[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-981277":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},981277,709,2,"多选题","打桩顺序应按下列规定执行（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","对于密集桩群，为减小对周围环境的挤土效应，自四周对称施打",false,{"key":16,"text":17,"correct":18},"B","当一侧有毗邻建筑物时，由毗邻建筑物处向另一方向施打",true,{"key":20,"text":21,"correct":18},"C","根据基础的设计标高，宜先深后浅",{"key":23,"text":24,"correct":14},"D","根据桩的规格，宜先大后小，先短后长","BC","根据《建筑桩基技术规范》（JGJ94—2008）第7.4.4条规定，如果打桩顺序是从四周向中间打，由于打桩时的挤土效应，中间部分的桩会很难打进去；而且在打中间桩的时候，会对周围已经打进去的桩产生挤压，造成桩身倾斜、位移等。根据桩的规格，宜先大后小，先长后短。",{"id":6,"name":28,"category":29,"favorite":30},"岩土专业知识","建筑工程",0]