[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-980879":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},980879,709,1,"单选题","岩土工程的投标书中一般不应包括（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","承包工程的方式及投标综合说明",false,{"key":16,"text":17,"correct":14},"B","工程总报价和价格组成的分析",{"key":19,"text":20,"correct":21},"C","不可预见费用的估计",true,{"key":23,"text":24,"correct":14},"D","计划开、竣工日期及总工期","标书的内容有：①封面；②投标综合说明；③承包工程的方式；④工程总报价和价格组成的分析；⑤计划开、竣工日期及总工期；⑥施工组织设计及质量保证措施；⑦要求建设单位提供的配合条件。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业知识","建筑工程",0]