实试验。下列关于击实试验的说法不正确的是（ ）。",[596,598,600,602],{"key":20,"text":597,"correct":26},"最优含水量是指对特定的土在一定的击实能量下达到最大密实状态时所对应含水量",{"key":24,"text":599,"correct":26},"对于不同的土，土的可塑性增大，最优含水量也就增大",{"key":28,"text":601,"correct":26},"对于同一种土，所施加的击实能越大，最优含水量也就越小",{"key":31,"text":603,"correct":22},"对于同一种土，土的最优含水量越大，最大干密度也就越大",{"id":605,"libraryId":5,"type":15,"typeLabel":16,"stem":606,"options":607,"answer":20,"analysis":33},980314,"圆锥动力触探的“超前”和“滞后”效应，常发生在（ ）。",[608,610,612,614],{"key":20,"text":609,"correct":22},"软硬地层接触的界面上",{"key":24,"text":611,"correct":26},"地下水位以下的界面上",{"key":28,"text":613,"correct":26},"贯入操作暂停时的前后界面上",{"key":31,"text":615,"correct":26},"达到某一临界深度上下的界面上",[617,620,623,626,629,632],{"id":15,"name":618,"category":7,"favorite":619},"领导干部任职前廉政法规知识测试题",92,{"id":621,"name":622,"category":7,"favorite":15},595,"建筑结构与设备",{"id":624,"name":625,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":627,"name":628,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":630,"name":631,"category":7,"favorite":8},534,"BIM工程师",{"id":633,"name":631,"category":7,"favorite":8},535]