[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-980867":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},980867,709,1,"单选题","编制施工图预算时应套用（ ）标准。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","概算定额",false,{"key":16,"text":17,"correct":18},"B","预算定额",true,{"key":20,"text":21,"correct":14},"C","施工定额",{"key":23,"text":24,"correct":14},"D","综合预算定额","施工图预算，就是根据拟建工程已批准的施工图和已确定的施工方法（施工组织设计），按照国家或省市颁发的工程量计算规则，分部分项地把拟建工程各工程项目的工程量计算出来，在此基础上，逐项地套用相应的现行预算定额，以货币的形式确定其单位价值，累计其全部的定额直接工程费，再根据规定的各项费用的取费标准和计算程序，计算出工程所需的间接费用，最后综合计算出该项工程的造价和技术经济指标。",{"id":6,"name":27,"category":28,"favorite":29},"岩土专业知识","建筑工程",0]