[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-981073":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},981073,709,2,"多选题","对地下水采取降低水位措施时，应符合的规定有（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","施工中地下水位应保持在基坑底面以下0. 5 ~ 1. 5m",true,{"key":16,"text":17,"correct":14},"B","降水过程中应采取有效措施，防止土颗粒的流失",{"key":19,"text":20,"correct":14},"C","防止深层承压水引起的突涌，必要时应采取措施降低基坑下的承压水头",{"key":22,"text":23,"correct":24},"D","有渗流时，地下水的水头和作用宜通过渗流计算进行分析评价",false,"ABC","根据《岩土工程勘察规范》(GB 50021 -2001)(2009年版)第7. 3. 4条，对地下水采取降低水位措施时，应符合的规定有：①施工中地下水位应保持在基坑底面以下0.5-1.5m；②降水过程中应采取有效措施，防止土颗粒的流失；③防止深层承压水引起的突涌，必要时应采取措施降低基坑下的承压水头。",{"id":6,"name":28,"category":29,"favorite":30},"岩土专业知识","建筑工程",0]