[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-981394":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},981394,709,2,"多选题","防止地表和建筑物变形，开采工艺方面的措施有（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","采用充填法处置顶板，及时全部充填或两次充填，以减少地表下沉量",true,{"key":16,"text":17,"correct":14},"B","减少开采厚度，或采用条带法开采，使地表变形不超过建筑物的容许极限值",{"key":19,"text":20,"correct":21},"C","应加快推进速度",false,{"key":23,"text":24,"correct":14},"D","增大采空区宽度，使地表移动充分","ABD","防止地表和建筑物变形，应控制开采的推进速度，使其均匀，合理进行协调开采。",{"id":6,"name":28,"category":29,"favorite":30},"岩土专业知识","建筑工程",0]