[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-980898":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},980898,709,1,"单选题","岩土工程勘察工作量不包括（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","钻探工作量",false,{"key":16,"text":17,"correct":14},"B","工程物探工作量",{"key":19,"text":20,"correct":21},"C","制定方案工作量",true,{"key":23,"text":24,"correct":14},"D","采取试样工作量","岩土工程勘察工作量包括：①勘探点定点测量工作量；②工程地质测绘工作量；③钻探（钻孔、探井、探槽、平洞）工作量；④取土（水）、石试样工作量；⑤现场原位 测试工作量；⑥工程物探工作量；⑦室内试验工作量。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业知识","建筑工程",0]