[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-981286":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},981286,709,2,"多选题","混凝土预制桩采用锤击法沉桩时，下述说法不正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","桩端位于一般土层时，应以控制桩端设计标高为主，贯入度可作根据",false,{"key":16,"text":17,"correct":18},"B","桩端土层较硬时，可以控制标高为主，贯入度可作根据",true,{"key":20,"text":21,"correct":18},"C","贯入度已达到但桩端标高未达到时，应采取截桩措施",{"key":23,"text":24,"correct":14},"D","对于砂土桩及碎石桩，应采用射水法沉粧","BC","根据《建筑桩基技术规范》（JGJ 94—2008）第7. 4. 6条，B项，桩端土层较硬时，以贯入度控制为主，桩端标高可作根据；C项，贯入度已达到但桩端标高未达到时，应继续锤击3阵，按每阵10击的贯入度不大于设计规定的数值确认，必要时施工控制贯入度应通过试验确定。",{"id":6,"name":28,"category":29,"favorite":30},"岩土专业知识","建筑工程",0]