[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-709-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":601},{"id":5,"name":6,"category":7,"favorite":8},709,"岩土专业知识","建筑工程",0,1,50,1370,[13,33,45,57,69,81,93,105,116,128,140,152,160,172,184,196,208,220,232,243,255,267,279,291,303,315,327,335,347,359,371,383,395,407,419,431,442,454,466,478,486,498,510,522,533,545,557,569,577,589],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":26,"analysis":32},980164,"单选题","根据《岩土工程勘察规范》（GB50021 —2001） （2009年版）对工程地质测绘地质点的精度要求，如测绘比例尺选用1:5000，则地质测绘点的实测精度应不低于下列哪个选项？ ( )",[18,22,25,29],{"key":19,"text":20,"correct":21},"A","5m",false,{"key":23,"text":24,"correct":21},"B","10m",{"key":26,"text":27,"correct":28},"C","15m",true,{"key":30,"text":31,"correct":21},"D","20m","",{"id":34,"libraryId":5,"type":9,"typeLabel":15,"stem":35,"options":36,"answer":19,"analysis":32},980165,"基准基床系数KV由下列哪项试验直接测得？（ ）",[37,39,41,43],{"key":19,"text":38,"correct":28},"承压板直径为30cm的平板载荷试验",{"key":23,"text":40,"correct":21},"螺旋板直径为30cm的螺旋板载荷试验",{"key":26,"text":42,"correct":21},"探头长度为24cm的扁铲侧胀试验",{"key":30,"text":44,"correct":21},"旁压器直径为9cm的旁压试验",{"id":46,"libraryId":5,"type":9,"typeLabel":15,"stem":47,"options":48,"answer":26,"analysis":32},980166,"下列各地质年代排列顺序中，哪个选项是正确的？（ ）",[49,51,53,55],{"key":19,"text":50,"correct":21},"三叠纪、泥盆纪、白垩纪、奥陶纪",{"key":23,"text":52,"correct":21},"泥盆纪、奥陶纪、白垩纪、三叠纪",{"key":26,"text":54,"correct":28},"白垩纪、三叠纪、泥盆纪、奥陶纪",{"key":30,"text":56,"correct":21},"奥陶纪、白垩纪、三叠纪、泥盆纪",{"id":58,"libraryId":5,"type":9,"typeLabel":15,"stem":59,"options":60,"answer":26,"analysis":32},980167,"利用已有遥感资料进行工程地质测绘时，下列哪个选项的工作流程是正确的？（ ）",[61,63,65,67],{"key":19,"text":62,"correct":21},"踏勘→初步解译→验证和成图",{"key":23,"text":64,"correct":21},"初步解译→详细解释→验证和成图",{"key":26,"text":66,"correct":28},"初步解译→踏勘和验证→成图",{"key":30,"text":68,"correct":21},"踏勘→初步解译→详细解释和成图",{"id":70,"libraryId":5,"type":9,"typeLabel":15,"stem":71,"options":72,"answer":23,"analysis":32},980168,"某建筑地基存在一混合土层，该土层的颗粒最大粒径为200mm。问要在该土层上进行圆形载荷板的现场载荷试验，承压板面积至少应不小于下列哪个选项？（ ）",[73,75,77,79],{"key":19,"text":74,"correct":21},"0. 25m2",{"key":23,"text":76,"correct":28},"0. 5m2",{"key":26,"text":78,"correct":21},"0. 8m2",{"key":30,"text":80,"correct":21},"1. 0m2",{"id":82,"libraryId":5,"type":9,"typeLabel":15,"stem":83,"options":84,"answer":23,"analysis":32},980169,"下列哪个选项应是沉积岩的结构？