[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-981449":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},981449,709,2,"多选题","现场检验一般包括（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","基坑开挖后检验",true,{"key":16,"text":17,"correct":14},"B","地基处理效果检验",{"key":19,"text":20,"correct":14},"C","桩基质量检验",{"key":22,"text":23,"correct":24},"D","滑坡动态监测",false,"ABC","岩土工程检测的主要内容包括：①基槽（坑)开挖后的检验；②地基改良与加固处理过程中及处理后对处理质量、方法、设备、材料及处理效果的检测；③桩(墩）基础质量基承载能力的检测。",{"id":6,"name":28,"category":29,"favorite":30},"岩土专业知识","建筑工程",0]