[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-980882":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},980882,709,1,"单选题","下列各项不属于投标报价依据的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","本企业的经济实力",true,{"key":16,"text":17,"correct":18},"B","现场施工条件",false,{"key":20,"text":21,"correct":18},"C","本企业的施工组织管理水平及施工技术力量",{"key":23,"text":24,"correct":18},"D","施工组织设计或者施工方案","投标报价的主要依据包括：①招标文件（包括对技术、质量和工期的要求）；②施工图纸、设计文件及说明、工程量清单等；③现行建设预算定额或概算定额、单位估价表及收费标准；④材料预算价格和材料预算价差；⑤施工组织设计或施工方案； ⑥现场施工条件；⑦本企业施工组织管理水平及施工技术力量、设备装备能力等；⑧本企业过去同类工程施工成本数据；⑨影响报价的企业内部因素和市场信息。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业知识","建筑工程",0]