（ ）",[85,87,89,91],{"key":19,"text":86,"correct":21},"斑状结构",{"key":23,"text":88,"correct":28},"碎屑结构",{"key":26,"text":90,"correct":21},"玻璃质结构",{"key":30,"text":92,"correct":21},"变晶结构",{"id":94,"libraryId":5,"type":9,"typeLabel":15,"stem":95,"options":96,"answer":19,"analysis":32},980170,"反映岩土渗透性大小的吕荣值可由下列哪个选项的试验方法测得？（ ）",[97,99,101,103],{"key":19,"text":98,"correct":28},"压水试验",{"key":23,"text":100,"correct":21},"抽水试验",{"key":26,"text":102,"correct":21},"注水试验",{"key":30,"text":104,"correct":21},"室内变水头渗透试验",{"id":106,"libraryId":5,"type":9,"typeLabel":15,"stem":107,"options":108,"answer":30,"analysis":32},980171,"某峡谷坝址区，场地覆盖层厚度为30m，欲建坝高60m。根据《水利水电工程地质勘察 规范》（GB 50487—2008),在可行性研究阶段，该峡谷区坝址钻孔进入基岩的深度应不小于下列哪个选项的要求？（ ）",[109,110,112,114],{"key":19,"text":24,"correct":21},{"key":23,"text":111,"correct":21},"30m",{"key":26,"text":113,"correct":21},"50m",{"key":30,"text":115,"correct":28},"60m",{"id":117,"libraryId":5,"type":9,"typeLabel":15,"stem":118,"options":119,"answer":30,"analysis":32},980172,"对需要分析侵蚀性二氧化碳的水试样，现场取样后，应立即加入下列哪个选项中的化学物质？（ ）",[120,122,124,126],{"key":19,"text":121,"correct":21},"漂白剂",{"key":23,"text":123,"correct":21},"生石灰",{"key":26,"text":125,"correct":21},"石膏粉",{"key":30,"text":127,"correct":28},"大理石粉",{"id":129,"libraryId":5,"type":9,"typeLabel":15,"stem":130,"options":131,"answer":26,"analysis":32},980173,"通过泥浆泵输送泥浆在圈堤形成的池中填积筑坝，在对其进行施工期稳定分析时，应当采用土的（）强度参数。",[132,134,136,138],{"key":19,"text":133,"correct":21},"固结排水剪（C）",{"key":23,"text":135,"correct":21},"固结不排水剪（CU）",{"key":26,"text":137,"correct":28},"不固结不排水剪（UU）",{"key":30,"text":139,"correct":21},"固结快剪强度",{"id":141,"libraryId":5,"type":9,"typeLabel":15,"stem":142,"options":143,"answer":23,"analysis":32},980174,"港口工程勘察中，在深度15m处有一层厚度4m并处于地下水位以下的粉砂层。实测标准贯击数为15、16、15、19、16、19，问用于该粉砂层密实度评价的标准贯入击数应为（ ）击。",[144,146,148,150],{"key":19,"text":145,"correct":21},"15",{"key":23,"text":147,"correct":28},"16",{"key":26,"text":149,"correct":21},"17",{"key":30,"text":151,"correct":21},"18",{"id":153,"libraryId":5,"type":9,"typeLabel":15,"stem":154,"options":155,"answer":30,"analysis":32},980175,"在进行饱和黏性土三轴压缩试验中，需对剪切应变速率进行控制，对于不同三轴试验方法 剪切应变速率的大小下列说法正确的是（ ）。",[156,157,158,159],{"key":19,"text":19,"correct":21},{"key":23,"text":23,"correct":21},{"key":26,"text":26,"correct":21},{"key":30,"text":30,"correct":28},{"id":161,"libraryId":5,"type":9,"typeLabel":15,"stem":162,"options":163,"answer":26,"analysis":32},980176,"某场地地层主要由粉土构成，在进行现场钻探时需测量地下水位的初见水位和稳定水位，量测稳定水位的时间间隔最小不得小于（ ）h。",[164,166,168,170],{"key":19,"text":165,"correct":21},"3",{"key":23,"text":167,"correct":21},"6",{"key":26,"text":169,"correct":28},"8",{"key":30,"text":171,"correct":21},"12",{"id":173,"libraryId":5,"type":9,"typeLabel":15,"stem":174,"options":175,"answer":30,"analysis":32},980177,"按《港口工程地基规范》（JTJ250—1998）要求，验算港口建筑物饱和软黏土地基承载力时，下列（ ）抗剪强度指标的用法是正确的。",[176,178,180,182],{"key":19,"text":177,"correct":21},"持久状况和短暂状况均采用不排水抗剪强度指标",{"key":23,"text":179,"correct":21},"持久状况和短暂状况均采用固结快剪指标",{"key":26,"text":181,"correct":21},"持久状况采用不排水抗剪强度指标，短暂状况采用固结快剪指标",{"key":30,"text":183,"correct":28},"持久状况采用固结快剪强度指标，短暂状况采用不排水抗剪强度指标",{"id":185,"libraryId":5,"type":9,"typeLabel":15,"stem":186,"options":187,"answer":26,"analysis":32},980178,"据《水利水电工程地质勘察规范》（GB 50487—2008），某水利工程压水试验结果可得土 层透水率为30Lu，据此划分该土层的渗透性分级应属于（ ）。",[188,190,192,194],{"key":19,"text":189,"correct":21},"徽透水",{"key":23,"text":191,"correct":21},"弱透水",{"key":26,"text":193,"correct":28},"中等透水",{"key":30,"text":195,"correct":21},"强透水",{"id":197,"libraryId":5,"type":9,"typeLabel":15,"stem":198,"options":199,"answer":30,"analysis":32},980179,"用于测定基准基床系数的载荷试验承压板边长或直径应接近（ ）m。",[200,202,204,206],{"key":19,"text":201,"correct":21},"1.0",{"key":23,"text":203,"correct":21},"0.8",{"key":26,"text":205,"correct":21},"0.5",{"key":30,"text":207,"correct":28},"0.3",{"id":209,"libraryId":5,"type":9,"typeLabel":15,"stem":210,"options":211,"answer":19,"analysis":32},980180,"某滞洪区本年滞洪时游积了3.0m厚的泥砂，现进行勘察，下列（ ）选项的考虑是错的。",[212,214,216,218],{"key":19,"text":213,"correct":28},"原地面下原来的正常固结土变成了超固结土",{"key":23,"text":215,"correct":21},"新沉积的泥砂是欠固结土",{"key":26,"text":217,"correct":21},"新沉积的饱和砂土地震时可能液化",{"key":30,"text":219,"correct":21},"与一般第四系土比在同样的物理性质指标状况下，新沉积土的力学性质较差",{"id":221,"libraryId":5,"type":9,"typeLabel":15,"stem":222,"options":223,"answer":26,"analysis":32},980181,"某场地地基土为一强透水层，含水量ω=22%，地下水分析成果PH =5. 4，侵蚀性C02 含量为53.9mg\u002FL,请判定该地下水对混凝土结构的腐蚀性属于下列（ ）等级。",[224,226,228,230],{"key":19,"text":225,"correct":21},"无腐蚀性",{"key":23,"text":227,"correct":21},"弱腐蚀性",{"key":26,"text":229,"correct":28},"中等腐蚀性",{"key":30,"text":231,"correct":21},"强腐蚀性",{"id":233,"libraryId":5,"type":9,"typeLabel":15,"stem":234,"options":235,"answer":23,"analysis":32},980182,"某盐渍土地段地下水位深1.8m,大于该地毛细水强烈上升高度与蒸发强烈影响深度之和，在开挖试坑的当时和曝晒两天后分别沿坑壁分层取样，测定其含水率随深度变化如表1-2所示，该地段毛细水强烈上升高度应是（ ）m。",[236,238,240,241],{"key":19,"text":237,"correct":21},"1.6",{"key":23,"text":239,"correct":28},"1.2",{"key":26,"text":203,"correct":21},{"key":30,"text":242,"correct":21},"0.4",{"id":244,"libraryId":5,"type":9,"typeLabel":15,"stem":245,"options":246,"answer":23,"analysis":32},980183,"对于天然含水量小于塑限含水量湿陷性黄土，确定其地基承载力特征值时可按下列 ( )选项的含水率考虑。",[247,249,251,253],{"key":19,"text":248,"correct":21},"天然含水量",{"key":23,"text":250,"correct":28},"塑限含水量",{"key":26,"text":252,"correct":21},"饱和度为80%的含水量",{"key":30,"text":254,"correct":21},"天然含水量加5%",{"id":256,"libraryId":5,"type":9,"typeLabel":15,"stem":257,"options":258,"answer":23,"analysis":32},980184,"采用塑限含水量18%的粉质黏土作填土土料修高速公路路基，分层铺土碾压时，下列（）含水率相对比较合适。",[259,261,263,265],{"key":19,"text":260,"correct":21},"12%",{"key":23,"text":262,"correct":28},"17%",{"key":26,"text":264,"correct":21},"22%",{"key":30,"text":266,"correct":21},"25%",{"id":268,"libraryId":5,"type":9,"typeLabel":15,"stem":269,"options":270,"answer":19,"analysis":32},980185,"按《岩土工程勘察规范》（GB 50021 —2001 )(2009年版），砂土（粉砂）和粉土的分类界限 是（）。",[271,273,275,277],{"key":19,"text":272,"correct":28},"粒径大于0. 075mm的颗粒质量超过总质量50%的为粉砂，不足50%且塑性指数Ιp≤10的为粉土",{"key":23,"text":274,"correct":21},"粒径大于0.075mm的颗粒质量超过总质量50%的为粉砂，不足50%且塑性指数Ip＞3的为粉土",{"key":26,"text":276,"correct":21},"粒径大于0.1mm的颗粒质量少于总质量75%的为粉砂，不足75%且塑性指数Ip＞3 的为粉土",{"key":30,"text":278,"correct":21},"粒径大于0.1mm的颗粒质量少于总质量75%的为粉砂，不足75%且塑性指数Ιp＞7 的为粉土",{"id":280,"libraryId":5,"type":9,"typeLabel":15,"stem":281,"options":282,"answer":26,"analysis":32},980186,"下列（ ）选项的岩体结构类型不属于《水利水电工程地质勘察规范》（GB 50487— 2008）的岩体结构分类之列。",[283,285,287,289],{"key":19,"text":284,"correct":21},"整体状、块状、次块状结构",{"key":23,"text":286,"correct":21},"巨厚层状、厚层状、中厚层状、互层和薄层结构",{"key":26,"text":288,"correct":28},"风化卸荷状结构和风化碎块状结构",{"key":30,"text":290,"correct":21},"碎块状结构和碎屑状结构",{"id":292,"libraryId":5,"type":9,"typeLabel":15,"stem":293,"options":294,"answer":23,"analysis":32},980187,"在平面地质图中，下列（ ）表示岩层可能向河床下游倾斜且岩层倾角小于河床坡度。",[295,297,299,301],{"key":19,"text":296,"correct":21},"岩层界限与地形等高线一致，V字形尖端指向河的上源",{"key":23,"text":298,"correct":28},"岩层界限不与地形等高线一致，V字形尖端指向河的上源",{"key":26,"text":300,"correct":21},"岩层界限不与地形等高线一致，V字形尖端指向河的下游",{"key":30,"text":302,"correct":21},"岩层界限不受地形影响，接近直线",{"id":304,"libraryId":5,"type":9,"typeLabel":15,"stem":305,"options":306,"answer":26,"analysis":32},980188,"按《岩土工程勘察规范》（GB 50021—2001) (2009年版），用Φ75mm的薄壁取土器在黏性土中取样，应连续一次压入，这就要求钻机最少具有（ ）cm给进行程。",[307,309,311,313],{"key":19,"text":308,"correct":21},"40",{"key":23,"text":310,"correct":21},"60",{"key":26,"text":312,"correct":28},"75",{"key":30,"text":314,"correct":21},"100",{"id":316,"libraryId":5,"type":9,"typeLabel":15,"stem":317,"options":318,"answer":26,"analysis":32},980189,"绘制土的三轴剪切试验成果莫尔一库仑强度包线时，莫尔圆的画法是（）。",[319,321,323,325],{"key":19,"text":320,"correct":21},"在σ轴上以σ3为圆心，以(σ1 -σ3)\u002F2为半径",{"key":23,"text":322,"correct":21},"在σ轴上以σ1为圆心，以(σ1-σ3)为半径",{"key":26,"text":324,"correct":28},"在σ轴上以(σ1+σ3)\u002F2为圆心，以(σ1-σ3)\u002F2为半径",{"key":30,"text":326,"correct":21},"在σ轴上以(σ1-σ3)\u002F2为圆心，以(σ1+σ3)\u002F2为半径",{"id":328,"libraryId":5,"type":9,"typeLabel":15,"stem":329,"options":330,"answer":26,"analysis":32},980190,"图1-1表示饱和土等向固结完成后，在&sigma;3不变的条件下，继续增加&sigma;1直至破坏的应力路径，图中的&alpha;角是（ ）。",[331,332,333,334],{"key":19,"text":19,"correct":21},{"key":23,"text":23,"correct":21},{"key":26,"text":26,"correct":28},{"key":30,"text":30,"correct":21},{"id":336,"libraryId":5,"type":9,"typeLabel":15,"stem":337,"options":338,"answer":30,"analysis":32},980191,"图1-3为砂土的颗粒级配曲线，试判断属于下列（ ）类。",[339,341,343,345],{"key":19,"text":340,"correct":21},"a线级配良好，b线级配不良，c线级配不连续",{"key":23,"text":342,"correct":21},"a线级配不连续，b线级配良好，c线级配不良",{"key":26,"text":344,"correct":21},"a线级配不连续，b线级配不良，c线级配良好",{"key":30,"text":346,"correct":28},"a线级配不良，b线级配良好，c线级配不连续",{"id":348,"libraryId":5,"type":9,"typeLabel":15,"stem":349,"options":350,"answer":23,"analysis":32},980192,"图1-4是一幅（ ）原位测试成果的典型曲线。",[351,353,355,357],{"key":19,"text":352,"correct":21},"螺旋板载荷试验曲线",{"key":23,"text":354,"correct":28},"预钻式旁压试验曲线",{"key":26,"text":356,"correct":21},"十字板剪切试验曲线",{"key":30,"text":358,"correct":21},"扁铲侧胀试验曲线",{"id":360,"libraryId":5,"type":9,"typeLabel":15,"stem":361,"options":362,"answer":26,"analysis":32},980193,"下列关于十字板剪切试验成果的应用，说法错误的是()。",[363,365,367,369],{"key":19,"text":364,"correct":21},"可较好地反映饱和软黏性土不排水抗剪强度随深度的变化",{"key":23,"text":366,"correct":21},"可分析确定软黏性土不排水抗剪强度峰值和残余值",{"key":26,"text":368,"correct":28},"所测得的不排水抗剪强度峰值一般较长期强度偏低30%~40%",{"key":30,"text":370,"correct":21},"可根据试验结果计算灵敏度",{"id":372,"libraryId":5,"type":9,"typeLabel":15,"stem":373,"options":374,"answer":23,"analysis":32},980194,"在平面稳定流渗流问题的流网图中，以下（ ）是正确的。",[375,377,379,381],{"key":19,"text":376,"correct":21},"在渗流条件变化处，等势线可以不同的角度与流线相交",{"key":23,"text":378,"correct":28},"不论何种情况下，等势线总与流线正交",{"key":26,"text":380,"correct":21},"流线间的间距越小，表示该处的流速越小",{"key":30,"text":382,"correct":21},"等势线的间距越小，表示该处的水力坡度越小",{"id":384,"libraryId":5,"type":9,"typeLabel":15,"stem":385,"options":386,"answer":30,"analysis":32},980195,"地下水绕过隔水帷幕渗流，试分析帷幕附近的流速，（ ）是正确的。",[387,389,391,393],{"key":19,"text":388,"correct":21},"沿流线流速不变",{"key":23,"text":390,"correct":21},"低水头侧沿流线流速逐渐增大",{"key":26,"text":392,"correct":21},"高水头侧沿流线流速逐渐减小",{"key":30,"text":394,"correct":28},"帷幕底下流速最大",{"id":396,"libraryId":5,"type":9,"typeLabel":15,"stem":397,"options":398,"answer":26,"analysis":32},980196,"在岩土参数标准值计算中，常采用公式 ,此式在统计学中采用的置信概率是（ )。",[399,401,403,405],{"key":19,"text":400,"correct":21},"0.99",{"key":23,"text":402,"correct":21},"0.975",{"key":26,"text":404,"correct":28},"0.95",{"key":30,"text":406,"correct":21},"0.90",{"id":408,"libraryId":5,"type":9,"typeLabel":15,"stem":409,"options":410,"answer":30,"analysis":32},980197,"设天然条件下岩土体的应力，σ1为竖向主应力，σ3为水平向主应力，下列（）是正确的。",[411,413,415,417],{"key":19,"text":412,"correct":21},"σ1恒大于σ3",{"key":23,"text":414,"correct":21},"σ1恒等于σ3",{"key":26,"text":416,"correct":21},"σ1恒小于σ3",{"key":30,"text":418,"correct":28},"σ1＞σ3,σ1 =σ3,σ1 ＜σ3 ,三种情况都可能",{"id":420,"libraryId":5,"type":9,"typeLabel":15,"stem":421,"options":422,"answer":26,"analysis":32},980198,"已知地基极限承载力的计算公式为 对于内摩擦角φ=0的土，其地基承载力系数必然满足( ）组合。",[423,425,427,429],{"key":19,"text":424,"correct":21},"Nγ=0； Nq = 1； Nc =3. 14",{"key":23,"text":426,"correct":21},"Nγ=1； Nq=1； Nc =5. 14",{"key":26,"text":428,"correct":28},"Ny =0； Nq =1； Nc=5. 14",{"key":30,"text":430,"correct":21},"Ny =0； Nq =0； Nc =5. 14",{"id":432,"libraryId":5,"type":9,"typeLabel":15,"stem":433,"options":434,"answer":23,"analysis":32},980199,"图1 -5是拟建场地的外缘设置，6. 2m高的挡土墙，场地土的内摩擦角为30°，若不允许把建筑物的基础置于破坏棱体范围内，则对于平行于挡土墙的外墙基础，当基础宽度为2m埋置深度为1. 0m时，外墙轴线距挡土墙内侧的水平距离不应小于（ ）",[435,436,438,440],{"key":19,"text":165,"correct":21},{"key":23,"text":437,"correct":28},"4",{"key":26,"text":439,"correct":21},"2",{"key":30,"text":441,"correct":21},"3.5",{"id":443,"libraryId":5,"type":9,"typeLabel":15,"stem":444,"options":445,"answer":26,"analysis":32},980200,"某6层建筑物建造在饱和软土地基上，估算地基的最终平均沉降量为180mm，竣工时地基平均沉降量为54mm，竣工时地基土的平均固结度与下列（ ）最为接近。",[446,448,450,452],{"key":19,"text":447,"correct":21},"10%",{"key":23,"text":449,"correct":21},"20%",{"key":26,"text":451,"correct":28},"30%",{"key":30,"text":453,"correct":21},"50%",{"id":455,"libraryId":5,"type":9,"typeLabel":15,"stem":456,"options":457,"answer":30,"analysis":32},980201,"可行性研究勘察，应对拟建场地的（ ）做出评价。",[458,460,462,464],{"key":19,"text":459,"correct":21},"稳定性",{"key":23,"text":461,"correct":21},"安全性",{"key":26,"text":463,"correct":21},"稳定性和安全性",{"key":30,"text":465,"correct":28},"稳定性和适宜性",{"id":467,"libraryId":5,"type":9,"typeLabel":15,"stem":468,"options":469,"answer":23,"analysis":32},980202,"初步判定水和土对建筑材料的腐蚀性，属于（ ）阶段的主要工作。",[470,472,474,476],{"key":19,"text":471,"correct":21},"可行性研究勘察",{"key":23,"text":473,"correct":28},"初步勘察",{"key":26,"text":475,"correct":21},"详细勘察",{"key":30,"text":477,"correct":21},"施工勘察",{"id":479,"libraryId":5,"type":9,"typeLabel":15,"stem":480,"options":481,"answer":26,"analysis":32},980203,"场地较小且无特殊要求的工程可合并勘察阶段。