[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-981463":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},981463,709,2,"多选题","建设工程直接工程费由( )组成。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","人工费",true,{"key":16,"text":17,"correct":18},"B","管理费",false,{"key":20,"text":21,"correct":14},"C","材料费",{"key":23,"text":24,"correct":18},"D","税金","AC","建设工程直接工程费=接费+其他直接费+现场经费，其中，直接费=人工费+材料费+机械费；其他直接费包括：冬季施工增加费、雨季施工增加费、夜间施工增加费、高原地区施工增加费、沿海地区施工增加费、行车干扰工程施工增加费、施工辅助费；现场经费包括：临时设施费、现场管理费、现场管理费其他单项费用。",{"id":6,"name":28,"category":29,"favorite":30},"岩土专业知识","建筑工程",0]