[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-981485":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},981485,709,2,"多选题","当荷载具备（）等特点时可定为永久荷载。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","荷载值很大",false,{"key":16,"text":17,"correct":18},"B","荷载值不随时间变化而变化",true,{"key":20,"text":21,"correct":18},"C","荷载值的变化量与荷载平均值相比可以忽略不计",{"key":23,"text":24,"correct":18},"D","荷载值的变化是单调的并能趋于某一限值","BCD","根据《建筑结构荷载规范》（GB 50009-2001) (2006年版）第2. 1. 1条，在结构使用期间，其值不随时间变化，或其变化与平均值相比可以忽略不计，或其变化是单调的并能趋于限值的荷载为永久荷载。",{"id":6,"name":28,"category":29,"favorite":30},"岩土专业知识","建筑工程",0]