当建筑物平面布置已经确定，且场地或其附近巳有岩土工程资料时，可根据实际情况，直接进行（ ）。",[482,483,484,485],{"key":19,"text":471,"correct":21},{"key":23,"text":473,"correct":21},{"key":26,"text":475,"correct":28},{"key":30,"text":477,"correct":21},{"id":487,"libraryId":5,"type":9,"typeLabel":15,"stem":488,"options":489,"answer":30,"analysis":32},980204,"根据《岩土工程勘察规范》（GB50021 —2001） （2009年版），对于高层建筑详细勘察阶段勘探点的布置原则，下列叙述错误的是（ ）。",[490,492,494,496],{"key":19,"text":491,"correct":21},"勘探点应按建筑物周边线布置，角点和中心点应有勘探点",{"key":23,"text":493,"correct":21},"勘探点间距宜取15?35m",{"key":26,"text":495,"correct":21},"特殊体形的建筑物，应按其体形变化布置勘探点",{"key":30,"text":497,"correct":28},"单幢高层建筑的勘探点不应少于3个",{"id":499,"libraryId":5,"type":9,"typeLabel":15,"stem":500,"options":501,"answer":19,"analysis":32},980205,"对民用建筑岩体洞室进行初步勘察，当岩体基本质量等级为III级围岩时，其勘探孔深应钻入洞底设计标高以下（ ）m。",[502,504,506,508],{"key":19,"text":503,"correct":28},"3 ~5",{"key":23,"text":505,"correct":21},"5 ~8",{"key":26,"text":507,"correct":21},"8~10",{"key":30,"text":509,"correct":21},"10 ~15",{"id":511,"libraryId":5,"type":9,"typeLabel":15,"stem":512,"options":513,"answer":19,"analysis":32},980206,"某高层建筑，宽20m，长60m，地上35层，地下3层，基础埋深12m,预估基底平均压力550kPa。根据邻近建筑物勘察资料，该场地地表下0 ~2m为填土； 2~6m为粉质黏土； 6 ~ 10m为粉土； 10 ~ 11m为黏土； 11 ~ 15m为卵石；15 ~ 25m为粉质黏土； 25?30m为细砂；30?40m为粉土。地下水分二层：第一层3 ~ 4m为上层滞水，第二 层11. 0m为承压水。在下列钻孔布置中，（ ）方案最为合理。",[514,516,518,520],{"key":19,"text":515,"correct":28},"共布置两排钻孔，每排4个，控制性孔2个，孔深42m",{"key":23,"text":517,"correct":21},"共布置6个钻孔，孔深82m,控制性孔3个，孔深42m",{"key":26,"text":519,"correct":21},"共布置6个钻孔，控制性钻孔3个，孔深42m",{"key":30,"text":521,"correct":21},"共布置8个钻孔，控制性孔6个，孔深42m",{"id":523,"libraryId":5,"type":9,"typeLabel":15,"stem":524,"options":525,"answer":23,"analysis":32},980207,"在波速测试中，考虑测试精度、振源能量和土层均匀性等因素，用跨孔法测试孔距，在土层中宜取（ ）m。",[526,528,530,531],{"key":19,"text":527,"correct":21},"1 ~2",{"key":23,"text":529,"correct":28},"2 ~5",{"key":26,"text":505,"correct":21},{"key":30,"text":532,"correct":21},"8~15",{"id":534,"libraryId":5,"type":9,"typeLabel":15,"stem":535,"options":536,"answer":19,"analysis":32},980208,"海港码头工程初步设计阶段勘察，码头不在岸坡明显地区，在确定勘探工作量时，其勘探线应首先考虑按（ ）进行布置。",[537,539,541,543],{"key":19,"text":538,"correct":28},"平行码头长轴方向",{"key":23,"text":540,"correct":21},"平行码头短轴方向",{"key":26,"text":542,"correct":21},"垂直岸坡方向",{"key":30,"text":544,"correct":21},"平行岸坡方向",{"id":546,"libraryId":5,"type":9,"typeLabel":15,"stem":547,"options":548,"answer":23,"analysis":32},980209,"根据《岩土工程勘察规范》（GB 50021—2001) (2009年版），对于废渣材料加高坝的勘察工作布置，叙述错误的是（ ）。",[549,551,553,555],{"key":19,"text":550,"correct":21},"可按堆积规模垂直坝轴线布设不少于三条勘探线",{"key":23,"text":552,"correct":28},"勘探点间距按100m布置",{"key":26,"text":554,"correct":21},"一般勘探孔应进入自然地面以下一定深度",{"key":30,"text":556,"correct":21},"控制性勘探孔深度应能查明可能存在的软弱层",{"id":558,"libraryId":5,"type":9,"typeLabel":15,"stem":559,"options":560,"answer":23,"analysis":32},980210,"根据《岩土工程勘察规范》（GB50021—2001) (2009年版）规定，核电厂的勘察不应包括的阶段是（ ）。",[561,563,565,567],{"key":19,"text":562,"correct":21},"初步设计",{"key":23,"text":564,"correct":28},"详细设计",{"key":26,"text":566,"correct":21},"施工图设计",{"key":30,"text":568,"correct":21},"工程建造",{"id":570,"libraryId":5,"type":9,"typeLabel":15,"stem":571,"options":572,"answer":19,"analysis":32},980211,"根据《岩土工程勘察规范》（GB 50021一2001)(2009年版）勘察时，边坡工程不包括的阶段是（ ）。",[573,574,575,576],{"key":19,"text":471,"correct":28},{"key":23,"text":473,"correct":21},{"key":26,"text":475,"correct":21},{"key":30,"text":477,"correct":21},{"id":578,"libraryId":5,"type":9,"typeLabel":15,"stem":579,"options":580,"answer":23,"analysis":32},980212,"根据《岩土工程勘察规范》（GB 50021—2001）（2009年版），在基坑工程的勘察中，不正确的是（ ）。",[581,583,585,587],{"key":19,"text":582,"correct":21},"勘察深度宜为开挖深度的2?3倍",{"key":23,"text":584,"correct":28},"勘察的平面范围包括全部开挖边界内的范围",{"key":26,"text":586,"correct":21},"在深厚软土区，勘察深度和范围应适当扩大",{"key":30,"text":588,"correct":21},"复杂场地进行地下水治理时，应进专门的水文地质勘察",{"id":590,"libraryId":5,"type":9,"typeLabel":15,"stem":591,"options":592,"answer":23,"analysis":32},980213,"根据《岩土工程勘察规范》（GB 50021-2001) (2009年版），进行桩基础勘察时，对土质地基勘探点间距的要求，叙述错误的是（ ）。",[593,595,597,599],{"key":19,"text":594,"correct":21},"端承桩勘探点间距宜为12~24m",{"key":23,"text":596,"correct":28},"端承桩与摩擦桩勘探点间距宜使持力层层面高差控制在1~2m",{"key":26,"text":598,"correct":21},"摩擦桩勘探点间距宜为20~35m",{"key":30,"text":600,"correct":21},"复杂地基的一柱一桩工程，宜每柱设置勘探点",[602,605,608,611,614,617],{"id":9,"name":603,"category":7,"favorite":604},"领导干部任职前廉政法规知识测试题",92,{"id":606,"name":607,"category":7,"favorite":9},595,"建筑结构与设备",{"id":609,"name":610,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":612,"name":613,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":615,"name":616,"category":7,"favorite":8},534,"BIM工程师",{"id":618,"name":616,"category":7,"favorite":8},535]