[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-981208":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},981208,709,2,"多选题","砂土和粉土地震液化的定量判别的方法有（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","低应变动测法",false,{"key":16,"text":17,"correct":18},"B","动三轴试验",true,{"key":20,"text":21,"correct":18},"C","标贯试验",{"key":23,"text":24,"correct":18},"D","剪切波波速试验","BCD","低应变动测法主要用于桩基完整性的检验，不用于地震液化的判定。",{"id":6,"name":28,"category":29,"favorite":30},"岩土专业知识","建筑工程",0]