[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-981324":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},981324,709,2,"多选题","铁路路基发生季节性冻胀应具备的条件有（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","温度低于0&deg;且持续时间较长",false,{"key":16,"text":17,"correct":18},"B","具有起始负温和更低的持续负温",true,{"key":20,"text":21,"correct":18},"C","土体为冻胀土或强冻胀土",{"key":23,"text":24,"correct":18},"D","黏性土的天然含水率明显大于塑限含水率","BCD","",{"id":6,"name":28,"category":29,"favorite":30},"岩土专业知识","建筑工程",0]