[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-709-24":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":632},{"id":5,"name":6,"category":7,"favorite":8},709,"岩土专业知识","建筑工程",0,24,50,1370,[13,35,48,61,74,86,98,110,123,135,147,160,173,185,197,210,223,235,247,259,271,283,295,308,320,332,344,356,368,380,392,404,416,428,440,452,464,476,488,500,512,524,536,548,560,572,584,596,608,620],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":33,"analysis":34},981326,2,"多选题","铁路路堑山体采用抗滑桩支护时，须符合的要求有（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","提高滑坡体的稳定系数，达到规定的安全值",true,{"key":24,"text":25,"correct":22},"B","保证滑坡体不越过桩顶或从桩间滑动",{"key":27,"text":28,"correct":22},"C","不产生新的深层滑动",{"key":30,"text":31,"correct":32},"D","滑坡体表面不产生新的裂缝",false,"ABC","",{"id":36,"libraryId":5,"type":15,"typeLabel":16,"stem":37,"options":38,"answer":47,"analysis":34},981327,"路基设计应符合的要求有（ ）。",[39,41,43,45],{"key":20,"text":40,"correct":22},"悬崖陡坡地段的三、四级公路，当山体岩石整体性好时，可采用半山洞",{"key":24,"text":42,"correct":22},"铺筑沥青混凝土路面的一级公路填方路基下路床的填料CBR值不宜小于5",{"key":27,"text":44,"correct":32},"铺筑沥青混凝土路面的三级公路挖方路基上路床的压实度不宜小于94%",{"key":30,"text":46,"correct":32},"路床填料最大粒径应小于200mm","AB",{"id":49,"libraryId":5,"type":15,"typeLabel":16,"stem":50,"options":51,"answer":60,"analysis":34},981328,"关于粉煤灰路堤的设计，下列说法错误的是（）。",[52,54,56,58],{"key":20,"text":53,"correct":32},"粉煤灰路堤是指全部采用粉煤灰或部分采用粉煤灰填筑的路堤",{"key":24,"text":55,"correct":22},"任何等级的公路路堤严禁采用烧失量大于20%的粉煤灰",{"key":27,"text":57,"correct":32},"粉煤灰路堤设计时，主要设计参数包括最大干密度、最优含水量、内摩擦角、内聚力、渗透系数、压缩系数、毛隙上升高度等",{"key":30,"text":59,"correct":22},"对高度在10m以上的粉煤灰路堤应验算路堤自身的稳定性","BD",{"id":62,"libraryId":5,"type":15,"typeLabel":16,"stem":63,"options":64,"answer":73,"analysis":34},981329,"《碾压式土石坝设计规范》评定软黏土的标准有（）。",[65,67,69,71],{"key":20,"text":66,"correct":22},"液性指数IL＞0.75",{"key":24,"text":68,"correct":32},"无侧限抗压强度qu＜100kPa",{"key":27,"text":70,"correct":22},"标准贯入击数N63.5≤4",{"key":30,"text":72,"correct":32},"灵敏度St≥6","AC",{"id":75,"libraryId":5,"type":15,"typeLabel":16,"stem":76,"options":77,"answer":73,"analysis":34},981330,"下列关于对土石坝防渗土料的要求中正确的有（ ）。",[78,80,82,84],{"key":20,"text":79,"correct":22},"均质土坝的渗透系数不大于1×10-4cm\u002Fs",{"key":24,"text":81,"correct":32},"水溶盐含量（指易溶盐和中溶盐，按质量计)不大于5%",{"key":27,"text":83,"correct":22},"有较好的塑性及渗透稳定性，浸水与失水时体积变化小",{"key":30,"text":85,"correct":32},"心墙和斜墙的渗透系数不小于1×10-6cm\u002Fs",{"id":87,"libraryId":5,"type":15,"typeLabel":16,"stem":88,"options":89,"answer":33,"analysis":34},981331,"设计土石坝上游护坡时，所根据的经济技术的因素有（ )。",[90,92,94,96],{"key":20,"text":91,"correct":22},"漂浮物和冰层的撞击及冻冰的挤压",{"key":24,"text":93,"correct":22},"顺坝水流冲刷",{"key":27,"text":95,"correct":22},"波浪淘刷",{"key":30,"text":97,"correct":32},"冻胀干裂及蚁鼠等动物破坏",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":33,"analysis":34},981332,"下列关于碾压式土石坝的反滤料应符合的要求中正确的有（ ）。",[102,104,106,108],{"key":20,"text":103,"correct":22},"质地致密、抗水性和抗风化性能满足工程运用条件要求",{"key":24,"text":105,"correct":22},"具有要求的级配",{"key":27,"text":107,"correct":22},"具有要求的透水性",{"key":30,"text":109,"correct":32},"反滤料和排水体料中粒径小于0.095mm的颗粒含量应不超过5%",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":122,"analysis":34},981333,"下列在关于路堤基底处理的说法正确的是（ ）。",[114,116,118,120],{"key":20,"text":115,"correct":22},"地基顶面有树根草皮和树根、耕作物、腐植土时应予清除",{"key":24,"text":117,"correct":22},"由于地表水或地下水影响路基稳定时，路堤基底范围内应采取拦截、引排等措施",{"key":27,"text":119,"correct":32},"由于地表水或地下水影响路基稳定时，路堤基底范围内可采取在路堤底部填筑透水 性较差材料的措施",{"key":30,"text":121,"correct":22},"路堤在地面横坡较缓、基底土密实的条件下，可直接填筑在天然地面上","ABD",{"id":124,"libraryId":5,"type":15,"typeLabel":16,"stem":125,"options":126,"answer":33,"analysis":34},981334,"枢纽中的泄水建筑物应能满足设计规定的运用条件和要求，其中枢纽中的泄水建筑物泄洪能力必须满足（ ）。",[127,129,131,133],{"key":20,"text":128,"correct":22},"宣泄洪水要求",{"key":24,"text":130,"correct":22},"排沙要求",{"key":27,"text":132,"correct":22},"排污要求",{"key":30,"text":134,"correct":32},"环境要求",{"id":136,"libraryId":5,"type":15,"typeLabel":16,"stem":137,"options":138,"answer":73,"analysis":34},981335,"对公路填方路基填料选择及压实度的要求，下列叙述正确的是（ ）。",[139,141,143,145],{"key":20,"text":140,"correct":22},"一级公路上路堤填料采用细粒大填筑时CBR值不应小于4",{"key":24,"text":142,"correct":32},"应优先选用分选较好，粒径单一的粗粒土作为路基填料",{"key":27,"text":144,"correct":22},"二级公路上路堤压实度不应小于94%",{"key":30,"text":146,"correct":32},"采用沥青混疑土的四级公路下路堤压实度不应小于90%",{"id":148,"libraryId":5,"type":15,"typeLabel":16,"stem":149,"options":150,"answer":159,"analysis":34},981336,"关于膨胀土的性质，下列哪些选项是正确的？（ ）",[151,153,155,157],{"key":20,"text":152,"correct":32},"当含水量相同时，上覆压力大时膨胀量大，上覆压力小时膨胀量小",{"key":24,"text":154,"correct":22},"当上覆压力相同时，含水量高的膨胀量大，含水量小的膨胀量小",{"key":27,"text":156,"correct":22},"当上覆压力超过膨胀力时土不会产生膨胀，只会出现压缩",{"key":30,"text":158,"correct":22},"常年地下水位以下的膨胀土的膨胀量为零","BCD",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":172,"analysis":34},981337,"在下列哪些情况下，膨胀土地基变形量可仅按收缩变形计算确定？（ ）",[164,166,168,170],{"key":20,"text":165,"correct":22},"经常受高温作用的地基",{"key":24,"text":167,"correct":32},"经常有水浸湿的地基",{"key":27,"text":169,"correct":32},"地面有覆盖且无蒸发可能时",{"key":30,"text":171,"correct":22},"离地面lm处地基土的天然含水量大于1.2倍塑限含水量","AD",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":33,"analysis":34},981338,"关于黄土湿陷起始压力Psh的论述中，下列哪些选项是正确的？（ ）",[177,179,181,183],{"key":20,"text":178,"correct":22},"湿陷性黄土浸水饱和，开始出现湿陷时的压力",{"key":24,"text":180,"correct":22},"测定自重湿陷系数试验时，需分级加荷至试样上覆土的饱和自重压力，此时的饱和自重压力即为湿陷起始压力",{"key":27,"text":182,"correct":22},"室内测定湿陷起始压力可选用单线法压缩试验或双线法压缩试验",{"key":30,"text":184,"correct":32},"现场测定湿陷起始压力可选用单线法静载荷试验或双线法静载荷试验",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":33,"analysis":34},981339,"下图为膨胀土试样的膨胀率与压力关系曲线如图8-2所示，根据图示内容判断，下列哪些选项是正确的？ ( )",[189,191,193,195],{"key":20,"text":190,"correct":22},"自由膨胀率约为8. 4%",{"key":24,"text":192,"correct":22},"50kPa压力下的膨胀率约为4%",{"key":27,"text":194,"correct":22},"膨胀力约为110kPa",{"key":30,"text":196,"correct":32},"150kPa压力下的膨胀力约为110kPa",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":209,"analysis":34},981340,"关于采空区地表移动盆地的特征，下列哪些选项是正确的？（ ）",[201,203,205,207],{"key":20,"text":202,"correct":22},"地表移动盆地的范围总是比采空区面积大",{"key":24,"text":204,"correct":32},"地表移动盆地的形状总是对称于采空区",{"key":27,"text":206,"correct":22},"移动盆地中间区地表下沉最大",{"key":30,"text":208,"correct":22},"移动盆地区内边缘区产生压缩变形，外边缘区产生拉伸变形","ACD",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":222,"analysis":34},981341,"下列（ ）指标是膨胀土的工程特性指标。",[214,216,218,220],{"key":20,"text":215,"correct":32},"含水比",{"key":24,"text":217,"correct":22},"收缩系数",{"key":27,"text":219,"correct":22},"膨胀率",{"key":30,"text":221,"correct":32},"缩限","BC",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":122,"analysis":34},981342,"对滑坡推力计算的下列要求中正确的是（ ）。",[227,229,231,233],{"key":20,"text":228,"correct":22},"应选择平行于滑动方向的具有代表性的断面计算，一般不少于2个断面且应有一个是主断面",{"key":24,"text":230,"correct":22},"滑坡推力作用点可取在滑体厚度1\u002F2处",{"key":27,"text":232,"correct":32},"当滑坡具有多层滑动面时。应取最深的滑动面确定滑坡推力",{"key":30,"text":234,"correct":22},"应采用试验和反算并结合当地经验合理地确定滑动面的抗剪强度",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":172,"analysis":34},981343,"在湿陷性黄土场地进行建筑时，按《湿陷性黄土地区建筑规范》（GB50025—2004），若满足下列（）选项所列的条件，各类建筑物均可按一般地区规定进行设计。",[239,241,243,245],{"key":20,"text":240,"correct":22},"在非自重湿陷性黄土场地，地基内各土层湿陷起始压力均大于其附加压力与上覆土层饱和自重压力之和",{"key":24,"text":242,"correct":32},"地基湿陷量的计算值等于100mm",{"key":27,"text":244,"correct":32},"地基湿陷量的计算值等于70mm",{"key":30,"text":246,"correct":22},"地基湿陷量的计算值小于或等于50mm",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":33,"analysis":34},981344,"在膨胀土地区建挡土墙，按《膨胀土地区建筑技术规范》（GBJ 112—1987）,下列措施中 ( )是正确的。",[251,253,255,257],{"key":20,"text":252,"correct":22},"基坑坑底用混凝土封闭，墙顶面作成平台并铺设砼防水层",{"key":24,"text":254,"correct":22},"挡土墙设变形缝及泄水孔变形，缝间距7.0m",{"key":27,"text":256,"correct":22},"用非膨胀性土与透水性强的填料作为墙背回填土料",{"key":30,"text":258,"correct":32},"挡土墙高6.0m",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":122,"analysis":34},981345,"在膨胀土地区的公路挖方边坡设计应遵循以下（ ）选项中的原则。",[263,265,267,269],{"key":20,"text":264,"correct":22},"尽量避免高边坡，一般应在10m以内",{"key":24,"text":266,"correct":22},"边坡坡率应缓于1:1.5",{"key":27,"text":268,"correct":32},"高边坡不设平台，一般采用一坡到顶",{"key":30,"text":270,"correct":22},"坡脚要加固，一般采用换填压密法等",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":222,"analysis":34},981346,"采空区形成地表移动盆地，其位置和形状与矿层倾角大小有关，当矿层为急倾斜时，下列（ ）叙述是正确的。",[275,277,279,281],{"key":20,"text":276,"correct":32},"盆地水平移动值较小",{"key":24,"text":278,"correct":22},"盆地中心向倾斜方向偏移",{"key":27,"text":280,"correct":22},"盆地发育对称于矿层走向",{"key":30,"text":282,"correct":32},"盆地位置与采空区位置相对应",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":60,"analysis":34},981347,"隧道位于岩溶垂直渗流带地段，隧道顶部地面发育岩溶洼地时，适宜于采用以下 ( )方法估算地下涌水量。",[287,289,291,293],{"key":20,"text":288,"correct":32},"地下水动力学法",{"key":24,"text":290,"correct":22},"水均衡法",{"key":27,"text":292,"correct":32},"洼地入渗法",{"key":30,"text":294,"correct":22},"水文地质比拟法",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":307,"analysis":34},981348,"预应力锚索常用于边坡加固工程，下列（ ）选项是不宜的。",[299,301,303,305],{"key":20,"text":300,"correct":32},"设计描固力小于容许锚固力",{"key":24,"text":302,"correct":32},"锚索锚固段采用紧箍环和扩张环，注浆后形成枣核状",{"key":27,"text":304,"correct":22},"采用孔口注浆法，注浆压力不小于0.6~0.8MPa",{"key":30,"text":306,"correct":22},"当孔内砂浆达到设计强度的70%后，一次张拉达到设计应力","CD",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":47,"analysis":34},981349,"在下列关于石灰岩溶蚀机理的分析中，( )提法是正确的。",[312,314,316,318],{"key":20,"text":313,"correct":22},"石灰岩溶蚀速度与C02 扩散进入水中的速度有关",{"key":24,"text":315,"correct":22},"石灰岩溶蚀速度随着温度增高加快",{"key":27,"text":317,"correct":32},"降水通过富含有机质的土壤下渗后溶蚀作用减弱",{"key":30,"text":319,"correct":32},"石灰化的成因是因为岩溶泉水在出口处吸收外界CO2所致",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":47,"analysis":34},981350,"根据《铁路工程不良地质勘察规程》(TB10027—2001),黏性泥石流堆积物的块石碎石在泥桨中分布的结构特征符合下列（ ）类型。",[324,326,328,330],{"key":20,"text":325,"correct":22},"块石碎石在细颗粒物质中呈不接触的悬浮状结构",{"key":24,"text":327,"correct":22},"块石碎石在细颗粒物质中呈支撑接触的支撑状结构",{"key":27,"text":329,"correct":32},"块石碎石间有较多点和较大面积相互接触的叠置状结构",{"key":30,"text":331,"correct":32},"块石碎石互相镶嵌接触的镶嵌状结构",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":47,"analysis":34},981351,"季节性冻土地区形成路基翻浆病害的主要原因有（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":22},"地下水位过高及毛细上升",{"key":24,"text":339,"correct":22},"路基排水条件差，地表积水，路基土含水量过高",{"key":27,"text":341,"correct":32},"路面结构层厚度达不到按允许冻胀值确定的防冻层厚度要求",{"key":30,"text":343,"correct":32},"采用了粗粒土填筑路基",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":159,"analysis":34},981352,"下列（ ）属于不稳定滑坡的地貌特征。",[348,350,352,354],{"key":20,"text":349,"correct":32},"滑坡后壁较高，植被良好",{"key":24,"text":351,"correct":22},"滑坡体上台坎明显，土体比较松散",{"key":27,"text":353,"correct":22},"滑坡两侧的自然沟谷切割较深，谷底基岩出露",{"key":30,"text":355,"correct":22},"地面泉水和湿地较多，滑坡舌部泉水流量不稳定",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":209,"analysis":34},981353,"为防止自重湿陷性黄土所产生的路基病害，需要进行工程处理，一般可以采用下列处理措施中的（ ）。",[360,362,364,366],{"key":20,"text":361,"correct":22},"路基两侧的排水沟应进行严格防渗处理",{"key":24,"text":363,"correct":32},"采用地下排水沟排除地下水",{"key":27,"text":365,"correct":22},"采用预浸水法消除地基土的湿陷性",{"key":30,"text":367,"correct":22},"采用重锤夯实强夯或挤密法消除地基土的湿陷性",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":33,"analysis":34},981354,"对正规的大型煤矿采空区稳定性评价时，应具备（ ）基本资料。",[372,374,376,378],{"key":20,"text":373,"correct":22},"井上下对照图，包括地面、地形、地物、井下开采范围、采深、采厚等",{"key":24,"text":375,"correct":22},"开采进度图表，包括开采时间、开采方法、顶底板管理方法等",{"key":27,"text":377,"correct":22},"地面变形的观测成果，包括各时段各测点的下沉和水平位移等",{"key":30,"text":379,"correct":32},"煤层的物理力学特性，包括密度、硬度、抗压强度、抗剪强度等",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":307,"analysis":34},981355,"膨胀土地基上建筑物变形特征有（ ）。",[384,386,388,390],{"key":20,"text":385,"correct":32},"建筑物建成若干年后才出现裂缝",{"key":24,"text":387,"correct":32},"楼房比平房开裂严重",{"key":27,"text":389,"correct":22},"裂缝多呈正八字，下宽上窄",{"key":30,"text":391,"correct":22},"大旱年或长期多雨建筑物变形加剧",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":307,"analysis":34},981356,"黄土的湿陷起始压力Psh在地基评价中起的作用有（ ）。",[396,398,400,402],{"key":20,"text":397,"correct":32},"计算总湿陷量Δs",{"key":24,"text":399,"correct":32},"计算自重湿陷量Δxs",{"key":27,"text":401,"correct":22},"根据基底压力及埋深评价是否应进行地基处理",{"key":30,"text":403,"correct":22},"根据土层埋藏深度评价是否是自重湿陷性黄土",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":222,"analysis":34},981357,"下列关于坡地场地上的建筑物的地基稳定性验算的叙述正确的是（ ）。",[408,410,412,414],{"key":20,"text":409,"correct":32},"可不考虑建筑物和堆料的荷载",{"key":24,"text":411,"correct":22},"土质均匀且无节理时，按圆弧滑动法验算",{"key":27,"text":413,"correct":22},"土层较薄且间夹软弱层时，取软弱层面为滑动面进行验算",{"key":30,"text":415,"correct":32},"层状构造的膨胀土，如果层面与坡面斜交且交角大于45°,应验算层面的稳定性",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":172,"analysis":34},981358,"对主要线路方案所经过的采空区，当有关资料缺乏，采用勘探方法很难查明采空区的基本特征，必要时可采用定位观测方法，直接查明地表变化特征、变形规律和发展趋势。 定位观测方法指（ ）。",[420,422,424,426],{"key":20,"text":421,"correct":22},"平行矿层走向的观测线，应有一条测线通过预计最大下沉值的位置",{"key":24,"text":423,"correct":32},"垂直矿层走向的观测线，一般不应少于12条",{"key":27,"text":425,"correct":32},"观测点应等间距布置,其间距按表8- 2进行",{"key":30,"text":427,"correct":22},"观测线宜平行和垂直矿层走向成直线布置，其长度应超过移动盆地的范围",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":122,"analysis":34},981359,"下列各项属于岩溶发育的必备条件的是（ ）。",[432,434,436,438],{"key":20,"text":433,"correct":22},"可溶性岩层",{"key":24,"text":435,"correct":22},"含CO2的地下水",{"key":27,"text":437,"correct":32},"强烈的构造运动",{"key":30,"text":439,"correct":22},"节理、裂隙等渗水通道",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":209,"analysis":34},981360,"关于在岩溶地区修筑土石坝，下列说法正确的是（ ）。",[444,446,448,450],{"key":20,"text":445,"correct":22},"大面积溶蚀但未形成溶洞的可做铺盖防渗",{"key":24,"text":447,"correct":32},"对深层有溶洞的坝基可不必进行处理",{"key":27,"text":449,"correct":22},"浅层的溶洞宜挖除或只挖除洞内的破碎岩石和充填物，用浆砌石或混凝土堵塞",{"key":30,"text":451,"correct":22},"对深层的溶洞可采用灌浆方法处理或用混凝土防渗墙处理",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":47,"analysis":34},981361,"下列发生岩爆的相关因素中，( )是必领具备的决定性条件。",[456,458,460,462],{"key":20,"text":457,"correct":22},"岩性完整",{"key":24,"text":459,"correct":22},"高地应力",{"key":27,"text":461,"correct":32},"洞室埋深",{"key":30,"text":463,"correct":32},"开挖断面形状不规则",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":222,"analysis":34},981362,"下列关于岩溶发育强弱的说法正确的是（ ）。",[468,470,472,474],{"key":20,"text":469,"correct":32},"可溶性岩层越薄，岩溶发育越强烈",{"key":24,"text":471,"correct":22},"可溶性岩层的质地愈纯，岩溶发育愈强烈",{"key":27,"text":473,"correct":22},"岩溶发育的强弱与可溶性岩石的结晶颗粒的粗细有直接关系",{"key":30,"text":475,"correct":32},"含泥质或其他杂质的岩层岩溶发育较强烈",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":209,"analysis":34},981363,"下列关于岩溶和土洞的关系不正确的是（ ）。",[480,482,484,486],{"key":20,"text":481,"correct":22},"有岩溶必然有土洞",{"key":24,"text":483,"correct":32},"土洞发育区必然是岩溶发育区",{"key":27,"text":485,"correct":22},"岩溶和土洞之间没有关系",{"key":30,"text":487,"correct":22},"有土洞不一定有岩溶",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":73,"analysis":34},981364,"岩溶形态是水的溶蚀能力与可溶岩的抗蚀能力在空间和时间上相互作用的结果，可定性地表征岩溶发育的强度。下列属于地表岩溶形态的是（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":22},"盲谷",{"key":24,"text":495,"correct":32},"天窗",{"key":27,"text":497,"correct":22},"漏斗",{"key":30,"text":499,"correct":32},"溶泉",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":222,"analysis":34},981365,"下列关于岩溶发育的规律不合理的是（ ）。",[504,506,508,510],{"key":20,"text":505,"correct":32},"质纯层厚的岩层岩溶发育强烈，形态齐全，规模较大",{"key":24,"text":507,"correct":22},"可溶盐与非可溶盐的接触带处岩溶一般不发育",{"key":27,"text":509,"correct":22},"新构造运动，地壳强烈上升区，水平岩溶较发育",{"key":30,"text":511,"correct":32},"大气降水丰富，气候潮湿地区，岩溶易发育",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":209,"analysis":34},981366,"半定量或定量评价岩溶地基稳定性的方法包括（ ）。",[516,518,520,522],{"key":20,"text":517,"correct":22},"溶洞顶板坍塌自行填塞法",{"key":24,"text":519,"correct":32},"数值解（如有限元法、有限差分法 ）",{"key":27,"text":521,"correct":22},"结构力学近似分析法",{"key":30,"text":523,"correct":22},"成拱分析法",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":172,"analysis":34},981367,"滑坡要素主要包括下列（ ）。",[528,530,532,534],{"key":20,"text":529,"correct":22},"滑坡体、滑坡周界、滑坡壁",{"key":24,"text":531,"correct":32},"滑坡台阶和滑坡梗",{"key":27,"text":533,"correct":32},"滑动角",{"key":30,"text":535,"correct":22},"滑坡舌、滑动鼓丘、滑坡轴",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":209,"analysis":34},981368,"为滑坡治理设计抗滑桩需要用到的岩土参数有（）。",[540,542,544,546],{"key":20,"text":541,"correct":22},"滑面的c、φ值",{"key":24,"text":543,"correct":32},"抗滑桩桩端的极限端阻力和锚固段极限侧阻力",{"key":27,"text":545,"correct":22},"锚固段地基的横向容许承载力",{"key":30,"text":547,"correct":22},"锚固段的地基系数",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":209,"analysis":34},981369,"下列（ ）是常用的滑坡治理措施。",[552,554,556,558],{"key":20,"text":553,"correct":22},"地面排水",{"key":24,"text":555,"correct":32},"地下排水",{"key":27,"text":557,"correct":22},"减重与反压",{"key":30,"text":559,"correct":22},"坡面防护",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":122,"analysis":34},981370,"下列属于按滑动面特征分类的滑坡的是（ ）。",[564,566,568,570],{"key":20,"text":565,"correct":22},"均匀滑坡",{"key":24,"text":567,"correct":22},"切层滑坡",{"key":27,"text":569,"correct":32},"推动式滑坡",{"key":30,"text":571,"correct":22},"顺层滑坡",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":122,"analysis":34},981371,"关于防治滑坡的处理措施，下列说法正确的是（ ）。",[576,578,580,582],{"key":20,"text":577,"correct":22},"设置排水沟以防止地面水浸入滑坡地段",{"key":24,"text":579,"correct":22},"采用重力式抗滑挡墙，墙的基础底面埋置于滑通面以下的稳定土（岩）层中",{"key":27,"text":581,"correct":32},"对滑体采用水泥土搅拌法处理",{"key":30,"text":583,"correct":22},"在滑体主动区卸载或在滑体阻滑区段增加竖向荷载",{"id":585,"libraryId":5,"type":15,"typeLabel":16,"stem":586,"options":587,"answer":209,"analysis":34},981372,"分布于滑坡体后部或两级滑坡体之间呈弧形断续展布的裂缝属于（ ）。",[588,590,592,594],{"key":20,"text":589,"correct":22},"主裂缝",{"key":24,"text":591,"correct":32},"拉张裂缝",{"key":27,"text":593,"correct":22},"剪切裂缝",{"key":30,"text":595,"correct":22},"鼓胀裂缝",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":172,"analysis":34},981373,"根据《岩土工程勘察规范》(GB 50021-2001) (2009年版），下列关于各类危岩和崩塌的岩土工程评价说法正确的是（ ）。",[600,602,604,606],{"key":20,"text":601,"correct":22},"规模小、破坏后果不严重的，可作为工程场地，但应对不稳定危岩采取治理措施",{"key":24,"text":603,"correct":32},"规模较大、破坏后果严重的，不可作为工程场地，线路应绕避",{"key":27,"text":605,"correct":32},"规模较小、破坏后果严重的，应对可能产生崩塌的危岩进行加固处理，线路应采取防护措施",{"key":30,"text":607,"correct":22},"规模大、破坏后果严重、难于治理的，不宜作为工程场地，线路应绕避",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":172,"analysis":34},981374,"对滑坡进行勘探或测试时，应注意的问题有（ ）。",[612,614,616,618],{"key":20,"text":613,"correct":22},"滑坡勘探采用物探、钻探、坑探相结合的方法，必要时可采用井探或洞探",{"key":24,"text":615,"correct":32},"勘探点应沿滑坡主轴和平行主轴方向布置",{"key":27,"text":617,"correct":32},"在滑坡体外围不应布置勘探点",{"key":30,"text":619,"correct":22},"当无法采取滑动带原状土样时，可采取保持天然含水量的扰动土样，做重塑土样试验",{"id":621,"libraryId":5,"type":15,"typeLabel":16,"stem":622,"options":623,"answer":172,"analysis":34},981375,"滑坡定测阶段的工作要求有（ ）。",[624,626,628,630],{"key":20,"text":625,"correct":22},"滑坡定测时，地质调绘应査明地形地貌、地质构造、地层岩性、物质成份、水文地质、软弱夹层等内容",{"key":24,"text":627,"correct":32},"定测阶段每个地质断面不得小于5个勘探孔",{"key":27,"text":629,"correct":32},"对危险性大型滑坡应进行动态观测",{"key":30,"text":631,"correct":22},"综合资料中详细工程地质图比例尺应为1:2000~ 1:5000",[633,637,640,643,646,649],{"id":634,"name":635,"category":7,"favorite":636},1,"领导干部任职前廉政法规知识测试题",92,{"id":638,"name":639,"category":7,"favorite":634},595,"建筑结构与设备",{"id":641,"name":642,"category":7,"favorite":634},715,"招标采购专业知识与法律法规",{"id":644,"name":645,"category":7,"favorite":634},848,"市政方向-通用基础",{"id":647,"name":648,"category":7,"favorite":8},534,"BIM工程师",{"id":650,"name":648,"category":7,"favorite":8},535]