[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-981458":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},981458,709,2,"多选题","关于发包人及承包人的说法，下列（ ）选项正确。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","发包人可以与总承包人订立建设工程合同",true,{"key":16,"text":17,"correct":14},"B","发包人可以分别与勘察人、设计人、施工人订立勘察、设计、施工承包合同",{"key":19,"text":20,"correct":21},"C","承包人可以将其承包的全部建设工程转包第三人",false,{"key":23,"text":24,"correct":21},"D","承包人可以将其承包的全部建设工程分解成若干部分，以分包的名义分别转包第三人","AB","发包人可以订立总合同，也可和分包商分别订立合同。承包人不得将其承包的全部建设工程转包给第三人或者将其承包的全部建设工程肢解以后以分包的名义分别转包给第三人。",{"id":6,"name":28,"category":29,"favorite":30},"岩土专业知识","建筑工程",0]