[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-981243":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},981243,709,2,"多选题","某高层建筑物造在饱和软土地基上，拟采用钢筋混凝土预制桩，为减少挤土对周边已建建筑物和道路下管线的影响，宜采取下列（ ）措施。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","增加桩长，提高单桩承载力，增加桩间距",true,{"key":16,"text":17,"correct":14},"B","沉桩方式由打入式改为静力压入",{"key":19,"text":20,"correct":14},"C","合理安排沉桩顺序，并控制沉桩速率",{"key":22,"text":23,"correct":24},"D","设置塑料排水板",false,"ABC","增大桩间距，采用静压法沉桩，合理安排沉桩顺序均可减小挤土的对周边已建建筑物及地下管线的影响，而设置排水板则不会有明显效果，因为饱和软土排水固结的时间较长，远大于桩基施工的时间。",{"id":6,"name":28,"category":29,"favorite":30},"岩土专业知识","建筑工程",0]