[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-709-25":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":631},{"id":5,"name":6,"category":7,"favorite":8},709,"岩土专业知识","建筑工程",0,25,50,1370,[13,35,48,61,74,86,99,112,125,137,150,162,174,187,199,211,223,235,247,259,271,283,294,306,318,330,342,354,366,378,390,402,414,426,438,450,462,474,486,498,511,523,535,547,559,571,583,595,607,619],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":33,"analysis":34},981376,2,"多选题","根据《公路工程地质勘察规范》（JTJ064—1998），下列关于崩塌和岩堆详勘的说法正确的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","纵向勘探线沿工程轴线方向布置，勘探点间距不大于25m",false,{"key":24,"text":25,"correct":26},"B","勘探深度一般在基础底面或开挖最低点以下3m",true,{"key":28,"text":29,"correct":26},"C","应尽量利用附近的露头或初勘时的勘探资料",{"key":31,"text":32,"correct":22},"D","勘探以钻探为主，辅以物探验证","BC","",{"id":36,"libraryId":5,"type":15,"typeLabel":16,"stem":37,"options":38,"answer":47,"analysis":34},981377,"关于滑坡防治，下列措施合理的是（ ）。",[39,41,43,45],{"key":20,"text":40,"correct":26},"截断和排出所有流入滑坡范围的地表水",{"key":24,"text":42,"correct":22},"挖掉坡角岩土体减重",{"key":28,"text":44,"correct":22},"置换滑动带的岩土体",{"key":31,"text":46,"correct":26},"加固滑动带的岩土体","AD",{"id":49,"libraryId":5,"type":15,"typeLabel":16,"stem":50,"options":51,"answer":60,"analysis":34},981378,"下列各项属于稳定滑坡的识别标志的是（ ）。",[52,54,56,58],{"key":20,"text":53,"correct":22},"滑坡后缘地带出现双沟同源或洼地，沟壁比较稳定，草木丛生",{"key":24,"text":55,"correct":22},"河流阶地被超覆或剪断，阶地面不连接，堆积物层次不连续或上下倒置，产状紊乱。斜坡前缘有泉水或湿地分布，喜水植物茂盛",{"key":28,"text":57,"correct":26},"主滑体已堆积于前缘地段，堆积坡面已较平缓密实，建筑物无变形迹象",{"key":31,"text":59,"correct":26},"河流已远离滑坡舌，不再受洪水淘刷，植被完好，无坍塌迹象","CD",{"id":62,"libraryId":5,"type":15,"typeLabel":16,"stem":63,"options":64,"answer":73,"analysis":34},981379,"下列说法不正确的是（ ）。",[65,67,69,71],{"key":20,"text":66,"correct":26},"冻土是指摄氏零下10度且含有冰的各类土",{"key":24,"text":68,"correct":22},"天然含水量w=20%的粉土，冻结期间地下水位不低于冻深1.5m时，应判定为冻胀",{"key":28,"text":70,"correct":26},"多年冻土是指冻结状态连续10年以上不融的冻土",{"key":31,"text":72,"correct":26},"冻土地基勘探钻进时，宜采用小孔径，一般应小于108mm","ACD",{"id":75,"libraryId":5,"type":15,"typeLabel":16,"stem":76,"options":77,"answer":33,"analysis":34},981380,"下列关于泥石流发育的叙述正确的是（ )。",[78,80,82,84],{"key":20,"text":79,"correct":22},"气候是影响泥石流发育的因素之一",{"key":24,"text":81,"correct":26},"寒冷地区泥石流不发育",{"key":28,"text":83,"correct":26},"干旱地区泥石流不发育",{"key":31,"text":85,"correct":22},"植被发育地区泥石流不发育",{"id":87,"libraryId":5,"type":15,"typeLabel":16,"stem":88,"options":89,"answer":98,"analysis":34},981381,"泥石流分区名称包括（ ）。",[90,92,94,96],{"key":20,"text":91,"correct":26},"流通区",{"key":24,"text":93,"correct":26},"堆积区",{"key":28,"text":95,"correct":22},"成长区",{"key":31,"text":97,"correct":26},"形成区","ABD",{"id":100,"libraryId":5,"type":15,"typeLabel":16,"stem":101,"options":102,"answer":111,"analysis":34},981382,"关于泥石流的分类与分期，下列叙述正确的是（ ）。",[103,105,107,109],{"key":20,"text":104,"correct":26},"按规模分类时应考虑固体物质储量和固体物质一次最大冲出量",{"key":24,"text":106,"correct":22},"可按泥石流的发生频率划分为高频率、中频率、低频率三种类型",{"key":28,"text":108,"correct":26},"按流域形态、特征可把泥石流划分为沟谷塑与山坡型两种",{"key":31,"text":110,"correct":22},"泥石流的发育阶段可划分为发育初期、成长期、成熟期","AC",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":124,"analysis":34},981383,"线路通过泥石流时，工程地质的选线原则有（ ）。",[116,118,120,122],{"key":20,"text":117,"correct":22},"线路应绕避处于发育初期的泥石流群",{"key":24,"text":119,"correct":26},"线路应远离泥石流堵河严重地段的河岸",{"key":28,"text":121,"correct":22},"线路跨越泥石流沟时应选择沟床纵坡由陡变缓的变坡处和平面上急弯部位",{"key":31,"text":123,"correct":26},"路线在泥石流扇上通过时，不得挖沟设桥或作路堑","BD",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":124,"analysis":34},981384,"泥石流地区的建筑适宜性评价中，下列说法不正确的是（ ）。",[129,131,133,135],{"key":20,"text":130,"correct":22},"I1类泥石流沟谷不应作为建筑场地，各类线路工程应避开",{"key":24,"text":132,"correct":26},"II1类泥石流沟谷可以作为建筑场地",{"key":28,"text":134,"correct":22},"I2和II2类泥石流沟谷不宜作为建筑场地",{"key":31,"text":136,"correct":26},"当线路必须通过I2类泥石流沟口时，应设桥通过，桥位应设在河床弯曲处",{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":149,"analysis":34},981385,"下列（ ）为高频率泥石流沟谷I2的活动特征。",[141,143,145,147],{"key":20,"text":142,"correct":22},"泥石流爆发周期一般在10年以上",{"key":24,"text":144,"correct":26},"泥石流基本上每年都发生",{"key":28,"text":146,"correct":26},"流域面积为1 ~5km2",{"key":31,"text":148,"correct":26},"堆积区面积小于1km2","BCD",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":149,"analysis":34},981386,"采空区移动盆地一般具有以下（ ）特征。",[154,156,158,160],{"key":20,"text":155,"correct":22},"移动盆地正逐步向外扩展，地表变形较强烈",{"key":24,"text":157,"correct":26},"移动盆地范围较大，已接近极限状态",{"key":28,"text":159,"correct":26},"采空区正上方水平变形与垂直变形均较小",{"key":31,"text":161,"correct":26},"移动盆地的移动速度逐渐减小",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":98,"analysis":34},981387,"线路工程采空区初勘阶段的勘察重点是（ ）。",[166,168,170,172],{"key":20,"text":167,"correct":26},"查明采空区地表变形和塌陷的分布规律、发展趋势及其诱发的其他不良地质现象的类型、位置和规模",{"key":24,"text":169,"correct":26},"查明采空区的范围、埋藏深度、空间大小、顶板岩层厚度、地质构造等特点",{"key":28,"text":171,"correct":22},"查明建筑物分布情况",{"key":31,"text":173,"correct":26},"查明采空区顶板的管理办法、塌落情况和采空空间的充填程度",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":186,"analysis":34},981388,"采空区的危害指（ ）。",[178,180,182,184],{"key":20,"text":179,"correct":26},"导致地表各类建筑物变形破坏，甚至倒塌",{"key":24,"text":181,"correct":26},"导致公路、铁路等线路工程变形破坏",{"key":28,"text":183,"correct":26},"使地表大面积下沉，凹陷，破坏大片农田",{"key":31,"text":185,"correct":22},"地表均匀下沉","ABC",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":124,"analysis":34},981389,"关于采空区上方的地表移动盆地，下列说法正确的是（ ）。",[191,193,195,197],{"key":20,"text":192,"correct":22},"矿层倾角平缓时，形状不对称于采空区",{"key":24,"text":194,"correct":26},"矿层倾角较大时，盆地在沿矿层走向方向仍对称于采空区，而沿倾斜方向随着倾角的增大，盆地中心愈向倾斜的方向偏移",{"key":28,"text":196,"correct":22},"矿层倾角较大时，盆地在沿矿层走向和倾向都不对称于采空区",{"key":31,"text":198,"correct":26},"矿层倾角平缓时，盆地位于采空区的正上方，形状对称于采空区",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":186,"analysis":34},981390,"关于地质构造和地下水因素对地表变形的影响，下列说法正确的是（ ）。",[203,205,207,209],{"key":20,"text":204,"correct":26},"采区上方岩层节理裂隙发育，会促进变形加快，增大变形范围，扩大地表裂缝区",{"key":24,"text":206,"correct":26},"断层会破坏采空区上方地表移动的正常规律，改变移动盆地的大小和位置，断层带上的地表变形更加剧烈",{"key":28,"text":208,"correct":26},"地下水活动（特别是对抗水性弱的岩层）会加快变形速度，扩大变形范围，增大地表变形值",{"key":31,"text":210,"correct":22},"以房柱式及条带式开采和全部充填法处置顶板，地表变形影响较大",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":186,"analysis":34},981391,"顶板及采空区处理方法有（ ）。",[215,217,219,221],{"key":20,"text":216,"correct":26},"全部垮落法、带状充填法（外来材料）",{"key":24,"text":218,"correct":26},"矸石自溜充填法、干式全部充填法",{"key":28,"text":220,"correct":26},"风力和机械干式充填法、水力矸石充填法",{"key":31,"text":222,"correct":22},"砂石充填法",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":186,"analysis":34},981392,"防止地表和建筑物变形，建筑设计方面的措施有（ ）。",[227,229,231,233],{"key":20,"text":228,"correct":26},"加强基础刚度和上部结构强度，在结构薄弱处更应加强",{"key":24,"text":230,"correct":26},"建筑物平面形状应力求简单，以矩形为宜",{"key":28,"text":232,"correct":26},"基础底部应位于同一标高和岩性均一的地层上，否则应用沉降缝分开。当基础埋深不一致时，应采用台阶，不宜采用柱廊和独立柱",{"key":31,"text":234,"correct":22},"建筑物长轴应平行工作面的推进方向",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":98,"analysis":34},981393,"在采空区，下列各项中（ ）的情况易产生不连续地表变形。",[239,241,243,245],{"key":20,"text":240,"correct":26},"小煤窑煤巷开采",{"key":24,"text":242,"correct":26},"急倾斜煤层开采",{"key":28,"text":244,"correct":22},"开采深度和开采厚度比值较大(一般大于30)",{"key":31,"text":246,"correct":26},"开采深度和开采厚度比值较小（一般小于30）",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":98,"analysis":34},981394,"防止地表和建筑物变形，开采工艺方面的措施有（ ）。",[251,253,255,257],{"key":20,"text":252,"correct":26},"采用充填法处置顶板，及时全部充填或两次充填，以减少地表下沉量",{"key":24,"text":254,"correct":26},"减少开采厚度，或采用条带法开采，使地表变形不超过建筑物的容许极限值",{"key":28,"text":256,"correct":22},"应加快推进速度",{"key":31,"text":258,"correct":26},"增大采空区宽度，使地表移动充分",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":149,"analysis":34},981395,"关于各因素对采空区上方移动盆地的影响，下列说法正确的是（ ）。",[263,265,267,269],{"key":20,"text":264,"correct":22},"矿层埋深愈大，地表变形值愈小，变形比较平缓均匀，地表移动盆地的范围愈小",{"key":24,"text":266,"correct":26},"矿层倾角大时，使水平移动值增大，地表出现裂缝的可能性加大",{"key":28,"text":268,"correct":26},"矿层厚度大，采空的空间大，会促使地表的变形值增大",{"key":31,"text":270,"correct":26},"矿层埋深愈大，地表变形值愈小，变形比较平缓均匀，但地表移动盆地的范围增大",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":186,"analysis":34},981396,"下列措施对防止采空区地表及建筑物变形有利的是（ )。",[275,277,279,281],{"key":20,"text":276,"correct":26},"增大采空区宽度，使地表充分移动",{"key":24,"text":278,"correct":26},"减少开采厚度或采用条带法开采",{"key":28,"text":280,"correct":26},"采用充填法处置顶板",{"key":31,"text":282,"correct":22},"建筑物应力求高大，以增加建筑物自身的刚度",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":47,"analysis":34},981397,"下列措施可以用于防止采空区地表和建筑物变形的是（ ）。",[287,288,290,292],{"key":20,"text":258,"correct":26},{"key":24,"text":289,"correct":22},"加速开采推进速度",{"key":28,"text":291,"correct":22},"建筑物长轴平行工作面推进方向",{"key":31,"text":293,"correct":26},"加强基础刚度和上部结构强度",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":98,"analysis":34},981398,"对已发生地面沉降的地K进行控制和治理，下列（ ）是可采用的方案。",[298,300,302,304],{"key":20,"text":299,"correct":26},"减少或暂停地下水开采",{"key":24,"text":301,"correct":26},"地下水从浅层转至深层开采",{"key":28,"text":303,"correct":22},"暂停大范围建设，特别是高层建筑群的建设",{"key":31,"text":305,"correct":26},"对地下水进行人工补给",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":73,"analysis":34},981399,"根据《岩土工程勘察规范》（GB50021-2001） （2009年版），对可能发生地面沉降地区勘察的要求主要有（ ）。",[310,312,314,316],{"key":20,"text":311,"correct":26},"预测发生的可能性，提出预防和控制的建议",{"key":24,"text":313,"correct":22},"预测其发展趋势，提出控制和治理的方案",{"key":28,"text":315,"correct":26},"对可能产生沉降的层位做出估测",{"key":31,"text":317,"correct":26},"对沉降量进行估算",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":186,"analysis":34},981400,"地面沉降的长期观测中，要设置的标中包括（ ）。",[322,324,326,328],{"key":20,"text":323,"correct":26},"高程基准标",{"key":24,"text":325,"correct":26},"地面沉降标",{"key":28,"text":327,"correct":26},"土层分层沉降标",{"key":31,"text":329,"correct":22},"地下水位下降标",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":98,"analysis":34},981401,"新近堆积黄土具有以下（ ）物理性质。",[334,336,338,340],{"key":20,"text":335,"correct":26},"天然含水量相对较高",{"key":24,"text":337,"correct":26},"压缩性较高且低压力段压缩性高",{"key":28,"text":339,"correct":22},"液限相对较高",{"key":31,"text":341,"correct":26},"一般结构较疏松，土质较差",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":124,"analysis":34},981402,"在湿陷性黄土场地采用桩基础时，应注意的问题有（ ）。",[346,348,350,352],{"key":20,"text":347,"correct":22},"各类湿陷黄土场地，粧端均应支撑在可靠的岩（土）层中",{"key":24,"text":349,"correct":26},"单桩竖向承载力特征值可通过现场静载荷试验或经验公式估算确定",{"key":28,"text":351,"correct":22},"单桩水平承载力特征值，宜通过十字板剪切试验确定",{"key":31,"text":353,"correct":26},"预先消除自重湿陷性黄土的湿陷量，可提高桩基竖向承载力",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":73,"analysis":34},981403,"对湿陷性黄土地区高层建筑的结构设计，下列说法正确的是（ ）。",[358,360,362,364],{"key":20,"text":359,"correct":26},"选用轻质高强材料",{"key":24,"text":361,"correct":22},"调整上部荷载和基础宽度，使地基应力均匀分布",{"key":28,"text":363,"correct":26},"加强上部结构刚度",{"key":31,"text":365,"correct":26},"加强基础刚度",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":186,"analysis":34},981404,"湿陷性地区上的地基计算应包括（ ）。",[370,372,374,376],{"key":20,"text":371,"correct":26},"强度计算",{"key":24,"text":373,"correct":26},"湿陷变形计算",{"key":28,"text":375,"correct":26},"压缩变形计算",{"key":31,"text":377,"correct":22},"刚度计算",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":186,"analysis":34},981405,"根据湿陷性黄土地区上的建筑物分类原则，下列属于甲类建筑物的是（ ）。",[382,384,386,388],{"key":20,"text":383,"correct":26},"高度不小于60m的高层建筑物",{"key":24,"text":385,"correct":26},"高度不小于50m的筒仓",{"key":28,"text":387,"correct":26},"6000人以上座位的体育馆",{"key":31,"text":389,"correct":22},"高度大于50m的烟囱",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":98,"analysis":34},981406,"关于湿陷性黄土地区的地基处理，下列说法正确的是（ ）。",[394,396,398,400],{"key":20,"text":395,"correct":26},"各类湿陷性黄土地基上的甲类建筑物，应消除地基的全部湿陷量或采用穿透全部湿陷性土层的基础",{"key":24,"text":397,"correct":26},"I级湿陷性黄土地基上的丙类单层建筑物可不处理地基",{"key":28,"text":399,"correct":22},"乙、丙类建筑物可不消除地基的部分湿陷量",{"key":31,"text":401,"correct":26},"丁类建筑物可不作地基处理，但宜按土的不同湿陷程度采取基本防水和适当的结构措施",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":73,"analysis":34},981407,"采用垫层处理黄土地基时，应注意的问题有（ ）。",[406,408,410,412],{"key":20,"text":407,"correct":26},"当仅要求消除基底下1~3m湿陷黄土的湿陷量时，采用局部垫层即可以满足基础设计要求",{"key":24,"text":409,"correct":22},"垫层法仅适用于处理地下水位以上且不大于3m厚的土层",{"key":28,"text":411,"correct":26},"垫层土的最优含水量应采用轻型标准击实试验确定",{"key":31,"text":413,"correct":26},"土垫层承载力设计值不宜大于180kPa，灰土垫层不宜大于250kPa",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":186,"analysis":34},981408,"湿陷性土地区的建筑设计应符合的要求是（ ）。",[418,420,422,424],{"key":20,"text":419,"correct":26},"建筑物的体型与纵横墙的布置，应利于加强其空间刚度，并具有适应或抵抗湿陷变形的能力",{"key":24,"text":421,"correct":26},"妥善处理建筑物的雨水排水系统，多层建筑的室内地坪，宜高出室外地坪45cm",{"key":28,"text":423,"correct":26},"用水设施宜集中设置，缩短地下管线和远离主要承重基础",{"key":31,"text":425,"correct":22},"多层砌体建筑，体型应简单，长高比不宜大于2",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":111,"analysis":34},981409,"关于采用强夯法处理黄土地基，下列做法正确的是（ ）。",[430,432,434,436],{"key":20,"text":431,"correct":26},"强夯施工前应在现场进行试夯",{"key":24,"text":433,"correct":22},"强夯法处理湿陷性黄土地基可不必考虑土层的天然含水量",{"key":28,"text":435,"correct":26},"在强夯土层表面可以再设置一定厚度的灰土垫层",{"key":31,"text":437,"correct":22},"强夯过的土层宜立即测试其地基承载力",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":98,"analysis":34},981410,"下列关于湿陷性黄土地基上的丁类建筑的叙述正确的是（ ）。",[442,444,446,448],{"key":20,"text":443,"correct":26},"地基一律不作处理",{"key":24,"text":445,"correct":26},"在I级湿陷性黄土地基上，应采取基本防水措施",{"key":28,"text":447,"correct":22},"在II级湿陷性黄土地基上，应采取结构措施和基本防水措施",{"key":31,"text":449,"correct":26},"在III、IV级湿陷性黄土地基上，应采取结构措施和检漏防水措施",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":124,"analysis":34},981411,"关于处理湿陷性黄土地基，下列方法不适用的是（ ）。",[454,456,458,460],{"key":20,"text":455,"correct":22},"强夯法",{"key":24,"text":457,"correct":26},"振冲碎石桩法",{"key":28,"text":459,"correct":22},"土挤密桩法",{"key":31,"text":461,"correct":26},"砂石垫层法",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":149,"analysis":34},981412,"关于湿陷性土地区的桩基处理方法，下列说法中正确的是（ ）。",[466,468,470,472],{"key":20,"text":467,"correct":22},"在确定自重湿陷性黄土场地的单桩允许承载力时，应计入湿陷性土层范围内的桩周正摩擦力",{"key":24,"text":469,"correct":26},"对自重湿陷性场地，桩端应支承在可靠的持力层中",{"key":28,"text":471,"correct":26},"对非自重湿陷性场地，桩端应支承在压缩性较低的非湿陷性土层中",{"key":31,"text":473,"correct":26},"采用桩基础时，桩端深度应穿透湿陷性土层",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":47,"analysis":34},981413,"下列关于采用桩基础进行湿陷性黄土地基处理的叙述正确的是（ ）。",[478,480,482,484],{"key":20,"text":479,"correct":26},"桩基础应穿透湿陷性黄土层",{"key":24,"text":481,"correct":22},"对非自重湿陷性黄土，桩底端应支承在可靠的持力层中",{"key":28,"text":483,"correct":22},"对自重湿陷性黄土，桩底端应支承在压缩性较低的非湿陷性土层中",{"key":31,"text":485,"correct":26},"单桩允许承载力，宜按现场浸水静载荷试验并结合地区建筑经验确定",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":47,"analysis":34},981414,"在湿陷性黄土地区建筑施工时，取土坑至建筑物外墙的距离根据《湿陷性黄土地区建筑 规范》（GB 50025-2004）应满足（ ）。",[490,492,494,496],{"key":20,"text":491,"correct":26},"在非自重湿陷性黄土场地，不应小于12m",{"key":24,"text":493,"correct":22},"在非自重湿陷性黄土场地，不应小于25m",{"key":28,"text":495,"correct":22},"在自重湿陷性黄土场地，不应小于12m",{"key":31,"text":497,"correct":26},"在自重湿陷性黄土场地，不应小于25m",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":510,"analysis":34},981415,"划分建筑场地湿陷类型的指标为（ ）。",[502,504,506,508],{"key":20,"text":503,"correct":26},"按室内压缩试验累计的计算自重湿陷量",{"key":24,"text":505,"correct":26},"实测自重湿陷量",{"key":28,"text":507,"correct":22},"按室内压缩试验测定的湿陷系数",{"key":31,"text":509,"correct":22},"孔隙比","AB",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":186,"analysis":34},981416,"下列关于黄土湿陷性的叙述正确的是（ ）。",[515,517,519,521],{"key":20,"text":516,"correct":26},"黄土主要为粉土颗粒组成，其次为砂及黏粒",{"key":24,"text":518,"correct":26},"孔隙比较大，一般在0. 85?1. 24之间",{"key":28,"text":520,"correct":26},"饱和度较大时湿陷较小",{"key":31,"text":522,"correct":22},"液限较小时湿陷较小",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":186,"analysis":34},981417,"膨胀土的室内试验一般有（ ）。",[527,529,531,533],{"key":20,"text":528,"correct":26},"自由膨胀率试验",{"key":24,"text":530,"correct":26},"50kPa压力下膨胀率试验",{"key":28,"text":532,"correct":26},"收缩试验",{"key":31,"text":534,"correct":22},"膨胀土地基承载力试验",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":186,"analysis":34},981418,"膨胀土地基承载力可用下列（ ）方法确定。",[539,541,543,545],{"key":20,"text":540,"correct":26},"载荷试验法",{"key":24,"text":542,"correct":26},"计算法",{"key":28,"text":544,"correct":26},"估算法",{"key":31,"text":546,"correct":22},"经验法",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":186,"analysis":34},981419,"膨胀土地基处理的方法通常有（ ）。",[551,553,555,557],{"key":20,"text":552,"correct":26},"换土及砂石垫层",{"key":24,"text":554,"correct":26},"墩基或柱基",{"key":28,"text":556,"correct":26},"桩基",{"key":31,"text":558,"correct":22},"水泥压浆",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":73,"analysis":34},981420,"下列（ ）是膨胀土场地的工程地质特征。",[563,565,567,569],{"key":20,"text":564,"correct":26},"自然条件下呈坚硬或硬塑状态，裂隙较发育，裂隙中充填有灰白灰绿色黏土",{"key":24,"text":566,"correct":22},"多出露于一阶阶地或地形低洼处，地形有小的台阶或陡坝",{"key":28,"text":568,"correct":26},"常见浅层塑性滑坡和地裂",{"key":31,"text":570,"correct":26},"建筑物裂缝随气候变化而张开和闭合",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":98,"analysis":34},981421,"下列关于膨胀土工程特性指标的叙述正确的是（ ）。",[575,577,579,581],{"key":20,"text":576,"correct":26},"自由膨胀率用于判定黏性土在无结构力影响下的膨胀潜势",{"key":24,"text":578,"correct":26},"膨胀率用于评价膨胀土地基的分级变形量",{"key":28,"text":580,"correct":22},"收缩系数主要用于膨胀土地基的沉降量计算",{"key":31,"text":582,"correct":26},"膨胀力可用于计算地基膨胀变形量以及确定地基承载力",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":47,"analysis":34},981422,"膨胀土的地基与基础的计算原则有（ ）。",[587,589,591,593],{"key":20,"text":588,"correct":26},"对荷载较大的建筑物用现场浸水载荷试验方法确定",{"key":24,"text":590,"correct":22},"可用固结排水三轴剪强度指标按现行地基基础设计规范中有关规定计算承载力",{"key":28,"text":592,"correct":22},"中心荷载下，应满足：基底压力＜地基承载力设计值+膨胀力",{"key":31,"text":594,"correct":26},"膨胀土地基的膨胀变形量应取基础某点的最大膨胀上升量",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":510,"analysis":34},981423,"进行膨胀土坡地上的建筑物地基稳定性验算时，应注意的问题有（ ）。",[599,601,603,605],{"key":20,"text":600,"correct":26},"土质均匀且无节理面时，按圆弧滑动法验算",{"key":24,"text":602,"correct":26},"土层较薄，土层与岩层间存在软弱面时，取软弱层为滑动面进行验算",{"key":28,"text":604,"correct":22},"层状构造膨胀土，层面与坡面交角小于30°时，应验算层面稳定性",{"key":31,"text":606,"correct":22},"稳定性安全系数宜取1. 25 ~ 1. 5",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":98,"analysis":34},981424,"有膨胀土地区的公路挖方边坡设计应遵循以下（ ）原则。",[611,613,615,617],{"key":20,"text":612,"correct":26},"尽量避免高边坡，一般应在10m以内",{"key":24,"text":614,"correct":26},"边坡坡率应缓于1:1. 5",{"key":28,"text":616,"correct":22},"高边坡不设平台，一般采用一坡到顶",{"key":31,"text":618,"correct":26},"坡脚要加固，一般采用换填压实法",{"id":620,"libraryId":5,"type":15,"typeLabel":16,"stem":621,"options":622,"answer":98,"analysis":34},981425,"膨胀土地基变形量的取值符合的规定是（ ）。",[623,625,627,629],{"key":20,"text":624,"correct":26},"膨胀变形量应取基础某点的最大膨胀上升量",{"key":24,"text":626,"correct":26},"收缩变形量应取基础某点的最大收缩下沉量",{"key":28,"text":628,"correct":22},"胀缩变形量应取基础某点的最大膨胀上升量与最大收缩下沉量之差",{"key":31,"text":630,"correct":26},"变形差应取相邻两基础的变形量之差",[632,636,639,642,645,648],{"id":633,"name":634,"category":7,"favorite":635},1,"领导干部任职前廉政法规知识测试题",92,{"id":637,"name":638,"category":7,"favorite":633},595,"建筑结构与设备",{"id":640,"name":641,"category":7,"favorite":633},715,"招标采购专业知识与法律法规",{"id":643,"name":644,"category":7,"favorite":633},848,"市政方向-通用基础",{"id":646,"name":647,"category":7,"favorite":8},534,"BIM工程师",{"id":649,"name":647,"category":7,"favorite":8},535]